<strong>Appendix</strong> LNSS Characterization ReportSeptember 22, 2005Revision 0Page 1 of 42<strong>Appendix</strong> L<strong>Field</strong> <strong>Data</strong> <strong>Sheets</strong> <strong>and</strong> <strong>Results</strong>


<strong>Field</strong> <strong>Data</strong> <strong>Sheets</strong> <strong>and</strong> <strong>Results</strong>for Radiation Areas


Survey Conducted on 4-15 April 2005Survey Conducted by: ERMAsbestos Survey <strong>Field</strong> <strong>Data</strong> Sheet-Reactor ContainmentNS-SavannahFort Eustis, VAFriable?Sample ID Material DescriptionLocation Condition Yes NoNSS-RC-TSI-1A, -1B, -1CStraight run pipe insulation associatedwith electrical cordSecondary Containment- Deck A Level Good xNSS-RC-TSI-2A, -2B, -2CStraight run pipe insulation associatedwith UV tanks (12" diameter)Secondary Containment Good xNSS-RC-TSI-3A, -3B, -3CElbow pipe insulation associated withUV tanks (12" diameter)Secondary Containment Good xNSS-RC-TSI-4A, -4B, -4CStraight run pipe insulation associatedwith 4" diameter pipesPrimary <strong>and</strong> Secondary Containment Good xNSS-RC-TSI-5A, -5B, -5CElbow pipe insulation associated with4" diameter pipesPrimary <strong>and</strong> Secondary Containment Good xNSS-RC-TSI-6A, -6B, -6CStraight run pipe insulation associatedwith 2" diameter pipesPrimary <strong>and</strong> Secondary Containment Good xNSS-RC-TSI-7A, -7B, -7CElbow pipe insulation associated with2" diameter pipesPrimary <strong>and</strong> Secondary Containment Good xNS-SAVANNAH/ 0028178


Asbestos Survey <strong>Field</strong> <strong>Data</strong> Sheet-Reactor ContainmentNS-SavannahFort Eustis, VASurvey Conducted on 4-15 April 2005Survey Conducted by: ERMFriable?Sample ID Material DescriptionLocation Condition Yes NoNSS-RC-TSI-8A, -8B, -8CStraight run pipe insulation associatedwith 10" diameter pipesPrimary <strong>and</strong> Secondary Containment Good xNSS-RC-TSI-9A, -9B, -9CElbow pipe insulation associated with10" diameter pipesPrimary <strong>and</strong> Secondary Containment Good xNSS-RC-TSI-10A, -10B, -10CStraight run pipe insulation associatedwith waste tanksLower Secondary Containment Good xNSS-RC-TSI-11A, -11B, -11CElbow pipe insulation associated withwaste tanksLower Secondary Containment Good xNSS-RC-TSI-12A, -12B, -12CNSS-RC-TSI-13A, -13B, -13CInsulation associated with thesecondary heat exchanger (purple incolor)Straight run pipe insulation associatedwith pressurizer system (red in color)Primary Containment Good xPrimary Containment Good xNSS-RC-TSI-14A, -14B, -14CElbows insulation associated withpressurizer system (red in color)Primary Containment Good xNS-SAVANNAH/ 0028178


Asbestos Survey <strong>Field</strong> <strong>Data</strong> Sheet-Reactor ContainmentNS-SavannahFort Eustis, VASurvey Conducted on 4-15 April 2005Survey Conducted by: ERMFriable?Sample ID Material DescriptionLocation Condition Yes NoNS-RC-TSI-15A, -15B, -15CNSS-RC-TSI-16A, -16B, -16CNSS-RC-TSI-17A, -17B, -17CNSS-RC-TSI-18A, -18B, -18CNSS-RC-TSI-19A, -19B, -19CNSS-RC-TSI-20A, -20B, -20CInsulation associated withpressurizer system tank (red incolor)Straight run pipe insulationassociated with secondary heatexchanger (purple in color)Elbow insulation associated withsecondary heat exchanger (purple incolor)Straight run pipe insulationassociated with primary heatexchanger system ( 24" in diameter<strong>and</strong> red in color)Elbow pipe insulation associatedwith primary heat exchanger system (24" in diameter <strong>and</strong> red in color)Canvas wrap associated withfiberglass insulationPrimary Containment Good xPrimary Containment Good xPrimary Containment Good xPrimary Containment Good xPrimary Containment Good xPrimary <strong>and</strong> Secondary Containment Good xNote: All pipes are recorded as total diameter of the pipe <strong>and</strong> the associated insulation.NS-SAVANNAH/ 0028178


Asbestos Survey Sampling <strong>Data</strong> (4-15 April 2005)NS-Savannah – Fort Eustis, VirginiaERM Work Order No. 0028178Sample # Material Description Sample Location(s) (1) Friable?(2)Condition (3)PLM <strong>Results</strong> (4)(AsbestosPercent/Type)NSS-RC-TSI-8A, -8B, -8CStraight run pipe insulationassociated with 10" diameter pipesPrimary <strong>and</strong> Secondary Containment Yes Good 20%-Chrysotile <strong>and</strong>AmositeNSS-RC-TSI-9A, -9B, -9CElbow pipe insulation associatedwith 10" diameter pipesPrimary <strong>and</strong> Secondary ContainmentYes Good 30%-Chrysotile <strong>and</strong>AmositeNSS-RC-TSI-10A, -10B, -10CStraight run pipe insulationassociated with waste tanksLower Secondary Containment Yes Good 25%-Chrysotile <strong>and</strong>AmositeNSS-RC-TSI-11A, -11B, -11CElbow pipe insulation associatedwith waste tanksLower Secondary Containment Yes Good 45%-Chrysotile <strong>and</strong>AmositeNSS-RC-TSI-12A, -12B, -12CInsulation associated with thesecondary heat exchanger (purple incolor)Primary Containment Yes Good25%-Chrysotile <strong>and</strong>AmositeNSS-RC-TSI-13A, -13B, -13CStraight run pipe insulationassociated with pressurizer system(red in color)Primary Containment Yes Good 40%-AmositeNSS-RC-TSI-14A, -14B, -14CElbows insulation associated withpressurizer system (red in color)Primary Containment Yes Good15%-Chrysotile <strong>and</strong>AmositePAGE 2 OF 4


Asbestos Survey Sampling <strong>Data</strong> (4-15 April 2005)NS-Savannah – Fort Eustis, VirginiaERM Work Order No. 0028178Sample # Material Description Sample Location(s) (1) Friable?(2)Condition (3)PLM <strong>Results</strong> (4)(AsbestosPercent/Type)NSS-RC-TSI-15A, -15B, -15CInsulation associated withpressurizer system tank (red incolor)Primary Containment Yes Good20%-Chrysotile <strong>and</strong>AmositeNSS-RC-TSI-16A, -16B, -16CStraight run pipe insulationassociated with secondary heatexchanger (purple in color)Primary Containment Yes Good 25%-AmositeNSS-RC-TSI-17A, -17B, -17CElbow insulation associated withsecondary heat exchanger (purple incolor)Primary Containment Yes Good 15%-AmositeNSS-RC-TSI-18A, -18B, -18CStraight run pipe insulationassociated with primary heatexchanger system ( 24" in diameter<strong>and</strong> red in color)Primary Containment Yes Good 40%-AmositeNSS-RC-TSI-19A, -19B, -19CElbow pipe insulation associatedwith primary heat exchanger system( 24" in diameter <strong>and</strong> red in color)Primary Containment Yes Good5%-Chrysotile <strong>and</strong>AmositeNSS-RC-TSI-20A, -20B, -20CCanvas wrap associated withfiberglass insulationPrimary <strong>and</strong> Secondary ContainmentYes Good 30%-ChrysotileInformation presented is based upon observations made during an asbestos survey conducted by ERM on 4-15 April 2005.“NAD” – No Asbestos Detected(1) Only the general locations from which samples were obtained are included in this table. Material may also be located in other areas of the buildings (see Tables 1 <strong>and</strong> 2 ofthe survey report). Where possible, floor tile <strong>and</strong> drywall samples were taken in areas of pre-existing localized damage.(2) A non-friable material can become friable if the condition of the material has significantly diminished or if its structural integrity has been compromised.PAGE 3 OF 4


Asbestos Survey Sampling <strong>Data</strong> (4-15 April 2005)NS-Savannah – Fort Eustis, VirginiaERM Work Order No. 0028178(3) The condition of a material reported herein is based upon observations made by an accredited inspector. The condition of floor tile mastics are assumed equal to that of thetile to which they are adhered.(4) A material that contains greater than one percent asbestos is classified, <strong>and</strong> therefore must be managed as an ACM.Note: All pipes are recorded as total diameter of the pipe <strong>and</strong> the associated insulation.PAGE 4 OF 4


Table 1 Materials Classified as Non-ACMs Based on Sampling <strong>Results</strong> (4-15 April 2005)NS-Savannah – Fort Eustis, VirginiaSample # Material Description Material LocationNSS-RC-TSI-1A, -1B, -1CStraight run pipe insulation associatedwith electrical cordSecondary Containment- Deck A LevelInformation presented is based upon observations made during an asbestos survey conducted by ERM on 4-15 April 2005.Materials that contain one percent or less asbestos are classified as non-asbestos-containing materials (non-ACMs).Note: All pipes are recorded as total diameter of the pipe <strong>and</strong> the associated insulation.T–1 (PAGE 1 OF 1) NS-SAVANNAH/0028178


Table 2 Materials Classified as ACMs Based on Sampling <strong>Results</strong> (4-15 April 2005)NS-Savannah – Fort Eustis, VirginiaSample # Material Description (1) Material Locations % Asbestos (2)(Type)Estimated Quantity (3)NSS-RC-TSI-2A, -2B, -2CStraight run pipe insulationassociated with UV tanks(12" diameter)Secondary Containment25% -Chrysotile<strong>and</strong> Amosite100 linear feetNSS-RC-TSI-3A, -3B, -3CElbow pipe insulationassociated with UV tanks(12" diameter)Secondary Containment 35%-Amosite 20 elbowsNSS-RC-TSI-4A, -4B, -4CStraight run pipe insulationassociated with 4" diameterpipesPrimary <strong>and</strong> Secondary Containment20%-Chrysotile<strong>and</strong> Amosite500 linear feetNSS-RC-TSI-5A, -5B, -5CElbow pipe insulationassociated with 4" diameterpipesPrimary <strong>and</strong> Secondary Containment35%-Chrysotile<strong>and</strong> Amosite50 elbowsNSS-RC-TSI-6A, -6B, -6CStraight run pipe insulationassociated with 2" diameterpipesPrimary <strong>and</strong> Secondary Containment20%-Chrysotile<strong>and</strong> Amosite500 linear feetNSS-RC-TSI-7A, -7B, -7CElbow pipe insulationassociated with 2" diameterpipesPrimary <strong>and</strong> Secondary Containment25%-Chrysotile<strong>and</strong> Amosite20 elbowsNSS-RC-TSI-8A, -8B, -8CStraight run pipe insulationassociated with 10" diameterpipesPrimary <strong>and</strong> Secondary Containment20%-Chrysotile<strong>and</strong> Amosite800 linear feetNSS-RC-TSI-9A, -9B, -9CElbow pipe insulationassociated with 10"diameter pipesPrimary <strong>and</strong> Secondary Containment30%-Chrysotile<strong>and</strong> Amosite70 elbows


Table 2 Materials Classified as ACMs Based on Sampling <strong>Results</strong> (4-15 April 2005)NS-Savannah – Fort Eustis, Virginia (continued)Sample # Material Description (1) Material Locations % Asbestos (2)(Type)Estimated Quantity (3)NSS-RC-TSI-10A, -10B, -10CStraight run pipe insulationassociated with wastetanksLower Secondary Containment25%-Chrysotile<strong>and</strong> Amosite200 linear feetNSS-RC-TSI-11A, -11B, -11CElbow pipe insulationassociated with wastetanksLower Secondary Containment45%-Chrysotile<strong>and</strong> Amosite40 elbowsNSS-RC-TSI-12A, -12B, -12CInsulation associated withthe secondary heatexchanger (purple in color)Primary Containment25%-Chrysotile<strong>and</strong> Amosite1600 square feetNSS-RC-TSI-13A, -13B, -13CStraight run pipe insulationassociated with pressurizersystem (red in color)Primary Containment 40%-Amosite 150 linear feetNSS-RC-TSI-14A, -14B, -14CElbows insulationassociated with pressurizersystem (red in color)Primary Containment15%-Chrysotile<strong>and</strong> Amosite10 elbowsNSS-RC-TSI-15A, -15B, -15CInsulation associated withpressurizer system tank(red in color)Primary Containment20%-Chrysotile<strong>and</strong> Amosite1500 square feetNSS-RC-TSI-16A, -16B, -16CStraight run pipe insulationassociated with secondaryheat exchanger (purple incolor)Primary Containment 25%-Amosite 1,000 linear feetNSS-RC-TSI-17A, 17B, -17CElbow insulationassociated with secondaryheat exchanger (purple inPrimary Containment 15%-Amosite 60 elbowsT–1 (PAGE 2 OF 3) NS-SAVANNAH/0028178


Table 2 Materials Classified as ACMs Based on Sampling <strong>Results</strong> (4-15 April 2005)NS-Savannah – Fort Eustis, Virginia (continued)Sample # Material Description (1) Material Locations % Asbestos (2)(Type)Estimated Quantity (3)color)NSS-RC-TSI-18A, -18B, -18CStraight run pipe insulationassociated with primaryheat exchanger system ( 24"in diameter <strong>and</strong> red incolor)Primary Containment 40%-Amosite 500 linear feetNSS-RC-TSI-19A, -19B, -19CElbow pipe insulationassociated with primaryheat exchanger system ( 24"in diameter <strong>and</strong> red incolor)Primary Containment5%-Chrysotile <strong>and</strong>Amosite60 elbowsNSS-RC-TSI-20A, -20B, -20CCanvas wrap associatedwith fiberglass insulationPrimary <strong>and</strong> Secondary Containment 30%-Chrysotile 2,000 linear feetMaterials that contain greater than one percent asbestos are classified as asbestos-containing materials (ACMs).Information presented is based upon observations made during a building survey conducted by ERM from 4-15 April 2005.(1) The friability <strong>and</strong> condition of ACMs are reported as observed on 4-15 April 2005. A non-friable ACM can become friable if the condition of the material hassignificantly diminished or if its structural integrity has been compromised.(2) Asbestos–content determined by Polarized-light Microscopy (PLM) by AMA Analytical Services, Inc. of Lanham, Maryl<strong>and</strong>.(3) Quantities are presented as plus or minus 50 percent.Note: All pipes are recorded as total diameter of the pipe <strong>and</strong> the associated insulation.T–1 (PAGE 3 OF 3) NS-SAVANNAH/0028178


<strong>Field</strong> <strong>Data</strong> <strong>Sheets</strong> for Non-Radiation Areas


Survey Conducted on 4-15 April 2005Survey Conducted by: ERMAsbestos Survey <strong>Field</strong> <strong>Data</strong> Sheet-Navigation Bridge DeckNS-SavannahFort Eustis, VAFriable?Sample ID Material DescriptionLocation Condition Yes NoNSS-NBD-FT-1A, -1B, -1CGreen ,9"x9" floor tile with white lines<strong>and</strong> associated masticsThroughout Navigation Bridge Deck Fair xNSS-NBD-MM-2A, -2B, -2C White wall board with pinhole pattern Navigation Bridge Deck-Gyro Radar Room Good xNSS-NBD-TSI-3A, -3B, -3CStraight run pipe insulation associatedwith piping above ceilingsNavigation Bridge Deck above ceiling Good xNSS-NBD-TSI-4A, -4B, -4CElbow pipe insulation associated withpiping above ceilingNavigation Bridge Deck above ceiling Good xNSS-NBD-MM-5A, -5B, -5CWhite, drywall associated with walls(1' thickness)Navigation Bridge Deck Staterooms Good xNSS-NBD-MM-6A, -6B, -6C White, drywall associated with ceiling Navigation Bridge Deck Staterooms Good xNSS-NBD-MM-7A, -7B, -7CBrown mastic associated withbaseboard moldingThroughout Navigation Bridge Deck Good xNS-SAVANNAH/ 0028178


Asbestos Survey <strong>Field</strong> <strong>Data</strong> Sheet-Navigation Bridge DeckNS-SavannahFort Eustis, VASurvey Conducted on 4-15 April 2005Survey Conducted by: ERMFriable?Sample ID Material DescriptionLocation Condition Yes NoNSS-NBD-MM-8A, -8B, -8C White sub-floor (baseboard) Throughout Navigation Bridge Deck Good xNSS-NBD-TSI-9A, -9B, -9CStraight run pipe insulation associatedwith generatorNavigation Bridge Deck-Generator Room Good xNSS-NBD-TSI-10A, -10B, -10CElbow pipe insulation associated withgeneratorNavigation Bridge Deck-Generator Room Good xDue to time limitations, physical samples were not taken of this deck. The materials that were observed are similar to materials thatare located on other decks of the ship. The table identifies samples that ERM would have sampled had time permitted.Note: All pipes are recorded as total diameter of the pipe <strong>and</strong> the associated insulation.NS-SAVANNAH/ 0028178


Survey Conducted on 4-15 April 2005Survey Conducted by: ERMAsbestos Survey <strong>Field</strong> <strong>Data</strong> Sheet-Boat DeckNS-SavannahFort Eustis, VAFriable?Sample ID Material DescriptionLocation Condition Yes NoNSS-BoatDeck-FT-1A, -1B, -1CBlack 18"x18" floor tile with whitespecks <strong>and</strong> associated masticBoat Deck stairwell Good xNSS-BoatDeck-MM-2A, -2B, -2CWhite, drywall associated with thewall (1' thickness)Boat Deck Cabins Good xNSS-BoatDeck-MM-3A, -3B, -3CWhite, drywall associated with ceiling(1/2" thickness)Boat Deck Staterooms Good xNSS-BoatDeck-MM-4A, -4B, -4C White sub-floor (baseboard) Throughout Boat Deck Good xNSS-BoatDeck-FT-5A, -5B, -5CGreen, 9x9 floor tile with white lines<strong>and</strong> associated masticThroughout Boat Deck Poor xNSS-BoatDeck-MM-6A, -6B, -6CBrown mastic associated withbaseboard moldingThroughout Boat Deck Good xNSS-BoatDeck-TSI-7A, -7B, -7CStraight run pipe insulation aboveceilingBoat Deck above ceiling Good xNS-SAVANNAH/ 0028178


Asbestos Survey <strong>Field</strong> <strong>Data</strong> Sheet-Boat DeckNS-SavannahFort Eustis, VASurvey Conducted on 4-15 April 2005Survey Conducted by: ERMFriable?Sample ID Material DescriptionLocation Condition Yes NoNSS-BoatDeck-TSI-8A, -8B, -8C Elbow pipe insulation Boat Deck above ceiling Good xNote: All pipes are recorded as total diameter of the pipe <strong>and</strong> the associated insulation.NS-SAVANNAH/ 0028178


Survey Conducted on 4-15 April 2005Survey Conducted by: ERMAsbestos Survey <strong>Field</strong> <strong>Data</strong> Sheet-Promenade DeckNS-SavannahFort Eustis, VAFriable?Sample ID Material DescriptionLocation Condition Yes NoNSS-PromDeck-FT-1A, -1B, -1CDark green, 18" x18" floor tile withwhite lines <strong>and</strong> associated masticsPromenade Deck-Ver<strong>and</strong>a Good xNSS-PromDeck-FT-2A, -2B, -2CWhite, 18"x18" floor tile with whitelines <strong>and</strong> associated masticsPromenade Deck-Ver<strong>and</strong>a Good xNSS-PromDeck-MM-3A, -3B, -3C Black sub-floor (baseboard) Promenade Deck-Throughout floor Good xNSS-PromDeck-MM-4A, -4B, -4CWhite, 4'x4' ceiling panels withpinholesPromenade Deck-Ver<strong>and</strong>a <strong>and</strong> Main Lounge Good xNSS-PromDeck-MM-5A, -5B, -5CWhite drywall (1/2" thickness)associated with wallsPromenade Deck-Ver<strong>and</strong>a Good xNSS-PromDeck-MM-6A, -6B, -6CNSS-PromDeck-MM-7A, -7B, -7CWhite drywall (1" thickness)associated with ceilingsBrown mastic associated withbaseboard moldingPromenade Deck-Ver<strong>and</strong>a Good xPromenade Deck-Ver<strong>and</strong>a <strong>and</strong> Main Lounge Good xNote: All pipes are recorded as total diameter of the pipe <strong>and</strong> the associated insulation.NS SAVANNAH/ 0028178


Survey Conducted on 4-15 April 2005Survey Conducted by: ERMAsbestos Survey <strong>Field</strong> <strong>Data</strong> Sheet-Deck ANS-SavannahFort Eustis, VAFriable?Sample ID Material DescriptionLocation Condition Yes NoNSSDeckA-FT-1A, -1B, -1CGreen, 9"x9" floor tile with white lines<strong>and</strong> associated masticDeck A- Throughout infirmary Good xNSSDeckA-TSI-2A, -2B, -2C Straight run pipe insulation Deck A- Piping located above ceiling Good xNSSDeckA-TSI-3A, -3B, -3C Elbow pipe insulation Deck A- Piping located above ceiling Good xNSSDeckA-FT-4A, -4B, -4CBrown, 9"x9" floor tile with whitespecks <strong>and</strong> associated masticDeck A-Throughout hallways adjacent tostateroomsGoodxNSSDeckA-FT-5A, -5B, -5CBlack, 9"x9" floor tile with whitespecks <strong>and</strong> associated masticDeck A-Throughout hallways adjacent tostateroomsGoodxNSSDeckA-FT-6A, -6B, -6CLight brown, 9"x9" floor tile withwhite specks <strong>and</strong> associated masticDeck A-Throughout hallways adjacent tostateroomsGoodxNSSDeckA-FT-7A, -7B, -7CTan, "9x9" floor tile with white brownspecks <strong>and</strong> associated masticDeck A-Throughout hallways adjacent tostateroomsGoodxNS-SAVANNAH/ 0028178


Asbestos Survey <strong>Field</strong> <strong>Data</strong> Sheet-Deck ANS-SavannahFort Eustis, VASurvey Conducted on 4-15 April 2005Survey Conducted by: ERMFriable?Sample ID Material DescriptionLocation Condition Yes NoNSSDeckA-MM-8A, -8B, -8CWhite drywall (1/2" thickness)associated with ceilingsDeck A Good xNSSDeckA-MM-9A, -9B, -9CWhite drywall (1" thickness)associated with wallsDeck A Good xNSSDeckA-FT-10A, -10B, -10CWhite, 9"x9" floor tile <strong>and</strong> associatedmasticDeck A- Main Lobby Good xNSSDeckA-FT-11A, -11B, -11CGray, 18"x18" floor tile <strong>and</strong> associatedmasticDeck A –Main Lobby Good xNSSDeckA-FT-12A, -12B, -12CBlack, 9"x9" floor tile <strong>and</strong> associatedmasticDeck A- Main Lobby Good xNSSDeckA-CT-13A, -13B, -13CWhite, 2'x3' ceiling panel withpinholesDeck A- Main Lobby Good xNSSDeckA-MM14A, -14B, -14C Black sub-floor (baseboard) Deck A – Main Lobby <strong>and</strong> forward areas Good xNS-SAVANNAH/ 0028178


Asbestos Survey <strong>Field</strong> <strong>Data</strong> Sheet-Deck ANS-SavannahFort Eustis, VASurvey Conducted on 4-15 April 2005Survey Conducted by: ERMFriable?Sample ID Material DescriptionLocation Condition Yes NoNSDeckA-FT-15A, -15B, -15CTan, 9"x9" floor tile <strong>and</strong> associatedmasticDeck A- Lab Assistant Office Poor xNSSDeckA-FT-16A, -16B, -16COrange, 9"x9" floor tile <strong>and</strong> associatedmasticDeck A- Barber Shop Good xNSSDeckA-FT-17A, -17B, -17CBrown, 9" x9" floor tile with black <strong>and</strong>white specks <strong>and</strong> associated masticDeck A- Port <strong>and</strong> starboard side stairwells Fair xNSSDeckA-FT-18A, -18B, -18CTan, 9" x9" floor tile with brownspecks <strong>and</strong> associated masticDeck A- Port <strong>and</strong> starboard side stairwells Fair xNSSDeckA-FT-19A, -19B, -19CTan, 9" x9" floor tile with brownspecks <strong>and</strong> associated masticDeck A- Staterooms rear of Main Lobby <strong>and</strong>Pursers OfficeFairxNSSDeckA-MM-20A, -20B, -20CBrown mastic associated withbaseboard moldingDeck A Good xNSSDeckA-MM-21A, -21B, -21C White sub-floor (baseboard) Deck A- Area rear of Main Lobby Good xNSSDeckA-FT-22A, -22B, -22CRed, 9"x9" floor tile with white lines<strong>and</strong> associated masticDeck A- Forward port side stairwell Good xNote: All pipes are recorded as total diameter of the pipe <strong>and</strong> the associated insulation.NS-SAVANNAH/ 0028178


Survey Conducted on 4-15 April 2005Survey Conducted by: ERMAsbestos Survey <strong>Field</strong> <strong>Data</strong> Sheet-Deck BNS-SavannahFort Eustis, VAFriable?Sample ID Material DescriptionLocation Condition Yes NoNSS-B Deck-FT-1A, -1B, -1C Blue, 9"x9" floor tile with white lines Deck B- Dining Room Fair xNSS-B Deck-Mastic-2A, -2B, -2CMastic associated with blue 9"x9"floor tile with white linesDeck B-Dining Room Fair xNSS-B Deck-FT-3A, -3B, -3C White, 18" x18" floor tile Deck B-Dining Room Fair xNSS-B Deck-Mastic-4A, -4B, -4CMastic associated with 18" x18" floortileDeck B-Dining Room Fair xNSS-B Deck-Mastic-5A, -5B, -5CBrown mastic associated withbaseboard moldingDeck B-Dining Room Fair xNSS-B Deck- FT-6A, -6B, -6CLight green, 9" x9" floor tile withwhite specksDeck B- Stateroom hallway rear of CargoLoading PassageFairxNSS-B Deck-Mastic-7A, -7B, -7CMastic associated with light green9x9 floor tile with white specksDeck B- Stateroom hallway rear of CargoLoading PassageFairxNS-SAVANNAH/ 0028178


Asbestos Survey <strong>Field</strong> <strong>Data</strong> Sheet-Deck BNS-SavannahFort Eustis, VASurvey Conducted on 4-15 April 2005Survey Conducted by: ERMFriable?Sample ID Material DescriptionLocation Condition Yes NoNSS-B Deck-MM-8A, -8B, -8CBrown mastic associated with stairtreadsDeck-B Dining Room Good xNSS-B Deck-Fiberboard-9A, -9B, -9CWhite fiberboard paddingbeneath floor tileDeck B- Area rear of Cargo Loading Passage Fair xNSS-B Deck-FT-10A, -10B, -10CDark green, 9" x9" floor tile withwhite linesDeck B- Area rear of Cargo Loading Passage Fair xNSS-B Deck-Mastic-11A, -11B, -11C Mastic associated with 9" x9"floor tile with white linesDeck B- Area rear of Cargo Loading Passage Fair xNSS-B Deck-FT-12A, -12B, -12C Gray, 9"x9" floor tiles with specks Deck B- Throughout area forward of CargoLoading PassageFairxNSS-B Deck-Mastic-13A, -13B, -13C Mastic associated with gray 9" x9"floor tile with specksDeck B- Throughout area forward of CargoLoading PassageFairxNSS-B Deck-Subfloor-14A, -14B, -14C Gray sub-floor (baseboard) Deck B- Forward of Cargo Loading Passage Fair xNS-SAVANNAH/ 0028178


Asbestos Survey <strong>Field</strong> <strong>Data</strong> Sheet-Deck BNS-SavannahFort Eustis, VASurvey Conducted on 4-15 April 2005Survey Conducted by: ERMFriable?Sample ID Material DescriptionLocation Condition Yes NoNSS-B Deck-MM-15A, -15B, -15CWhite drywall (1/2" thickness)associated with ceilingDeck B-Throughout staterooms <strong>and</strong> hallways Fair xNSS-B Deck-FT-16A, -16B, -16CTan, 9" x9" floor tile with brownlines <strong>and</strong> associated masticDeck B- Starboard side stateroom forward ofthe Cargo Loading PassageFairxNSS-B Deck-MM-17A, -17B, -17CWhite, 18"x18" ceiling panels withpinholesDeck B– Dining room <strong>and</strong> office rear of CargoLoading PassageGoodxNSS-B Deck-TSI-18A, -18B, -18C Straight run pipe insulation Deck B– Piping that is located above ceiling Good xNSS-B Deck-TSI-19A, -19B, -19C Elbow pipe insulation Deck B– Piping that Is located above ceiling Good xNSS-B Deck-MM-20A, -20B, -20CWhite drywall (1" thickness)associated with wallsDeck B – Throughout staterooms <strong>and</strong>hallwaysGoodxNote: All pipes are recorded as total diameter of the pipe <strong>and</strong> the associated insulation.NS-SAVANNAH/ 0028178


Survey Conducted on 4-15 April 2005Survey Conducted by: ERMAsbestos Survey <strong>Field</strong> <strong>Data</strong> Sheet-Deck CNS-SavannahFort Eustis, VAFriable?Sample ID Material DescriptionLocation Condition Yes NoNSSDeckC-FT-1A, -1B, -1CTan, 9"x9" floor tiles with white lines<strong>and</strong> associated masticsDeck C-Staterooms Good xNSSDeckC-MM-2A, -2B, -2CWhite drywall (1/2" thickness)associated with state room ceilingDeck C-Staterooms Good xNSSDeckC-MM-3A, -3B, -3CWhite drywall (1" thickness)associated with state room wallsDeck C-Staterooms <strong>and</strong> Hallways Good xNSSDeckC-TSI-4A, -4B, -4CStraight run pipe insulation associatedwith pipes above ceilingDeck C Good xNSSDeckC-TSI-5A, -5B, -5CElbow pipe insulation associated withpipes above ceilingDeck C Good xNSSDeckC-FT-6A, -6B, -6CBrown, 9" x9" floor tile with blackspecks <strong>and</strong> associated masticDeck C- Hallways Good xNSSDeckC-FT-7A, -7B, -7CTan, 9" x9" floor tile with black <strong>and</strong>white specks <strong>and</strong> associated masticDeck C- Hallways Good xNS-SAVANNAH/ 0028178


Asbestos Survey <strong>Field</strong> <strong>Data</strong> Sheet-Deck CNSS-SavannahFort Eustis, VASurvey Conducted on 4-15 April 2005Survey Conducted by: ERMFriable?Sample ID Material DescriptionLocation Condition Yes NoNSSDeckC-TSI-8A, -8B, -8CStraight run pipe insulation associatedwith pipingDeck C – Carpenters workshop Good xNSSDeckC-TSI-9A, -9B, -9CElbow pipe insulation associated withpipingDeck C- Carpenters workshop Good xNote: All pipes are recorded as total diameter of the pipe <strong>and</strong> the associated insulation.NS-SAVANNAH/ 0028178


Survey Conducted on 4-15 April 2005Survey Conducted by: ERMAsbestos Survey <strong>Field</strong> <strong>Data</strong> Sheet-14 Flat <strong>and</strong> Deck DNS-SavannahFort Eustis, VAFriable?Sample ID Material DescriptionLocation Condition Yes NoNSS14Flat-TSI-1A, -1B, -1CStraight run pipe insulation associatedwith heating systemDeck 14 Flat-Engine Room Good xNSS14Flat-TSI-2A, -2B, -2CElbow pipe insulation associated withheating system drainDeck 14 Flat-Engine Room Good xNSS14Flat-TSI-3A, -3B, -3CStraight run pipe insulation associatedwith heating system drainDeck 14 Flat-Engine Room Good xNSS14Flat-TSI-4A, -4B, -4CElbow pipe insulation associated withheating system drainDeck 14 Flat-Engine Room Good xNSS14Flat-TSI-5A, -5B, -5CStraight run pipe insulation associatedwith auxiliary exhaustDeck 14 Flat-Engine Room Good xNSS14Flat-TSI-6A, -6B, -6CElbow pipe insulation associated withauxiliary exhaustDeck 14 Flat-Engine Room Good xNSS14Flat-TSI-7A, -7B, -7CStraight run pipe insulation associatedwith fire station 37 (4" diameter)Deck 14 Flat-Engine Room Good xNS-SAVANNAH/ 0028178


Asbestos Survey <strong>Field</strong> <strong>Data</strong> Sheet-14 Flat <strong>and</strong> Deck DNS-SavannahFort Eustis, VASurvey Conducted on 4-15 April 2005Survey Conducted by: ERMFriable?Sample ID Material DescriptionLocation Condition Yes NoNSS14Flat-TSI-8A, -8B, -8CElbow pipe insulation associated withfire station 37 (4" diameter)Deck 14 Flat-Engine Room Good xNSS14Flat-TSI-9A, -9B, -9CNSS14Flat-TSI-10A, -10B, -10CNSS14Flat-TSI-11A, -11B, -11CNSS14Flat-TSI-12A, -12B, -12CInsulation (body) associated withHP/LP crossover system (60"diameter)Insulation (body) associated withHP/LP crossover system (36"diameter)Elbow pipe insulation associated withHP/LP crossover system (36"diameter)Elbow pipe insulation associated withsteam dump pipe (24" diameter)Deck 14 Flat-Engine Room Good xDeck 14 Flat-Engine Room Good xDeck 14 Flat-Engine Room Good xDeck 14 Flat-Engine Room Good xNSS14Flat-TSI-13A, -13B, -13CStraight run pipe insulation associatedwith steam dump pipe (24" diameter)Deck 14 Flat-Engine Room Good xNSS14Flat-TSI-14A, -14B, -14C Straight run pipe insulation (4"diameter)Deck 14 Flat-Shaft Alley Good xNS-SAVANNAH/ 0028178


Asbestos Survey <strong>Field</strong> <strong>Data</strong> Sheet-14 Flat <strong>and</strong> Deck DNS-SavannahFort Eustis, VASurvey Conducted on 4-15 April 2005Survey Conducted by: ERMFriable?Sample ID Material DescriptionLocation Condition Yes NoNSS14Flat-TSI-15A, -15B, -15C Elbow pipe insulation (4" diameter) Deck 14 Flat-Shaft Alley Good xNSS14Flat-TSI-16A, -16B, -16CStraight run pipe insulation associatedwith main feed pumpDeck 14 Flat-Engine Room Good xNSS14Flat-TSI-17A, -17B, -17CElbow pipe insulation associated withmain feed pumpDeck 14 Flat-Engine Room Good xNSS14Flat-TSI-18A, -18B, -18CInsulation associated with first stagewater heater (body)Deck 14 Flat-Engine Room Good xNSS14Flat-TSI-19A, -19B, -19CStraight run pipe insulation associatedwith solenoid valveDeck 14 Flat-Engine Room Good xNSS14Flat-TSI-20A, -20B, -20CElbow pipe insulation associated withsolenoid valveDeck 14 Flat-Engine Room Good xNSS14Flat-TSI-21A, -21B, -21CStraight run pipe insulation associatedwith shell coil systemDeck 14 Flat-Engine Room Good xNS-SAVANNAH/ 0028178


Asbestos Survey <strong>Field</strong> <strong>Data</strong> Sheet-14 Flat <strong>and</strong> Deck DNS-SavannahFort Eustis, VASurvey Conducted on 4-15 April 2005Survey Conducted by: ERMFriable?Sample ID Material DescriptionLocation Condition Yes NoNSS14Flat-TSI-22A, -22B, -22CElbow pipe insulation associated withshell coil systemDeck 14 Flat-Engine Room Good xNSS14Flat-TSI-23A, -23B, -23CStraight run pipe insulation associatedwith crossover drainDeck 14 Flat-Engine Room Good xNSS14Flat-TSI-24A, -24B, -24CElbow pipe insulation associated withcrossover drainDeck 14 Flat-Engine Room Fair xNSSDeckD-FT-25A, -25B, -25CWhite, 9"x9" floor tile <strong>and</strong> associatedmasticsDeck D-Control Room Good xNSSDeckD-FT-26A, -26B, -26CGreen, 9"x9" floor tile <strong>and</strong> associatedmasticsDeck D-Control Room Good xNSSDeckD-TSI-27A, -27B, -27CStraight run pipe insulation associatedwith cooling system (green)Deck D-Engine Room Good xNSSDeckD-TSI-28A, -28B, -28CElbow pipe insulation associated withcooling system (green)Deck D-Engine Room Good xNS-SAVANNAH/ 0028178


Asbestos Survey <strong>Field</strong> <strong>Data</strong> Sheet-14 Flat <strong>and</strong> Deck DNS-SavannahFort Eustis, VASurvey Conducted on 4-15 April 2005Survey Conducted by: ERMFriable?Sample ID Material DescriptionLocation Condition Yes NoNSSDeckD-TSI-29A, -29B, -29CInsulation associated with coolingsystem tank (green)Deck D-Engine Room Poor xNSSDeckD-TSI-30A, -30B, -30CStraight run pipe insulation associatedwith diesel engine exhaustDeck D-Engine Room Good xNSSDeckD-TSI-31A, -31B, -31CElbow pipe insulation associated withdiesel engine exhaustDeck D-Engine Room Good xNSSDeckD-MM-32A, -32B, -32C Gaskets associated with boiler Deck D-Engine Room Good xNSSDeckD-TSI-33A, -33B, -33CInsulation associated with steamgenerator (pink)Deck D-Engine Room Good xNSSDeckD-TSI-34A, -34B, -34CStraight run pipe insulation associatedwith steam generatorDeck D-Engine Room Good xNSSDeckD-TSI-35A, -35B, -35CElbow pipe insulation associated withsteam generatorDeck D-Engine Room Good xNS-SAVANNAH/ 0028178


Asbestos Survey <strong>Field</strong> <strong>Data</strong> Sheet-14 Flat <strong>and</strong> Deck DNS-SavannahFort Eustis, VASurvey Conducted on 4-15 April 2005Survey Conducted by: ERMFriable?Sample ID Material DescriptionLocation Condition Yes NoNSSDeckD-TSI-36A, -36B, -36CStraight run pipe insulation associatedwith compressorsDeck D-Engine Room Good xNSSDeckD-TSI-37A, -37, -37CElbow pipe insulation associated withcompressorsDeck D-Engine Room Good xNSSDeckD-TSI-38A, -38B, -38CPipe insulation associated with boilerductDeck D-Engine Room Good xNSSDeckD-TSI-39A, -39B, -39CElbow pipe insulation associated withADT pipe system (green)Deck D-Engine Room Good xNSSDeckD-TSI-40A, -40B, -40CStraight run pipe insulation associatedwith ADT pipe system (green)Deck D-Engine Room Poor xNSSDeckD-TSI-41A, -41B, -41CStraight run pipe insulation associatedwith steam valve systemDeck D-Engine Room Fair xNSSDeckD-TSI-42A, -42B, -42CStraight run pipe insulation associatedwith engine (red)Deck D-Engine Room Good xNS-SAVANNAH/ 0028178


Asbestos Survey <strong>Field</strong> <strong>Data</strong> Sheet-14 Flat <strong>and</strong> Deck DNS-SavannahFort Eustis, VASurvey Conducted on 4-15 April 2005Survey Conducted by: ERMFriable?Sample ID Material DescriptionLocation Condition Yes NoNSSDeckD-TSI-43A, -43B, -43CElbow pipe insulation associated withengine (red)Deck D-Engine Room Good xNSSDeckD-TSI-44A, -44B, -44CStraight run pipe insulation associatedwith evaporatorsDeck D-Engine Room Good xNSSDeckD-TSI-45A, -45B, -45CElbow pipe insulation associated withevaporatorsDeck D-Engine Room Good xNSSDeckD-TSI-46A, -46B, -46CStraight run pipe insulation associatedwith generatorsDeck D-Engine Room Fair xNSSDeckD-TSI-47A, -47B, -47CElbow pipe insulation associated withgeneratorsDeck D-Engine Room Poor xNSSDeckD-TSI-48A, -48B, -48CStraight run pipe insulation associatedwith steam valvesDeck D-Engine Room Good xNSSDeckD-TSI-49A, -49B, -49CElbow pipe insulation associated withsteam valvesDeck D-Engine Room Fair xNS-SAVANNAH/ 0028178


Asbestos Survey <strong>Field</strong> <strong>Data</strong> Sheet-14 Flat <strong>and</strong> Deck DNS-SavannahFort Eustis, VASurvey Conducted on 4-15 April 2005Survey Conducted by: ERMFriable?Sample ID Material DescriptionLocation Condition Yes NoNSSDeckD-TSI-50A, -50B, -50CStraight run pipe insulation associatedwith boiler water treatment systemDeck D-Engine Room Fair xNSSDeckD-TSI-51A, -51B, -51CInsulation associated with vent to firststage heater (body)Deck D-Engine Room Good xNSSDeckD-TSI-52A, -52B, -52CStraight run pipe insulation associatedwith condensate lineDeck D-Engine Room Good xNSSDeckD-TSI-53A, -53B, -53CNSSDeckD-FT-54A, -54B, -54CStraight run pipe insulation associatedwith diesel engine exhaust (uppersection)Tan, 9"x9" floor tile with black specks<strong>and</strong> associated masticDeck D-Engine Room Good xDeck D- Food Storage Area Poor xNSSDeckD-FT-55A, -55B, -55CBrown 9" x9" floor tile with black <strong>and</strong>white specks <strong>and</strong> associated masticDeck D- Food Storage Area Poor xNSSDeckD-TSI-56A, -56B, -56C Straight run pipe insulation Deck D-Food Storage Area Good xNSSDeckD-TSI-57A, -57B, -57C Elbow pipe insulation Deck D- Food Storage Area Good xNote: All pipes are recorded as total diameter of the pipe <strong>and</strong> the associated insulation.NS-SAVANNAH/ 0028178


Survey Conducted on 4-15 April 2005Survey Conducted by: ERMAsbestos Survey <strong>Field</strong> <strong>Data</strong> Sheet-Surface DeckNS-SavannahFort Eustis, VAFriable?Sample ID Material DescriptionLocation Condition Yes NoNSSSurfaceDeck-MM-1A, -1B, -1CBlack asphalt sealant associatedwith cargo hold doorsSurface Deck Good xNS-SAVANNAH/ 0028178

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!