12.07.2015 Views

IEC 61508 Functional Safety Assessment Rosemount Inc. - Exida

IEC 61508 Functional Safety Assessment Rosemount Inc. - Exida

IEC 61508 Functional Safety Assessment Rosemount Inc. - Exida

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2 Project management2.1 exidaexida is one of the world’s leading knowledge and certification companies specializing inautomation system safety and availability with over 300 years of cumulative experience infunctional safety. Founded by several of the world’s top reliability and safety experts fromassessment organizations and manufacturers, exida is a global company with offices around theworld. exida offers training, coaching, project oriented services, internet based safety engineeringtools, detailed product assurance and certification analysis and a collection of on-line safety andreliability resources. exida maintains a comprehensive failure rate and failure mode database onprocess equipment.2.2 Roles of the parties involved<strong>Rosemount</strong>, <strong>Inc</strong>.exida CertificationManufacturer of the 3051C/T/L Pressure TransmitterPerformed the <strong>IEC</strong> <strong>61508</strong> <strong>Functional</strong> <strong>Safety</strong> <strong>Assessment</strong>according to option 3 (see section 1)<strong>Rosemount</strong>, <strong>Inc</strong>. contracted exida Certification with the <strong>IEC</strong> <strong>61508</strong> <strong>Functional</strong> <strong>Safety</strong> <strong>Assessment</strong>of the above mentioned devices.2.3 Standards / Literature usedThe services delivered by exida were performed based on the following standards / literature.[N1] <strong>IEC</strong> <strong>61508</strong> (Parts 1 - 7):2010<strong>Functional</strong> <strong>Safety</strong> of Electrical/Electronic/ProgrammableElectronic <strong>Safety</strong>-Related Systems2.4 Reference documents2.4.1 Documentation provided by <strong>Rosemount</strong>DocumentReferenceDocument TitleDocumentVersion/Revision;Document Date[D02] exida Configuration Management Checklist n/a; 11/21/2011[D02a] CM Plan checklist from EDP 400-300 2/9/2012[D03] exida Documentation Checklist 11/23/2011[D04] exida Software Tool Checklist 2/16/2012[D05] exida Tool Validation Checklists 1/10/2012[D06] exida FSM Planning Phase Verification Checklist n/a; 2/16/2012[D07] Project Plan B.1; 9/29/2011[D08] Project Defined Process Documents E; 3/22/2011[D10] DOP 1810 Training Procedures R; 1/20/2010© exida Certification rosemount 11-07-062 r007 v1 r1 iec <strong>61508</strong> assessment.docx, 3/8/2012Michael Medoff Page 5 of 21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!