11.07.2015 Views

Analysis and inventory of FP7 marine-related proposals - European ...

Analysis and inventory of FP7 marine-related proposals - European ...

Analysis and inventory of FP7 marine-related proposals - European ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Analysis</strong> <strong>and</strong><strong>inventory</strong> <strong>of</strong> <strong>FP7</strong> <strong>marine</strong>-<strong>related</strong> ed <strong>proposals</strong>posa1. MethodologyThe methodology applied for identifying <strong>and</strong> analysing <strong>FP7</strong> <strong>marine</strong> <strong>related</strong> <strong>proposals</strong> selectedfor funding across the four specifi c programmes for calls published in 2007-2008 <strong>and</strong> closingbefore 31/12/2008 includes the following steps:1.1. Extraction <strong>of</strong> dataInformation has been extracted from the RTD database “Corda” as <strong>of</strong> 15th May 2010 47 . Onlythe projects in the main list have been considered to facilitate <strong>and</strong> improve the reliability <strong>of</strong> thedata (projects in reserve lists are not considered). The EU contribution amount mentioned inthis study for <strong>proposals</strong> selected for funding is based on the sum <strong>of</strong> the EU contribution <strong>of</strong>individual <strong>proposals</strong>. In other words, even though only part <strong>of</strong> the EU contribution may directlyrelate to <strong>marine</strong> activities, the whole EU contribution <strong>of</strong> the proposal has always been takeninto account. Therefore financial information provided in this analysis does not reflect theactual <strong>marine</strong>-<strong>related</strong> content <strong>of</strong> the project. All budget estimates are purely indicative <strong>and</strong>are mentioned only for information purposes. When, for some reason (i.e: grant agreement notsigned), there is no information on the “CORDA database” about the fi nal EU contribution, anextrapolation has been carried out on the basis either <strong>of</strong> the EC contribution requested by theproject or the EU contribution recommended during the negotiation process.1.2. Selection <strong>of</strong> calls for <strong>proposals</strong>The analysis has been carried out on the results <strong>of</strong> 109 calls having closed in 2007 <strong>and</strong> 2008in the four 48 specifi c programmes: “COOPERATION” (53 calls), “IDEAS” (5 calls), “PEOPLE”(21 calls), “CAPACITIES” (30 calls). Only the calls closing before 31/12/2008 have been considered,no matter the year mentioned in the call identifi er 49 . ERANETS calls falling under the“COOPERATION” (SP1) have been considered separately in order to distinguish them from thetraditional thematic calls <strong>and</strong> identify them more clearly. Certain very specifi c calls have beenexcluded from the analysis such as calls regarding joint technology initiatives (“ARTEMIS 2008-1” IMI-2008 -1 or “JU – ENIAC-1- 2008”) or certain article 169 initiatives such as “AAL-2008-1”). For the two-stage evaluation calls, only the fi rst stage has been considered for submitted<strong>proposals</strong> while only the fi nal results <strong>of</strong> the second stage have been considered for selected<strong>proposals</strong>.47The provisional data based on evaluation results are subject to modifi cation (see Disclaimer)48EURATOM calls have not been considered in this analysis49Indeed certain calls with «2009» in their call identifi er but closing in 2008 have been considered. See list <strong>of</strong> calls for details57

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!