10.07.2015 Views

Owners Manual - Air Compressors Direct

Owners Manual - Air Compressors Direct

Owners Manual - Air Compressors Direct

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SECTION 5MAINTENANCE & LUBRICATIONStopping for MaintenanceThe following procedures should be followed when stopping the compressor formaintenance or service:Step 1)Per OSHA regulation 1910.147: The Control of Hazardous EnergySource (Lockout/Tagout), disconnect and lockout the main powersource. Display a sign in clear view at the main power switchstating that the compressor is being serviced.WARNING !Never assume a compressor is safe to work on just because it is notoperating. It could restart at any time.Step 2)Step 3)Step 4)Step 5)Isolate the compressor from the compressed air supply by closinga manual shutoff valve upstream and downstream from the compressor.Display a sign in clear view at the shutoff valve stating thatthe compressor is being serviced.Lock open a pressure relief valve within the pressurized system toallow the system to be completely de-pressurized. NEVER removea plug to relieve the pressure!Open all manual drain valves within the area to be serviced.Wait for the unit to cool before starting to service. (Temperaturesof 125°F can burn skin. Some surface temperatures exceed 350°Fwhen the compressor is operating.)Maintenance ScheduleTo assure maximum performance and service life of your compressor, a routinemaintenance schedule should be developed. A sample schedule has beenincluded here to help you to develop a maintenance schedule designed for yourparticular application. Time frames may need to be shortened in harsherenvironments.At the back of this instruction manual you will find a MaintenanceSchedule Checklist. Make copies of this checklist and retain the master tomake more copies as needed. On a copy of the checklist, enter dates and initialsin the appropriate spaces. Keep the checklist and this Instruction <strong>Manual</strong>readily available near the compressor.Maintenance Schedule Checklist SampleEvery 8 Hours (or Daily)•QT-5, PLT-5, QT-7.5, PLT-7.5, QT-10, PLT-10 and Xtreme lubricantlevels should be kept at the top of the sight glass.•Maintain lubricant levels of QT-15, PLT-15, QT-30 & QT-54 modelsbetween high and low level marks on dipstick. Check the lubricantlevel several minutes after the compressor has run. (Discoloration ora higher lubricant level reading may indicate the presence of con-QT & PLT SeriesQuincy Compressor50161-106, January 2009 27 3501 Wismann Lane, Quincy Ill. - 62305-3116

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!