11.07.2015 Views

SANS 3000-1:2009 - Railway Safety Regulator

SANS 3000-1:2009 - Railway Safety Regulator

SANS 3000-1:2009 - Railway Safety Regulator

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>SANS</strong> <strong>3000</strong>-1:<strong>2009</strong>Edition 2d) the geographic layout of the surrounding area;e) the date and time of the occurrence;f) the time when the occurrence was reported;g) a time comparison;h) a description of the weather and visibility;i) a list of all injuries;j) a list of damage to property, including other assets and the environment;k) the train type(s) and the number(s) of the rolling stock and the shunting operation;l) the number(s) and type(s) of the locomotive;m) the composition and load of the train;n) the origin and destination of the train;o) the names of personnel involved in the occurrence and location where they are stationed;p) the hours on duty of personnel involved;q) a list of any tests done for substance abuse;r) the method of working of the train and of the train control system;s) the condition of the rolling stock and infrastructure;t) a statement of relevant documentation or token (or both) withdrawn;u) a list of the names of witnesses;v) witness statements and evidence;w) sketches, photographs, pictures (these would normally be given in an annex);x) particulars of the clearing operation; andy) any other known factual information.C.3.4 AnalysisThe following should be stated in the analysis:a) the nature of the cause (immediate or basic):1) technical;2) operational;3) human; or46

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!