11.07.2015 Views

Deep Bay Link and HK-Shenzhen Western Corridor

Deep Bay Link and HK-Shenzhen Western Corridor

Deep Bay Link and HK-Shenzhen Western Corridor

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Deep</strong> <strong>Bay</strong> <strong>Link</strong> <strong>and</strong><strong>HK</strong>-<strong>Shenzhen</strong> <strong>Western</strong> <strong>Corridor</strong>


<strong>HK</strong>-<strong>Shenzhen</strong><strong>Western</strong> <strong>Corridor</strong>


<strong>Deep</strong> <strong>Bay</strong> <strong>Link</strong>(north <strong>and</strong> south section)


Route 8 Trunk Road


SHENZHENRoute 8Alignment9Yuen LongTuen Mun83Tsing Yi7.6kmStonecuttersBridgeRoute 8Sha Tin15.9km724


Route 8 between Tsing Yi <strong>and</strong> Cheung Sha Wan– Major Elements of WorksRoute 3 Kwai Chungto Tsing Yi SectionTsing YiEast Tsing Yi ViaductRambler ChannelNam Wan TunnelCT9Ngong ShuenChau ViaductStonecutters Bridge1000m spanCT8Stonecutters Isl<strong>and</strong>


Route 8 between Cheung Sha Wan <strong>and</strong> Sha TinMajor Elements of WorksEagle’s Nest TunnelSha Tin Heights TunnelToll PlazaLai Chi Kok ViaductKowloon SectionSha Tin Section


Interchange at Cheung Sha Wan <strong>and</strong> Ngong Shuen Chaucrossing WKH heading to the Stonecutters BridgeWest Kowloon Highway


Joining Route 8 to the existing road system in Tai WaiTo Shing MunTunnel (Route 5)


Stonecutters Bridge298mPD73.5mPDClear Span = 1018m


Central Reclamation Phase III


Central <strong>and</strong> Admiralty as seen in 2002 before the reclamation


Various proposal forthe future harbourfrontafter the completion ofCentral-WanchaiReclamation


Demolish <strong>and</strong> rebuildingthe piers for Star Ferry


Work status as seen in October 2006

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!