11.07.2015 Views

SANS 3000-1:2009 - Railway Safety Regulator

SANS 3000-1:2009 - Railway Safety Regulator

SANS 3000-1:2009 - Railway Safety Regulator

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>SANS</strong> <strong>3000</strong>-1:<strong>2009</strong>Edition 2d) adverse environmental factors; ande) occurrence experience.14.4.2.2 Inspection in response to defined events and occurrences (see 14.4.1.2) shall beadditional to scheduled inspections.14.4.3 Inspection and test recordsOperators shall establish, develop or adopt, implement and maintain inspection and test recordsthat provide evidence of the condition of all elements critical to railway safety. The records shall beestablished and maintained in accordance with the requirements of 5.8.14.4.4 Inspection and test status14.4.4.1 The inspection and test status of any item of track or other infrastructure, rolling stock orequipment shall be identified by the use of suitable means that will indicate compliance or noncomplianceof the item with regard to inspections and tests performed. The identification ofinspection and test status shall be maintained, as necessary, throughout the life cycle of the item toensure that only items that have passed the required inspections and tests are allowed to be inservice.14.4.4.2 Where an item of infrastructure, rolling stock or equipment does not comply but remains inservice temporarily, procedures shall be in place to ensure safe railway operations. (For example,the imposition of temporary speed restrictions over substandard track, or speed or other limitationsplaced on rolling stock involved in an occurrence.)14.5 Method of assessmentOperators shall establish, develop or adopt, implement and maintain standards and procedures forassessing the condition of all safety-related engineering and operational systems and theirdeterioration as determined by inspection and testing. Operators shall define the response intervalbetween inspection and assessment such that both the safe operation of trains and public safetyare not compromised, and the safety standards are not infringed.14.6 Corrective action14.6.1 Operators shall establish, develop or adopt, implement and maintain standards andprocedures for taking corrective action when the assessed safety condition of any element of thesystema) can cause the operators’ safety standards to be infringed, orb) has reached prescribed intervention levels, orc) can cause acceptable levels of risk being exceeded.14.6.2 All corrective actions shall be subjected to re-inspection and reassessment in accordancewith 14.4 and 14.5.38

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!