11.07.2015 Views

Insurance Requirements - Regional Transportation Commission of ...

Insurance Requirements - Regional Transportation Commission of ...

Insurance Requirements - Regional Transportation Commission of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Contractor will be responsible for the deductible amounts, per each occurrence, as show above, or asadjusted by the <strong>Regional</strong> <strong>Transportation</strong> <strong>Commission</strong> <strong>of</strong> Southern Nevada’s Builders Risk policy fromyear to year. The Owner will make every attempt to maintain the deductibles from year to year, butthe Contractor will be responsible for the deductibles as they are negotiated. The Owner will give theContractor 30 calendar days notice <strong>of</strong> any change in the existing deductibles. The Contractor shallhave the right, upon notice <strong>of</strong> an increase in the deductibles as shown, to justify a change order to helpcompensate the Contractor for costs associated with an increase in deductibles as shown.It is the Contractor’s responsibility to be familiar with the current coverages described in this Section.The Contractor shall immediately report any incident or claim, no later than 24 hours after occurrence,against any insurance furnished by the Owner, to the Owner’s Designated Representative in writing <strong>of</strong>details <strong>of</strong> the incident.The Contractor shall, at the same time, forward to the Owner’s Purchasing Representative and Owner’sinsurance agent as specified above. The Contractor shall provide any and all documentation relative toloss and damage via delivery receipts, bills <strong>of</strong> lading, material invoices, acknowledgement forms, etc.In the event <strong>of</strong> a claim, the Contractor shall meet with the owner to determine the quantities <strong>of</strong>replacement materials and/or equipment. The Contractor shall be responsible for the reordering <strong>of</strong> allitems upon direction <strong>of</strong> the Owner’s Designated Representative. Owner’s payment for these materialsand equipment shall not be made until deliver to the job site. The payment(s) are subject to thedeductible amount as identified within this Section.The Owner reserves the right to require the Contractor furnish the contractor’s actual insurancepolicies for examination by the Owner.Non-RTC-Owned Property: Unless otherwise provided in the Contract Documents, the Contractorshall purchase and maintain property insurance (Builder’s Risk) upon the work at the site to the fullinsurable value, This insurance shall include the interests <strong>of</strong> the Owner, Owner’s DesignatedRepresentative, Contractor, and Subcontractors <strong>of</strong> any tier. Coverage shall be written on forms toinclude fire, extended coverage and special form including theft. Contractor is responsible for thedeductible for any claim made against the policy. A separate certificate <strong>of</strong> insurance evidencing thecoverage required herein shall be provided to the Owner.6. Asbestos Liability <strong>Insurance</strong>The Contractor shall provide and maintain Asbestos Liability <strong>Insurance</strong> insuring against claims forbodily injury (including wrongful death) and property resulting from the presence or removal <strong>of</strong>asbestos on the Project Site. A separate certificate <strong>of</strong> insurance evidencing the coverage requiredherein shall be provided to the Owner.Scope <strong>of</strong> Coverage:Type <strong>of</strong> Coverage:Amount <strong>of</strong> Coverage:Policy Period:Named Insured:Non-Project SpecificOccurrence Basis$1,000,000 per occurrence$2,000,000 aggregateAnnual PolicyContractor7. Installation Floater <strong>Insurance</strong>The Contractor shall provide and maintain Installation Floater <strong>Insurance</strong> insuring against damage ordestruction <strong>of</strong> the materials or equipment in transit to, or stored on or <strong>of</strong>f the Project Site which is to beused in the Work. A separate certificate <strong>of</strong> insurance evidencing the coverage required herein shall beprovided to the Owner.Scope <strong>of</strong> Coverage:Type <strong>of</strong> Coverage:Non-Project SpecificOccurrence Basis

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!