11.07.2015 Views

Zucchini High Power SCP - HR - Legrand

Zucchini High Power SCP - HR - Legrand

Zucchini High Power SCP - HR - Legrand

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>SCP</strong>SUPER COMPACTInstallation guidelinesINSTALLATION SEQUENCE OF THE JUNCTIONThe installation instructions are placed on every element near the junction (Fig.1)Make sure that the contacts are clean.30 mmJoin the two elements together.(Fig. 1)(Fig. 2)270 mmMake sure that the earth plate of the straight element is inserted behind thefront plate of the junction monobloc (Fig.2)The positioning pin on the monobloc should be fitted into the correspondingslot on the earth plate. Verify the distance between elements, 270mm, beforetightening the monobloc completely (Fig.3).(Fig. 3)Tighten the bolt of the monobloc until the 1st head breaks off (Fig. 4).The bolt that tightens the monobloc has a second head which is used whencarrying out operations or inspections on the line.The nominal tightening torque is 85Nm.(Fig. 4)85NmInstall the covers of the junction (Fig. 5).(Fig. 5)Connection completed correctly with degree of protection IP55 (Fig. 6).(Fig. 6)49HIGH POWER GENERAL CATALOGUE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!