12.07.2015 Views

2013 Wind Project Performance White Paper ... - DNV Kema

2013 Wind Project Performance White Paper ... - DNV Kema

2013 Wind Project Performance White Paper ... - DNV Kema

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Background• Industry has a reputation for projects that underperformrelative to pre-construction energy production estimates• <strong>DNV</strong> KEMA has been documenting the magnitude of thisunderperformance since 2006 using a database of energyestimates from many consultants and actual project energyproduction• Energy estimates from <strong>DNV</strong> KEMA have historically beenmore accurate than other consultants• Significant changes in other consultants energy estimatingmethodology have been made since ~2008• Have these changes been big enough?<strong>2013</strong> <strong>Wind</strong> <strong>Project</strong> <strong>Performance</strong> <strong>White</strong> <strong>Paper</strong>May 7, <strong>2013</strong>2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!