11.07.2015 Views

Flight 188 - uppsagd

Flight 188 - uppsagd

Flight 188 - uppsagd

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Data relating to <strong>Flight</strong> <strong>188</strong>Principal phases of the flight 187 launch campaign:Arrival of HERSCHEL in French Guiana January 29, 09EPC depreservation and erection in the launcher integration building(BIL)February 5, 09Transfer of Solid Booster Stages (EAP) February 5 & 6, 09Mating of the EAPs with the EPC February 9, 09Depreservation and erection of the Upper Composite February 11 & 14, 09V187: Success of the HOTBIRD TM 10/NSS-9/SPIRALE mission onlauncher L545February 12, 09Assembly of the ARF on the ESC-A February 16, 09Arrival of PLANCK in French Guiana February 18, 09Launcher Synthesis Control March 2, 09Launcher acceptance by Arianespace March 6, 09Transfer from BIL to BAF March 9, 09Launcher mothballing March 10, 09Launcher recovery April 16, 09Assembly of HERSCHEL on its adaptorHERSCHEL fuelling with hydrazineCryostat fuelling with LHeTransfer to the BAFAssembly on the SYLDA 5Assembly of PLANCK on its adaptorPLANCK fuelling with hydrazineTransfer to the BAFS/C integration on the launcherSYLDA integration on the launcherLaunch Rehearsal May 7, 09<strong>Flight</strong> Readiness Review (Part I) May 9, 09Final preparation of HERSCHELFairing integration on the launcher<strong>Flight</strong> Readiness Review (Part II)Arming of the launcherLauncher transfer from the BAF to the Pad (ZL3)Fuelling of the EPC helium sphereMarch 27, 09April 9, 09Bet. April 10 & 28, 09April 29, 09April 30, 09April 11, 09April 15 & 16, 09April 22, 09April 23, 09April 27, 09May 10, 09May 12, 09May 13, 09Final countdown May 14, 09Kourou: depreservation and erection ofthe EPC in the BIL© ESA/ARIANESPACE/Service optique CSG25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!