11.07.2015 Views

Federal Nation Building Program Signage Guidelines ... - Transport

Federal Nation Building Program Signage Guidelines ... - Transport

Federal Nation Building Program Signage Guidelines ... - Transport

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Issued: 8 July 2009<strong>Signage</strong> <strong>Guidelines</strong>Department of Infrastructure, <strong>Transport</strong>, LocalGovernment and Regional Development


<strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>BACKGROUNDThis document sets out the guidelines for signage relating toprojects funded under the <strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>, administeredthrough the Department of Infrastructure, <strong>Transport</strong>, LocalGovernment and Regional Development.These guidelines do not override the signage and publicrecognition requirements set out in the Agreements, FundingConditions and/or Notes on Administration governing individualprojects or programs.Under some components of the <strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>, fundingrecipients will be required to submit a signage plan setting outproposed temporary and permanent signage for a project whenapproval for construction is sought. The funding recipient may alsobe required to certify in the annual fi nancial statement and auditreport that required signage has been erected in accordance withrelevant agreements and signage plans.For all enquiries regarding signage please liaise with the relevantproject offi cer within the Department of Infrastructure, <strong>Transport</strong>,Regional Development and Local Government.Note: • All pre-existing signage remains in place; and• <strong>Building</strong> Australia Fund and Major Cities projectswill have a separte set of guidelines.CONTENTSSign requirements 1Size & digital templates 2Colour 3Major Road project (fully Australian Government funded) 4Major Road project (jointly funded) 5Major Rail project (fully Australian Government funded) 6Major Rail project (jointly funded) 7Roads to Recovery project 8Black Spot <strong>Program</strong> project 9Boom Gates for Rail Crossings <strong>Program</strong> project 10Heavy Vehicle Safety and Productivity <strong>Program</strong> project(fully Australian Government funded) 11Heavy Vehicle Safety and Productivity <strong>Program</strong> project (jointly funded) 12Off-Network project (fully Australian Government funded) 13Off-Network project (jointly funded) 14Commemorative plaque (fully Australian Government funded) 15<strong>Signage</strong> <strong>Guidelines</strong> July 2009


<strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>PAGE 1SIGN REQUIREMENTSThe following requirements relate mainly to Major Road and Rail projects. For other components ofthe <strong>Nation</strong> <strong>Building</strong> <strong>Program</strong> funding recipients should refer to the relevant agreement, conditionsand/or guidelines.Signs are not to be obscured by roadside objects, including any other information signs and must bemaintained for one year beyond the opening of the project. On major construction projects, a projectspecifi c sign is to be placed at each end of the physical work, facing oncoming traffi c. The proponent isto consider any safety issues regarding signage placement.Where a project is fully funded by the Australian Government, there are to be no signs givingpublic recognition to the relevant state/territory government or authority other than an auxiliarysign affi xed below the main <strong>Nation</strong> <strong>Building</strong> <strong>Program</strong> sign. The auxiliary sign will be of the samewidth and approximately ⅓ height of the main panel. Text generally will be “Project managed bythe ”.The funding recipient will be required to submit fi nal proofs of signs and commemorative plaques tothe relevant project offi cer within the Department of Infrastructure, <strong>Transport</strong>, Regional Developmentand Local Government for clearance prior to production. Sign sizes, text sizes, style, colour andmaterials will be in accordance with the examples outlined in this document.Where a project is jointly funded the parties agree to consult and agree on, before works commence,the sizes, text styles, colour, material and site display requirements of signs in relation to the project.Generally, this will be in keeping with the examples in this document.Note: All pre-existing signage remains in place.<strong>Signage</strong> <strong>Guidelines</strong> July 2009


<strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>PAGE 2SIZEFor national road and rail projects the main sign may be one of two sizesaccording to the visibility requirements of the site:• 3000mm wide by 1600mm high for major <strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>projects in open road locations; and• 2000mm wide by 1400mm high for locations where physical spaceis limited (proportions of larger sign option must be maintained).For Roads to Recovery, Black Spot <strong>Program</strong> and Heavy Vehicle Safety andProductivity <strong>Program</strong>, the main sign should be:• 900mm wide by 1200mm high.For Boom Gates for Rail Crossings the main sign should be:• 600mm wide by 900mm high.This smaller sign can also be used for Roads to Recovery and Black Spot<strong>Program</strong>. The proportions of the standard sign must be maintained when using asmaller sign.For Off-Network projects, any of the sizes stipulated above can be useddepending on the cost and location of the project. For major Off-Network projectssee pages 4 and 5 of these guidelines. For minor Off-Network projects seepages 13 and 14. Local Government logos can be used in place of the stategovernment logo.DIGITAL FILE TEMPLATESThe following digital fi les are available fromThe Department of Infrastructure, <strong>Transport</strong>,Regional Development and Local Governmentvia iimedia@infrastructure.gov.au or by download from theDepartment’s project management system.• 3000mm x 1600mm Indesign template (CS3)• 2000mm x 1400mm Indesign template (CS3)• 900mm x 1200mm Indesign template (CS3)• <strong>Nation</strong> <strong>Building</strong> <strong>Program</strong> logo (eps)• Roads to Recovery logo (eps)• Black Spot <strong>Program</strong> logo (eps)• Australian Government crest (eps)<strong>Signage</strong> <strong>Guidelines</strong> July 2009


<strong>Nation</strong> <strong>Building</strong> <strong>Program</strong> PAGE 3COLOURColour for all reproduction methods must be matched as closely as possible to thePantone standards. Allowances should be made for variations between materials.PMS 605C 0%M 2%Y 100%K 8%PMS 144C 0%M 52%Y 100%K 0%PMS 313C 100%M 0%Y 10%K 4%PMS 186C 0%M 100%Y 75%K 4%PMS 361C 75%M 0%Y 100%K 0%PMS 7535C 7%M 0%Y 22%K 20%PMS 2945C 100%M 52%Y 2%K 12%BlackC 0%M 0%Y 0%K 100%FONTSArial BlackArial BoldArial<strong>Signage</strong> <strong>Guidelines</strong> July 2009


<strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>PAGE 43000mm35mmWhiteborder<strong>Program</strong>:<strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>1600mmHume Highway UpgradeCompletion date: April 2010www.nationbuildingprogram.gov.au13kmAlbury5kmWodonga730mm 680mm 120mmProject:Sign:Font:Colour specs:PMS 605PMS 361C 0%M 2%Y 100%K 8%C 75%M 0%Y 100%K 0%Major <strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>road projectsFully Australian Government fundedArial Black, Arial Bold, ArialPMS 144PMS 7535C 0%M 52%Y 100%K 0%C 7%M 0%Y 22%K 20%PMS 313PMS 2945C 100%M 0%Y 10%K 4%C 100%M 52%Y 2%K 12%PMS 186BlackC 0%M 100%Y 75%K 4%C 0%M 0%Y 0%K 100%35mmWhite borderall around50mmNOTE: Only informationto change per project50mm35mmWhiteborderRed block430mm (w)Note: See page 2 for smaller sign specifi cations.Green block1200mm (w)Blue block1200mm (w)<strong>Signage</strong> <strong>Guidelines</strong> July 2009


<strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>PAGE 5NOTE: Use appropriate State or Territory logo3000mm35mmWhiteborder<strong>Program</strong>:<strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>Project:Major <strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>road projects1600mmHume Highway UpgradeCompletion date: April 2010www.nationbuildingprogram.gov.auAlbury5kmWodongaStateGovernmentlogo whiteon black13km730mm 680mm 120mmSign:Font:Colour specs:PMS 605PMS 361C 0%M 2%Y 100%K 8%C 75%M 0%Y 100%K 0%Jointly fundedArial Black, Arial Bold, ArialPMS 144PMS 7535C 0%M 52%Y 100%K 0%C 7%M 0%Y 22%K 20%PMS 313PMS 2945C 100%M 0%Y 10%K 4%C 100%M 52%Y 2%K 12%PMS 186BlackC 0%M 100%Y 75%K 4%C 0%M 0%Y 0%K 100%35mmWhite borderall around50mmNOTE: Only informationto change per project50mm35mmWhiteborderRed block430mm (w)Green block1200mm (w)Blue block1200mm (w)Note: See page 2 for smaller sign specifi cations.<strong>Signage</strong> <strong>Guidelines</strong> July 2009


<strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>PAGE 63000mm35mmWhiteborder<strong>Program</strong>:<strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>Project:Major <strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>rail projects1600mmSydney Southern Rail AccessCompletion date: April 2010www.nationbuildingprogram.gov.au13kmAlbury5kmWodonga730mm 680mm 120mmSign:Font:Colour specs:PMS 605PMS 361C 0%M 2%Y 100%K 8%C 75%M 0%Y 100%K 0%Fully Australian Government fundedArial Black, Arial Bold, ArialPMS 144PMS 7535C 0%M 52%Y 100%K 0%C 7%M 0%Y 22%K 20%PMS 313PMS 2945C 100%M 0%Y 10%K 4%C 100%M 52%Y 2%K 12%PMS 186BlackC 0%M 100%Y 75%K 4%C 0%M 0%Y 0%K 100%35mmWhite borderall around50mmNOTE: Only informationto change per project50mm35mmWhiteborderRed block430mm (w)Note: See page 2 for smaller sign specifi cations.Green block1200mm (w)Blue block1200mm (w)<strong>Signage</strong> <strong>Guidelines</strong> July 2009


<strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>PAGE 7NOTE: Use appropriate State or Territory logo3000mm35mmWhiteborder<strong>Program</strong>:<strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>1600mmSydney Southern Rail AccessCompletion date: April 2010www.nationbuildingprogram.gov.auAlbury5kmWodongaStateGovernmentlogo whiteon black13km730mm 680mm 120mmProject:Sign:Font:Colour specs:PMS 605PMS 361C 0%M 2%Y 100%K 8%C 75%M 0%Y 100%K 0%Major <strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>rail projectsJointly fundedArial Black, Arial Bold, ArialPMS 144PMS 7535C 0%M 52%Y 100%K 0%C 7%M 0%Y 22%K 20%PMS 313PMS 2945C 100%M 0%Y 10%K 4%C 100%M 52%Y 2%K 12%PMS 186BlackC 0%M 100%Y 75%K 4%C 0%M 0%Y 0%K 100%35mmWhite borderall around50mmNOTE: Only informationto change per project50mm35mmWhiteborderRed block430mm (w)Note: See page 2 for smaller sign specifi cations.Green block1200mm (w)Blue block1200mm (w)<strong>Signage</strong> <strong>Guidelines</strong> July 2009


<strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>PAGE 8900mm20mmWhiteborder<strong>Program</strong>:Project:<strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>Roads to Recovery1200mmwww.nationbuildingprogram.gov.au520mm 550mm 90mmFont:Colour specs:PMS 605PMS 361C 0%M 2%Y 100%K 8%C 75%M 0%Y 100%K 0%Arial Bold, ArialPMS 144PMS 7535C 0%M 52%Y 100%K 0%C 7%M 0%Y 22%K 20%PMS 313PMS 2945C 100%M 0%Y 10%K 4%C 100%M 52%Y 2%K 12%PMS 186BlackC 0%M 100%Y 75%K 4%C 0%M 0%Y 0%K 100%Note: See page 2 for smaller sign specifi cations.20mmWhiteborder<strong>Signage</strong> <strong>Guidelines</strong> July 2009


<strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>PAGE 9900mm20mmWhiteborder<strong>Program</strong>:<strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>Project:Black Spot <strong>Program</strong>1200mmBlack Spot <strong>Program</strong>www.nationbuildingprogram.gov.au520mm 550mm 90mmFont:Colour specs:PMS 605PMS 361C 0%M 2%Y 100%K 8%C 75%M 0%Y 100%K 0%Arial Black, Arial BoldPMS 144PMS 7535C 0%M 52%Y 100%K 0%C 7%M 0%Y 22%K 20%PMS 313PMS 2945C 100%M 0%Y 10%K 4%C 100%M 52%Y 2%K 12%PMS 186BlackC 0%M 100%Y 75%K 4%C 0%M 0%Y 0%K 100%Note: See page 2 for smaller sign specifi cations.20mmWhiteborder<strong>Signage</strong> <strong>Guidelines</strong> July 2009


<strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>PAGE 10600mm15mmWhiteborder<strong>Program</strong>:Project:Font:<strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>Boom Gates for Rail CrossingsArial Bold900mmBlack Spot <strong>Program</strong>Boom Gates forRail Crossingswww.nationbuildingprogram.gov.au500mm 300mm 70mmColour specs:PMS 605PMS 361C 0%M 2%Y 100%K 8%C 75%M 0%Y 100%K 0%PMS 144PMS 7535C 0%M 52%Y 100%K 0%C 7%M 0%Y 22%K 20%PMS 313PMS 2945C 100%M 0%Y 10%K 4%C 100%M 52%Y 2%K 12%PMS 186BlackC 0%M 100%Y 75%K 4%C 0%M 0%Y 0%K 100%15mmWhiteborder<strong>Signage</strong> <strong>Guidelines</strong> July 2009


<strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>PAGE 11900mm20mmWhiteborder<strong>Program</strong>:Project:<strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>Heavy Vehicle Safety andProductivity <strong>Program</strong>Font:Arial Bold1200mmBlack Spot <strong>Program</strong>Heavy Vehicle Safety andProductivity <strong>Program</strong>www.nationbuildingprogram.gov.au700mm 360mm 100mmColour specs:PMS 605PMS 361C 0%M 2%Y 100%K 8%C 75%M 0%Y 100%K 0%PMS 144PMS 7535C 0%M 52%Y 100%K 0%C 7%M 0%Y 22%K 20%PMS 313PMS 2945C 100%M 0%Y 10%K 4%C 100%M 52%Y 2%K 12%PMS 186BlackC 0%M 100%Y 75%K 4%C 0%M 0%Y 0%K 100%20mmWhiteborder<strong>Signage</strong> <strong>Guidelines</strong> July 2009


<strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>PAGE 12900mm20mmWhiteborderNOTE: Use appropriateState or Territory logo<strong>Program</strong>:<strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>1200mmStateGovernmentlogo whiteon blackBlack Spot <strong>Program</strong>Heavy Vehicle Safety andProductivity <strong>Program</strong>www.nationbuildingprogram.gov.au700mm 360mm 100mmProject:Sign:Font:Colour specs:PMS 605PMS 361C 0%M 2%Y 100%K 8%C 75%M 0%Y 100%K 0%Heavy Vehicle Safety andProductivity <strong>Program</strong>Jointly FundedArial BoldPMS 144PMS 7535C 0%M 52%Y 100%K 0%C 7%M 0%Y 22%K 20%PMS 313PMS 2945C 100%M 0%Y 10%K 4%C 100%M 52%Y 2%K 12%PMS 186BlackC 0%M 100%Y 75%K 4%C 0%M 0%Y 0%K 100%20mmWhiteborder<strong>Signage</strong> <strong>Guidelines</strong> July 2009


<strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>PAGE 13900mm20mmWhiteborder<strong>Program</strong>:Project:Sign:<strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>Off-NetworkFully Australian Government funded1200mmBlack Spot <strong>Program</strong>Project titlewww.nationbuildingprogram.gov.au700mm 360mm 100mmFont:Colour specs:PMS 605PMS 361C 0%M 2%Y 100%K 8%C 75%M 0%Y 100%K 0%Arial BoldPMS 144PMS 7535NOTE: Only information to change per projectC 0%M 52%Y 100%K 0%C 7%M 0%Y 22%K 20%PMS 313PMS 2945C 100%M 0%Y 10%K 4%C 100%M 52%Y 2%K 12%PMS 186BlackC 0%M 100%Y 75%K 4%C 0%M 0%Y 0%K 100%Note: See page 2 for other sign specifi cations.20mmWhiteborder<strong>Signage</strong> <strong>Guidelines</strong> July 2009


<strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>PAGE 14900mm20mmWhiteborderNOTE: Use appropriateState or Territory logo<strong>Program</strong>:Project:<strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>Off-Network1200mmProject titleStateGovernmentlogo whiteon blackBlack Spot <strong>Program</strong>www.nationbuildingprogram.gov.au700mm 360mm 100mmSign:Font:Colour specs:PMS 605PMS 361C 0%M 2%Y 100%K 8%C 75%M 0%Y 100%K 0%Jointly FundedArial BoldPMS 144PMS 7535NOTE: Only information to change per projectC 0%M 52%Y 100%K 0%C 7%M 0%Y 22%K 20%PMS 313PMS 2945C 100%M 0%Y 10%K 4%C 100%M 52%Y 2%K 12%PMS 186BlackC 0%M 100%Y 75%K 4%C 0%M 0%Y 0%K 100%Note: See page 2 for other sign specifi cations.20mmWhiteborder<strong>Signage</strong> <strong>Guidelines</strong> July 2009


<strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>PAGE 15NOTE: Only informationto change per project<strong>Program</strong>:Project:Sign:Font:<strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>Commemorative PlaqueFully Australian Government fundedArial Black, Arial Bold, ArialTown Name BypassColour specs:Officially opened: September 2009, byMinisters NameTHE FEDERAL MINISTERMinisters NameTHE STATE MINISTERPMS 605C 0%M 2%Y 100%K 8%PMS 144C 0%M 52%Y 100%K 0%PMS 313C 100%M 0%Y 10%K 4%PMS 186C 0%M 100%Y 75%K 4%PMS 361C 75%M 0%Y 100%K 0%PMS 7535C 7%M 0%Y 22%K 20%PMS 2945C 100%M 52%Y 2%K 12%BlackC 0%M 0%Y 0%K 100%<strong>Signage</strong> <strong>Guidelines</strong> July 2009


<strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>PAGE 16NOTE: Only informationto change per project<strong>Program</strong>:Project:Sign:Font:<strong>Nation</strong> <strong>Building</strong> <strong>Program</strong>Commemorative PlaqueJointly fundedArial Black, Arial Bold, ArialTown Name BypassColour specs:Officially opened: September 2009, byMinisters NameTHE FEDERAL MINISTERMinisters NameTHE STATE MINISTERPMS 605C 0%M 2%Y 100%K 8%PMS 144C 0%M 52%Y 100%K 0%PMS 313C 100%M 0%Y 10%K 4%PMS 186C 0%M 100%Y 75%K 4%StateGovernmentlogo whiteon blackPMS 361C 75%M 0%Y 100%K 0%PMS 7535C 7%M 0%Y 22%K 20%PMS 2945C 100%M 52%Y 2%K 12%BlackC 0%M 0%Y 0%K 100%NOTE: Use appropriate State or Territory logo<strong>Signage</strong> <strong>Guidelines</strong> July 2009

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!