2. Health Services• Construction of BHU in Doteng and Shaba Gewogs doesn’tfulfill the requirement for New BHU as per MoH criteria• Upgradation of BHU from Gr –II to Gr – I at Bitekha andDrugyel doesn’t fulfill the requirement for New BHU as perMoH criteria, therefore budget could not be utilized.3. Education Services• 20% deviation amount included in every capital activitiesunlike other sectors• All the capital works were executed with the lower quotedrates not as provisioned in the plan outlay• Some of the capital works incorporated in the 10 th FYP weredropped, since the same works were executed through worldbank project. The budgets are still reflected in the total outlay