Diesel Aerosol Measurement - Department of Mechanical ...
Diesel Aerosol Measurement - Department of Mechanical ...
Diesel Aerosol Measurement - Department of Mechanical ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
6. Temperature <strong>of</strong> exhaust at the inlet <strong>of</strong> the primary dilution tunnel<br />
Laboratory Response<br />
AEA Not measured<br />
Biel 450 o C max<br />
EMPA Not measured<br />
MTU Tailpipe: 270-400 o C, Tunnel inlet: 190 - 300 o C, Dilution air: 20 - 27 o C<br />
FEV The temperature is different and depend on test condition (vehicle/engine type, velocity). For<br />
diesel vehicle max. 300 °C.<br />
Ford Not measured<br />
EPCD Not measured<br />
UMN New Tunnel: Exhaust Temperature<br />
Old Tunnel: 300 °C<br />
7. Physical characteristics <strong>of</strong> the primary dilution tunnel<br />
Laboratory Response<br />
AEA The primary dilution tunnel is constructed <strong>of</strong> smooth bore stainless steel, 22 cm ID by 2.5 m<br />
long. The tunnel is earthed and the particulate sizing sampling point is ~2.2 m downstream <strong>of</strong><br />
the tunnel entrance.<br />
Biel AVL Smart Sampler 2, Model 472, partial flow system; Tunnel diameter: 70 mm, length 700 mm<br />
EMPA Chassis:<br />
• construction material: stainless steel,<br />
• electrical grounding: yes<br />
• inner diameter: ≈ 320 mm<br />
• length: ≈ 4000 mm<br />
• sampling about 4 m downstream <strong>of</strong> the mixing point<br />
Engine Dyno:<br />
• construction material: stainless steel,<br />
• electrical grounding: yes<br />
• inner diameter: ≈ 450 mm<br />
• length: ≈ 5000 mm<br />
• sampling about 4.6 m downstream <strong>of</strong> the mixing point<br />
MTU 16 gauge 304 stainless steel, diameter = 0.305 m, distance from exhaust inlet to sampling<br />
location is 4.57 m<br />
FEV The construction material consists <strong>of</strong> straight stainless steel and an electrical grounding. The<br />
inner diameter <strong>of</strong> the dilution tunnel is 320 mm, and its length is 4 m.<br />
Ford *<br />
EPCD construction material: stainless steel<br />
electrical grounding: yes<br />
inner diameter: 18 inches<br />
length: 13.8 feet<br />
UMN New tunnel: Stainless steel probe with a short transfer line connected t o a critical orifice<br />
upstream <strong>of</strong> an ejector pump model Air Vac TD110SS<br />
Old tunnel: same as above with a longer heated and insulated transfer line<br />
24