12.07.2015 Views

The bioenergy village: Power and heat from renewables - Viessmann

The bioenergy village: Power and heat from renewables - Viessmann

The bioenergy village: Power and heat from renewables - Viessmann

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

10l11Becoming a <strong>bioenergy</strong> <strong>village</strong>:<strong>Viessmann</strong> – a partner to be relied upon at every stageAs a complete supplier of energy systems,<strong>Viessmann</strong> offers all the necessarycomponents <strong>from</strong> a single source. Inconjunction with our Group companies, wesupply not only the right <strong>heat</strong>ing systems for<strong>renewables</strong>, we also design <strong>and</strong> constructthe biogas plant. This includes raw materialsmanagement <strong>and</strong> operational control foroperating the CHP units with the biogasobtained. In addition, <strong>Viessmann</strong> supplies ast<strong>and</strong>ardised control unit to operate all the<strong>heat</strong> sources <strong>and</strong> the <strong>heat</strong>ing network.<strong>The</strong>re are invaluable benefits to this for thelocal authority or cooperative as operators ofthe local <strong>heat</strong>ing network. <strong>The</strong>re is just onecontact person for questions on technology,maintenance <strong>and</strong> repairs.design engineers are involved. Cooperationbetween <strong>Viessmann</strong>, regional serviceproviders <strong>and</strong> local construction companies isvery important with regard to value creation<strong>and</strong> securing jobs.All <strong>Viessmann</strong> services availableon requestFrom the initial concept, right through tocommissioning, costs arise which have to bemet. Comparatively small amounts for thefirst steps are usually covered by the localauthority's budget. However, high costs willeventually be incurred – at least when thebusiness plan is formulated <strong>and</strong> engineeringservices are engaged. <strong>Viessmann</strong> will finance<strong>and</strong> cover these costs with securities as partof its involvement in the project.Project partner <strong>from</strong> the word goRight <strong>from</strong> the start, <strong>Viessmann</strong> sees itselfas part of the project team. It accompaniesthe <strong>village</strong> community as it takes its firststeps towards becoming a <strong>bioenergy</strong> <strong>village</strong>.This includes studies that check, at variouslevels of detail, the feasibility of the concepts<strong>and</strong> their economic viability. In this area,<strong>Viessmann</strong>'s project development departmentcan provide valuable support. Moreover, localAs a professional partner, <strong>Viessmann</strong>has all the knowledge needed for projectcoordination, system technology <strong>and</strong> systemconstruction.<strong>The</strong> direct online contactAnyone interested can go towww.viessmann.de/bioenergiedorf for furtherinformation or to find the relevant contactperson.Procedure for designing <strong>and</strong> constructing a <strong>bioenergy</strong> <strong>village</strong>4. ServicesMaintenance<strong>and</strong> service3. Project implementationDetailed engineeringDesign <strong>and</strong> commissioningAt all stages of a <strong>bioenergy</strong> <strong>village</strong>'sTime1. Studies*Preliminarystudy2. Project development*Technical <strong>and</strong> economical conceptPresentation of possible subsidiesObtaining permitsdevelopment, <strong>Viessmann</strong> is theprofessional partner for everything,<strong>from</strong> consultation through tocontracting, delivering all services<strong>and</strong> components <strong>from</strong> a singlesource.Procedure*In conjunction with local designengineers

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!