11.07.2015 Views

Flight 188 - uppsagd

Flight 188 - uppsagd

Flight 188 - uppsagd

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Data relating to <strong>Flight</strong> <strong>188</strong>7. Final countdownThe final countdown includes all operations for preparation of the launcher, satellites andlaunch base. Correct execution of these operations authorizes ignition of the Vulcain engine,followed by the solid propellant boosters at the selected launch time, as early as possible insidethe launch window for the satellites. The countdown terminates with a synchronized sequencemanaged by the Ariane ground checkout computers, starting at H 0 - 7 min. In some cases, apre-synchronized sequence may be necessary to optimize fuelling of the main cryogenic stage(*). If a countdown hold pushes time H 0 outside the launch window, the launch is postponed toD+1 or D+2, depending on the nature of the problem and the solution adopted.H0 - 7 hours 30H0 - 6 hoursH0 - 5 hoursH0 - 5 hoursH0 - 4 hoursH0 - 3 hoursH0 - 30 minutesCheckout of electrical systems.Flushing and configuration of the EPC and Vulcain engine for fuellingand chill-downFinal preparation of the launch pad: closure of doors, removal of safetybarriers, configuration of the fluid circuits for fuelling.Loading of the flight programTesting of radio links between the launcher and BLAAlignment of inertial guidance unitsEvacuation of personnel from the launch padFuelling of the EPC in four phases:pressurization of the ground tanks (30 minutes)chill-down of the ground lines (30 minutes)fuelling of the stage tanks (2 hours)topping up (up to synchronized sequence)Pressurization of the attitude control and command systems:(GAT for the EAPs and GAM for the EPC)Fuelling of the ESC-A stage in four phases:pressurization of the ground tanks (30 minutes)chill-down of the ground lines (30 minutes)fuelling of the stage tanks (1 hour)topping up (up to synchronized sequence)Chill-down of the Vulcain enginePreparation of the synchronized sequenceH0 - 7 minutes Beginning of the synchronized sequence (*)(*) The standard synchronised sequence will start at T 0 - 7 minutes, incorporating all finallauncher operations leading to lift-off. By comparison, the stretched synchronised sequence forflight 173 commenced at T 0 - 12 minutes, to cater for top-up LOX fuelling of the EPC stage tomeet mission performance requirements.28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!