CHAPTER 10 <strong>Costing</strong> & <strong>Contracting</strong>Special rural area costs:- The cost of running power and/or gas from the property line to yourhouse.- The cost of building an approach road to your home.- The cost of clearing the building site.- The cost of a septic system and field system.- Added delivery costs due to travel distance.- Cost of drilling a well and a pressure system.- Landscaping for site drainage.The following list shows construction items that must be cost estimated.Building Structure:- Surveying- Excavating and grading- Concrete- Foundation wall labour- Engineering (PWF) (may be required)- PWF material- PWF labour- Dampproofing and weeping tile- Basement floor labour- Sand or gravel fill- Lumber supply (floors, walls, roof)- Framing labourMechanical and Electrical:- Water and sewer services- Electrical service- Heating fuel storage and service- Plumbing- Heating- Electrical (including fixtures)Y ukon <strong>Housing</strong> <strong>Corporation</strong>|Self-Help Course|Revised 07/2001241