Detailed specification - DAN SWIFT - J. Lauritzen
Detailed specification - DAN SWIFT - J. Lauritzen
Detailed specification - DAN SWIFT - J. Lauritzen
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Starboard side<br />
General Arrangement, not to scale<br />
Deck Layout<br />
Deck 10: Bridge and Helideck<br />
Deck 9: Helicopter lounge and Office area<br />
Deck 8: Accommodaon - Officers<br />
Deck 7: Accommodaon – Crew and Coffee Shop<br />
Deck 6: Accommodaon – Workers, Shop, Life boats<br />
and Muster Staons<br />
Deck 5: Accommodaon - Workers, Galley, Mess Clean<br />
& Dirty, IT/day lounge,<br />
Deck 4: Offices, Conference and Video Conference rooms,<br />
Changing Rooms clean and dirty,<br />
A deck storage & Electrical Workshops<br />
Deck 3: Welding Shop<br />
Deck 2: Workshop Hot Works, Gymnasium and Swimming<br />
Pool<br />
Deck 1: Engine Control Room and Thruster Rooms<br />
Propulsion units<br />
Forward : 3 X 1200 kW tunnel thrusters (CPP)<br />
2 X 1500 kW azimuth thrusters (CPP)<br />
A: 2 X 1200 kW azimuth thrusters (CPP)<br />
1 X 2000 kW azimuth thruster (CPP)<br />
Total power: 11,000 kW<br />
Speed and consumpon<br />
Speed: 11.5 knots service speed<br />
Fuel consumpon: Approximately 20 mt/day at service<br />
speed (weather depending). HFO or MDO<br />
Fuel consumpon: Approximately 15-25 mt/day in DP<br />
mode (weather depending).<br />
Tank capacies and systems<br />
Fuel oil: 1,907 cbm<br />
Potable water: about 800 cbm<br />
An-heeling stabilizing system<br />
Supply systems for compressed air, water, power, fuel and<br />
bilge water.<br />
3