12.07.2015 Views

Gledhill High Efficiency Condensing Boiler - Gledhill Spare Parts

Gledhill High Efficiency Condensing Boiler - Gledhill Spare Parts

Gledhill High Efficiency Condensing Boiler - Gledhill Spare Parts

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INSTALLATION DESIGN AND PLANNING INFORMATION3.5.3. <strong>Gledhill</strong> <strong>Boiler</strong>Mate OV Heating SystemThe <strong>Gledhill</strong> <strong>Boiler</strong> is also suitable for use with a <strong>Gledhill</strong> <strong>Boiler</strong>Mate OV;an integrated open vented heating system and mains pressure hot waterappliance. This appliance is supplied with factory fitted and wired systemcontrols and equipment e.g. pumps, valves etc. The <strong>Boiler</strong>Mate OV uses adirectly heated open vented primary store and is suitable for only ventedheating systems as shown schematically in diagram 3.7. For further detailsrefer to <strong>Gledhill</strong> <strong>Boiler</strong>Mate OV manual.The <strong>Boiler</strong>Mate OV acts as the neutral point of the system and therefore thecold feed and open vent must be piped to the appropriate connections onthe <strong>Boiler</strong>Mate OV.A draining tap conforming to the current issue of BS 2879, must be providedat the lowest point of the system, which will allow the entire central heatingand hot water system to be drained.The overflow/warning pipe should be in 20mm internal diameter pipe ofsuitable material for use in heating systems in accordance with BS 5449 (such ascopper). It should have continuous fall and discharge in a conspicuous externalposition. It should not have any other pipework directly branched into it.The height of the F & E cistern above the <strong>Boiler</strong>Mate OV should not be greaterthan 10m and the water level in the F & E cistern should be at least 450mmabove the highest point on the system including the radiatorsWarning/Overflow pipeMainscold supplyRemoteF &E CisternOpen ventCold feed250mm<strong>High</strong>est pointof the system<strong>Boiler</strong>MateFlowReturn<strong>Boiler</strong>•No bypass is required in the boiler circuit•Bypass valve on heating circuit not required unless the heatingcircuit incorporates 2-port zone valve or TRVs on all radiators Page 14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!