12.07.2015 Views

IEC 61508 Functional Safety Assessment Rosemount Inc. - Exida

IEC 61508 Functional Safety Assessment Rosemount Inc. - Exida

IEC 61508 Functional Safety Assessment Rosemount Inc. - Exida

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

[D100] Integration Test Results 3; 2/7/2012[D109] exida Integration Test Execution Phase Checklist n/a/ 3/5/2012[D11] <strong>Safety</strong> Competencies n/a;[D110] EMC Test Results 6/27/2011[D111] Validation Test Results A; 3/17/2010[D111a] ROS Validation Testing Checklist 2/23/2012[D112] Humidity Test results 5/4/2011[D113] Temperature test results 8/29/2011[D114] EMI/EMC Surge Withstand Capability test results 6/14/2011[D115] IEEE Surge Withstand test results 8/24/2011[D116] ESD test results 5/17/2011[D119] exida Validation Test Execution Phase Checklist n/a;3/5/2012[D12] EDP 400-502 Peer <strong>Safety</strong> Review A; 3/25/2010[D120] exida Hardware Design Implementation Verification Checklist Na; 2/16/2012[D13] Training and Competency Matrix 1/23/2012[D130] Meeting Minutes for 2051C/T HART7 LOI NA; 3/1/2012[D14] <strong>Safety</strong> Instrumented Systems Training Program 1/23/2012[D150]exida <strong>Functional</strong> <strong>Safety</strong> <strong>Assessment</strong> Phase VerificationChecklistn/a;3/6/2012[D128] <strong>Functional</strong> <strong>Safety</strong> <strong>Assessment</strong> Plan V1R1;3/6/2012[D16] DOP 7 <strong>Rosemount</strong> Product Development Process B; 4/1/2011[D160a] Product <strong>Safety</strong> Manual for 3051 AA; 2/17/2012[D161a] WA0007 <strong>Safety</strong> Manual Checklist H; 2/17/2012[D165a]Failure Modes, Effects and Diagnostics Analysis (FMEDA)Report-3051V1R3; 2/14/2012[D166] exida FMEDA Document Checklist n/a;1/9/2012[D167] Product Approvals n/a; 10/27/2011[D168] Product Release Version Desscription 1/26/2012[D16a]RMD_G7.3-0001 Product Realization: Project ManagementProcessA; 7/1/2011[D17] DOP 415 Product Design and Development Process I; 10/13/2011[D17a] DOP416 SIS Product Design and Development Process I;[D18] DOP 440 Engineering Change Procedure AK; 2/1/2011[D180][D181]Impact Analysis TemplateImpact Analysis Example© exida Certification rosemount 11-07-062 r007 v1 r1 iec <strong>61508</strong> assessment.docx, 3/8/2012Michael Medoff Page 6 of 21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!