11.07.2015 Views

Non-Technical Summary - Chiltern Evergreen3

Non-Technical Summary - Chiltern Evergreen3

Non-Technical Summary - Chiltern Evergreen3

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EVERGREEN 3About this DocumentThis document is the <strong>Non</strong>-<strong>Technical</strong> <strong>Summary</strong> (NTS) of theEnvironmental Statement for the <strong>Chiltern</strong> Railways (Bicesterto Oxford Improvements) Transport and Works Act Order,hereafter called ‘the Scheme’.<strong>Chiltern</strong> Railways is seeking authority from the Secretary ofState to construct and operate the railway, by means of aTransport and Works Act Order (TWAO) Application.The TWAO rules require an Environmental Impact Assessmentto be undertaken and the findings reported in anEnvironmental Statement.The Environmental Statement includes a description of theexisting environment, details of the Scheme and its impactson the environment and identifies the measures that willbe used to prevent, reduce or offset significant negativeenvironmental impacts.ToWorcesterKidlingtonA40A44A4260Oxford NorthJunctionTo Banbury andBirminghamA34IslipBicesterTownWater EatonParkway P&R buses tocity centre &RadcliffeHospitalOxfordBicesterA40A4421To Didcot andLondon Paddington(66 miles)<strong>Chiltern</strong>chord lineA41Future East-Westline to MiltonKeynesTo High Wycombe andLondon Marylebone(64 miles)Figure 1: The proposed Oxford to Bicester upgradewhich forms part of <strong>Chiltern</strong>’s plans to run servicesthrough to London MaryleboneM40The aim of this <strong>Non</strong>-<strong>Technical</strong> <strong>Summary</strong> is to summarise thecontent and main findings of the Environmental Statement in aclear and concise manner.This <strong>Non</strong>-<strong>Technical</strong> <strong>Summary</strong> and the Environmental Statementhave been prepared by Environmental Resources Management(ERM) for, and on behalf of, <strong>Chiltern</strong> Railways.Sheepwash Rail bridge to be widened and thepreserved swing bridge in the foreground4 EVERGREEN3 WWW.CHILTERN-EVERGREEN3.CO.UK

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!