11.07.2015 Views

Report Descriptions - Oconee Fall Line Technical College

Report Descriptions - Oconee Fall Line Technical College

Report Descriptions - Oconee Fall Line Technical College

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DPR Sitehttps://kms.tcsg.edu/DPR/<strong>Report</strong>sResearch/<strong>Report</strong>Desc.aspxPage 19 of 2711/8/2012years later. Completing a <strong>College</strong> Level courseis determined by the student's grade of A, B orC. There is a drilldown to a summary by homecampus and from there a drilldown to studentdemographic information that is exportable toExcel.Students who are not in High School, enrolledfor the first time at any postsecondaryinstitution as a non-High School student whoenrolled in a Learning Support (remedial)course. Of this cohort, the number whocompleted a <strong>College</strong> Level course in the samesubject (Math, English or Both) during theirfirst two academic years, from the initial <strong>Fall</strong>Term enrolled, through the Summer Term twoyears later. Completing a <strong>College</strong> Level courseis determined by the student's grade of A, B orC. There is a drilldown to a summary by majorand from there a drilldown to studentdemographic information that is exportable toExcel.DC254Progress 2BSuccess inRemedial - ByMajorLevel2FYMIS<strong>Report</strong>#DC244DC257DC273Complete <strong>College</strong> Georgia/CCG System Level <strong>Report</strong>s<strong>Report</strong> Name Logon Term Source <strong>Report</strong> DescriptionCCG All MetricsSummary -SystemCCG DPR Internal- All Metrics -SystemCCG DPR TEST -All Metrics -SystemLevel2DPROnlyDPROnlyFYMIS8 MIS8 MISThe Context, Progress and Outcome metrics forComplete <strong>College</strong> Georgia (CCG) all in onereport for the TCSG System. This report has nodrilldown views to campus, major or student, itdisplays only the totals for the system (a sumof all the colleges).This version is for internal use by DPR StaffOnly as it displays the full report with data forfuture years before it's final. Used to checkdata before marking FINAL and makingavailable to the colleges and system office. TheContext, Progress and Outcome metrics forComplete <strong>College</strong> Georgia (CCG) all in onereport for the TCSG System. This report has nodrilldown views to campus, major or student, itdisplays only the totals for the system (a sumof all the colleges).This is TEST data. It is for internal use by DPRStaff Only for testing purposes and runsagainst CCA_STATE_TEST table. The Context,Progress and Outcome metrics for Complete<strong>College</strong> Georgia (CCG) all in one report for theTCSG System. This report has no drilldownviews to campus, major or student, it displaysonly the totals for the system (a sum of all thecolleges).Quarter to Semester/2012 Full Year <strong>Report</strong>s

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!