27.11.2012 Views

Networked Protection of Productivity: HYDAC CM-Expert.

Networked Protection of Productivity: HYDAC CM-Expert.

Networked Protection of Productivity: HYDAC CM-Expert.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

E 10.141.0/08.12<br />

3<br />

<strong>HYDAC</strong> <strong>CM</strong>-<strong>Expert</strong>:<br />

Using a network <strong>of</strong><br />

sensors and s<strong>of</strong>tware,<br />

it acts as the nerve-centre<br />

<strong>of</strong> your production system.<br />

<strong>CM</strong>-<strong>Expert</strong> monitors and stores<br />

the data recorded by sensors<br />

and detects changes emerging in<br />

the system <strong>of</strong> machines and within<br />

systems.<br />

Experience developed over decades<br />

and the reference data accumulated<br />

enable analyses and forecasts for<br />

production-relevant parameters,<br />

such as remaining service life,<br />

service intervals and risks, to be made<br />

and evaluated – in good time and<br />

long before a standstill threatens.<br />

The <strong>CM</strong>-<strong>Expert</strong> s<strong>of</strong>tware does not just<br />

work with <strong>HYDAC</strong> sensors and<br />

actuators but also <strong>of</strong> course with<br />

other brands without restriction.<br />

Drilling ship reference:<br />

<strong>HYDAC</strong> <strong>CM</strong>-<strong>Expert</strong><br />

for the central hydraulics.<br />

90,000 litres oil, 29 pumps with<br />

a maximum flow rate <strong>of</strong> 33,000 l/min<br />

to control 5 cylinders with 24 m stroke<br />

constitute the framework <strong>of</strong> this system.<br />

To monitor the pumps and medium,<br />

92 sensors are used.<br />

Contamination, flow rate and<br />

oil condition are monitored<br />

around the clock –<br />

nothing is left to chance.<br />

Only the <strong>CM</strong>-<strong>Expert</strong> PC-S<strong>of</strong>twa<br />

Fluid Condition Monitoring with <strong>HYDAC</strong> <strong>CM</strong>-<strong>Expert</strong>, Drilling vessel example<br />

Control Cabinet:<br />

Touch Screen Monitor for <strong>CM</strong>-<strong>Expert</strong> Set-Up<br />

26 x Flow meters<br />

Control Cabinet for<br />

Master <strong>CM</strong>-<strong>Expert</strong> Station<br />

31 x Pressure<br />

Control Room:<br />

Data Monitoring<br />

4 x Oil condition<br />

31 x Contamination

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!