a full-size soccer field and space fortwo baseball/softball fields. Accordingto school district plans, the fields willbe shared with city recreational programsas part of a joint-use agreement.At this writing, field completion wasexpected imminently. The elementaryschool, which has been open since August,cost slightly more than $19 millionto build, with $375,550 directed tothe field.In Ocean Springs MS, at this writing,the Ocean Springs School Districtwas expecting to apply for wetlandspermits that would permit constructionof a new high school, which isscheduled to open in December 2011.The district has $11 million lined up forthe new school, and voters approved aproperty tax increase to cover the remainderof the $50 million cost. Apartfrom building a new high school, theplan involves creating a pre-K programfor 300 to 350 children, and expansionand remodeling of the middle and elementaryschools.In the Pacific Northwest, educationrelatedconstruction projects collective-ly valued in the hundreds of millionsare currently underway or expected tobegin this year. Community Colleges ofSpokane is planning about $155 millionof construction. The biggest projectsare a technical education building atSpokane Community College and anew science building at Spokane FallsCommunity College; cost estimates are$34.6 million and $31 million, respectively.Expansion,ModernizationThe biggest Spokane Public Schoolsproject, a nearly $75 million expansionand modernization of Shadle Park HighSchool, is in the third of five phases,with completion expected in Summer2010. Another substantial project,although the timeline is cloudy, is aplanned $37 million science center atWhitworth University, which would bethe initial phase of a planned $53 millionoverhaul of the school’s sciencefacilities.In Pittsburgh PA, the Penn Hillsschool board has voted to advanceplans for a new building for its highschool students. The board authorizedthe architect to develop plans overthe next 12 months. The new 239,400-square-foot high school will accommodategrades nine through 12 and willbe 20,000 square feet larger than thecurrent building, which houses grades10 to 12. At the earliest, the buildingwill open for the 2011-12 school year.Additionally, the school board is mullingmiddle and elementary schoolchanges as part of a long-term fiscalplan: the reconfiguration of buildingsfor kindergarten through eighth gradestudents.Full SlateIn New Brunswick NJ, education-relatedconstruction activity is hopping.The Board of Education, city and statehave undertaken the construction of anew high school in New Brunswick, anew A.C. Redshaw Elementary school,a renovation of Paul Robeson ElementarySchool and three new kindergartencenters. The total cost is estimatedat $70 million. The construction of the74 <strong>Sound</strong> & <strong>Communications</strong>www.soundandcommunications.com
new high school has begun, with aplanned opening in September 2010.The high school, situated on a 26-acresite, will be 400,000 square feet andaccommodate 2000 students. It boastsa flexible design allowing the schoolto have either departmental units orsmaller academies. The communitycan make use of the four athletic facilities,gymnasiums, auditoriums andcommon areas after school. Start datefor the Redshaw School is second orthird quarter <strong>2009</strong>, with completion inQ1/11.In Eugene OR, a construction projectfor a new alumni center at theUniversity of Oregon is ready to commencenext Winter, after receiving $3million in gifts. Planned to be built onthe southwest corner of the new MatthewKnight Arena site, the CherylRamber Ford and Allyn Ford AlumniCenter will serve as a welcome centerfor prospective students, alumni andcampus visitors. The 60,000-square-footcenter will feature event space, a lobby,a lounge, additional conference roomsand multipurpose gathering spaces. Aninteractive multimedia installation willbe included in the project, as well.Badgers Forge AheadIn Madison WI, the University ofWisconsin is developing a $25 millionhockey arena/practice facility next tothe Kohl Center. The building wouldbe home to the women’s games and apractice venue for men’s and women’steams. It would also consolidate someof their support spaces. At this writing,the university was preparing to selectan architect to design a four-level buildingwith bench seating for 2400 spectators,concessions and restrooms. Projectorganizers hope to break ground in2010 for a Fall 2012 opening.The University of Iowa (UI) estimatesthat, if the arts campus is rebuiltin a different location, it will costnearly $750 million to recover the campuscompletely from June 2008 flooding.That is more than triple the $232million estimate for damages that wasproduced shortly after the flood. AfterFederal Emergency ManagementAgency (FEMA) and insurance moneyare taken into account, UI will be responsiblefor paying $185 million of thecosts. The large, afore-referenced figureassumes rebuilding two complexesin new locations; if UI rebuilds the artscampus in its current location, the totalcost would be $590 million. However,UI’s cost burden in either scenariowould differ by only $10 million afterinsurance and FEMA dollars are takeninto account.Capturing students’ attention, andaiding in their information retention,has become critical for today’s schoolsand colleges. Administrators and teachershave realized that technology—bothaudiovisual and IT—accomplishes bothtasks, while also giving the teachermore options and greater flexibility.As stimulus money is pumped throughthe veins of the economy, the ObamaAdministration has promised to makeeducation a priority. As such, savvysystems integrators will redouble theirefforts in this space.n<strong>May</strong> <strong>2009</strong> 75
- Page 1 and 2:
Vol. 55 No. 5 May 18, 2009tailoring
- Page 3 and 4:
The integrator’s dreamPowerful. F
- Page 5 and 6:
SANYO.XTC50L.SC_May09.pdf SANYO.XTC
- Page 7 and 8:
Deep beneath the quality sound, yea
- Page 9 and 10:
NEWSLETTERATLAS SOUND ACQUIRES ALL
- Page 12 and 13:
Why Aren’t AV Manufacturers Lever
- Page 14 and 15:
Line Source Column LoudspeakersA ne
- Page 16 and 17:
Figure 2. Polar diagram forwell des
- Page 18:
Sound DirectionsFocused audio impro
- Page 22 and 23:
InfoComm 100A step in the right dir
- Page 24: A Microcosm Of ProgressBeallwood Ba
- Page 27 and 28: and sing, rather than to look down,
- Page 30 and 31: Improve Your BusinessPrep for the n
- Page 32 and 33: Standards For The AV IndustryThe co
- Page 34 and 35: lighting and control, to name a few
- Page 36 and 37: Rx For Success ConclusionIndustry
- Page 38 and 39: Hungry Up-And-ComerCommercial Satel
- Page 40 and 41: The Florida CoastalSchool of Law (F
- Page 42 and 43: presentations to students or for la
- Page 44 and 45: “Just last week, we had several c
- Page 46 and 47: There are 40-inch ceiling-mounted L
- Page 48 and 49: Then, on the fifth floor, in a larg
- Page 50 and 51: TailoringTechnologyTo TeachingCoppi
- Page 52: eview, study and training purposes.
- Page 55 and 56: Help CobraNet ® Work Smarterwith A
- Page 57 and 58: tionally, the low-profile trim arou
- Page 59 and 60: w w w . y a m a h a c a . c o mThe
- Page 61 and 62: A sliding whiteboard disappears int
- Page 63 and 64: The day before exhibits open, Tuesd
- Page 65 and 66: Screen Co., Kramer Electronics/Sier
- Page 67 and 68: THIS MONTH ONMISS THESE PASTPROGRAM
- Page 69 and 70: Sell yourladders.LexisNexismanagers
- Page 71 and 72: General Manager of Nortel’s Globa
- Page 73: You Can Have FaithIn Our Market Res
- Page 77 and 78: tinues to set the industry standard
- Page 80 and 81: ity, the technology consultant to t
- Page 82 and 83: When in use, the system consists of
- Page 84 and 85: NSCA Names Business Awards WinnersN
- Page 86 and 87: COMPILED BY DAN FERRISIPartsExpress
- Page 88 and 89: Crestron’s IPAC(IntegratedProfess
- Page 90 and 91: Sennheiser's SR 2020-D-US-FR Assist
- Page 92 and 93: AN ADVERTISING SUPPLEMENT TO SOUND
- Page 94 and 95: Sign age(Continued from 20)Technolo
- Page 96 and 97: AD INDEXCompany Page #Astatic......
- Page 98 and 99: Schools & CollegesBy Dan Ferrisi“
- Page 100: The Only Solution for the Digital A