26Fastighetsägare som bli blåsta på v<strong>in</strong>den. En analys av fastighetsägarnas motstridiga<strong>in</strong>tressen att utnyttja naturresurser genom v<strong>in</strong>dkraftverk och bergvärmepumpar.Åkesson, Marie (Göteborgs Universitet). <strong>2011</strong>.http://hdl.h<strong>and</strong>le.net/2077/25529.Keywords: Konkurrensrätt<strong>W<strong>in</strong>d</strong> <strong>Power</strong> <strong>and</strong> Its Impact on the Moldovan Electrical System.Eriksson, Joel (Uppsala University), Gozdz Englund, Simon (Uppsala University).http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-173725.Keywords: pss/e, python, power system, w<strong>in</strong>d power, w<strong>in</strong>d energy, electrical system,cont<strong>in</strong>gency analysis, MoldovaUtvärder<strong>in</strong>g av urban v<strong>in</strong>dkraft.Mel<strong>in</strong>, Björn (Umeå Universitet). <strong>2011</strong>.http://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-59098.Keywords: NCC, Solna Stad, urban v<strong>in</strong>dkraft, IVL, PEST, SWOTHybrid Energy System for Off – Grid Rural Electrification (Case study Kenya).Ouma, Cl<strong>in</strong>t Arthur (Gotl<strong>and</strong> University). <strong>2011</strong>.http://www.hgo.se/wpmaster/2609-hgo/version/default/part/AttachmentData/data/MSC%20WIND%20POWER%20PROJECT%20MANAGEMENT%20%28Repaired%29.pdf.Keywords: Hybrid Energy System, <strong>W<strong>in</strong>d</strong> <strong>Power</strong>, Hybrid <strong>Power</strong> Optimization, Off–Grid RuralElectrificationDesign of Harmonic Filters for Renewable Energy Applications.Kumar, Bhunesh (Gotl<strong>and</strong> University). <strong>2011</strong>.http://www.hgo.se/wpmaster/2782-hgo/version/default/part/AttachmentData/data/thesis_report_v_Bahri.pdf.Keywords: Digital Filter, Impulse Response, Wave Digital Filter, Circulator-Tree WAVE DigitalFilter, Harmonics Filter, Renewable energy Filter, <strong>W<strong>in</strong>d</strong> Energy Filter, Butterworth, Chebyshev<strong>and</strong> Cauer filters, Low-pass, High-pass <strong>and</strong> B<strong>and</strong>-pass filtersBalanc<strong>in</strong>g of <strong>W<strong>in</strong>d</strong> <strong>Power</strong>: Optimization of power systems which <strong>in</strong>clude w<strong>in</strong>d power.Ulker, Muhammed Akif (Gotl<strong>and</strong> University). <strong>2011</strong>.http://www.hgo.se/wpmaster/2911-hgo/version/default/part/AttachmentData/data/Thesis_Muhammed.pdf.Keywords: <strong>W<strong>in</strong>d</strong> power, power systems, electricity markets, frequency control, voltage control,operation plann<strong>in</strong>gAssessment of Mar<strong>in</strong>e Conditions for Logistics, Operation Envelope <strong>and</strong> Weather<strong>W<strong>in</strong>d</strong>ow for Offshore Projects.Selvaraj, Edw<strong>in</strong> Selvaraj (Gotl<strong>and</strong> University). <strong>2011</strong>.http://www.hgo.se/wpmaster/2695-hgo/version/default/part/AttachmentData/data/Thesis_-_<strong>2011</strong>_-_Edw<strong>in</strong>_Rajesh.pdf.Keywords: DOF (Degrees Of Freedom), Equations of motion, MSS (Mar<strong>in</strong>e System Simulator),Waves, Crane<strong>W<strong>in</strong>d</strong> Speed Prediction us<strong>in</strong>g Global <strong>and</strong> Regional Based Virtual Towers <strong>in</strong> CFDSimulations.Moubarak, Roger (Gotl<strong>and</strong> University). <strong>2011</strong>.http://www.hgo.se/wpmaster/2783-hgo/version/default/part/AttachmentData/data/Thesis_work_4.pdf.Keywords: Global-Regional Global Model, Era Interim, StormGeo, WRF, ECMWF, Data Series,<strong>W<strong>in</strong>d</strong>Sim, H<strong>in</strong>dcast
27<strong>W<strong>in</strong>d</strong> <strong>Power</strong> Potential <strong>in</strong> Palest<strong>in</strong>e/Israel: An <strong>in</strong>vestigation study for the potential of w<strong>in</strong>dpower <strong>in</strong> Palest<strong>in</strong>e/Israel, with emphasis on the political obstacles.Odeh, Yousre (Gotl<strong>and</strong> University). <strong>2011</strong>.http://www.hgo.se/wpmaster/2615-hgo/version/default/part/AttachmentData/data/<strong>W<strong>in</strong>d</strong>_<strong>Power</strong>_Potential_<strong>in</strong>_Palest<strong>in</strong>e%20%282%29.pdf.Keywords: <strong>W<strong>in</strong>d</strong> resource assessment, l<strong>and</strong> breeze, sea breeze, w<strong>in</strong>d fluctuation, w<strong>in</strong>dfrequency rose, diurnal w<strong>in</strong>d profile, correlation matrix, West-bank, Palest<strong>in</strong>e, Israel, w<strong>in</strong>dprofile, Israeli-Palest<strong>in</strong>ian conflict, political barriers.<strong>W<strong>in</strong>d</strong> Flow Analysis on a Complex Terra<strong>in</strong>: A reliability study of a CFD tool on forestedarea <strong>in</strong>clud<strong>in</strong>g effects of forest module.Teneler, Görkem (Gotl<strong>and</strong> University). <strong>2011</strong>.http://www.hgo.se/wpmaster/3065-hgo/version/default/part/AttachmentData/data/<strong>W<strong>in</strong>d</strong>%20Flow%20Analysis%20on%20a%20Complex%20Terra<strong>in</strong>%20by%20G%C3%B6rkem%20Teneler.pdf.Keywords: <strong>W<strong>in</strong>d</strong>, Complex terra<strong>in</strong>, Forest, CFD, <strong>W<strong>in</strong>d</strong>SimReliable Centered Ma<strong>in</strong>tenance (RCM) Reliable <strong>and</strong> Risk Centered Ma<strong>in</strong>tenance (RRCM)<strong>in</strong> Offshore <strong>W<strong>in</strong>d</strong> Farms (Case Study- <strong>Sweden</strong>).Kharaji Manouchehrabadi, Maryam (Gotl<strong>and</strong> University). <strong>2011</strong>.http://www.hgo.se/wpmaster/2620-hgo/version/default/part/AttachmentData/data/F<strong>in</strong>al_Thesis_Maryam01.pdf.Keywords: Offshore w<strong>in</strong>d farm ma<strong>in</strong>tenance, Preventive ma<strong>in</strong>tenance, Reliable centeredma<strong>in</strong>tenance (RCM), Reliable <strong>and</strong> Risk Centered Ma<strong>in</strong>tenance (RRCM)Proposed Methodology for Technical Due Diligence Assessment of <strong>W<strong>in</strong>d</strong> Farm Projects.Lynch, Keith (Gotl<strong>and</strong> University). <strong>2011</strong>.http://www.hgo.se/wpmaster/2621-hgo/version/default/part/AttachmentData/data/Keith_Lynch_-_Thesis_Report_-_F<strong>in</strong>al_Presentation_Copy.pdf.Keywords: Due diligence, Technical Due Diligence, w<strong>in</strong>d farm, risk assessmentOffshore <strong>W<strong>in</strong>d</strong> Turb<strong>in</strong>e Transportation & Installation Analyses: Plann<strong>in</strong>g Optimal Mar<strong>in</strong>eOperations for Offshore <strong>W<strong>in</strong>d</strong> Projects.Uraz, Emre (Gotl<strong>and</strong> University). <strong>2011</strong>.http://www.hgo.se/wpmaster/2652-hgo/version/default/part/AttachmentData/data/F<strong>in</strong>al_Presentation_Copy_Emre_Uraz_17.06.<strong>2011</strong>_Friday.pdf.Keywords: Offshore w<strong>in</strong>d farms, transportation <strong>and</strong> <strong>in</strong>stallations, jack-up vessels, w<strong>in</strong>d turb<strong>in</strong>e<strong>in</strong>stallation vessels, design trends <strong>in</strong> <strong>in</strong>stallation vessels, assembly <strong>and</strong> pre-assembly, projectdurations, onboard cranes, challenges due to offshore environment, time performance, craneoperationsPerformance Based Contract<strong>in</strong>g - A Concept for Cost-effective Operation <strong>and</strong>Ma<strong>in</strong>tenance of <strong>W<strong>in</strong>d</strong> <strong>Power</strong> Plants.Dibennardo, Maurizio (Gotl<strong>and</strong> University). <strong>2011</strong>.http://www.hgo.se/wpmaster/2721-hgo/version/default/part/AttachmentData/data/maudib01THESIS_F<strong>in</strong>al_Presentation_Copy.pdf.Keywords: w<strong>in</strong>d power, service, operation, ma<strong>in</strong>tenance, contract management, performancebased contract<strong>in</strong>g, performance measur<strong>in</strong>g, availability, downtime, <strong>in</strong>centives, dis<strong>in</strong>centives,revenue, SLA, KPITurb<strong>in</strong>e Mounted LIDAR: The Pulsed Lidar as a Reliable Alternative.Braña, Isaac (Gotl<strong>and</strong> University). <strong>2011</strong>.http://www.hgo.se/wpmaster/3234-hgo/version/default/part/AttachmentData/data/Turb<strong>in</strong>e%20Mounted%20LIDAR%20The%20pulsed%20lidar%20as%20a%20reliable%20alternative-v1%20(08%20December%20<strong>2011</strong>).pdf.Keywords: <strong>W<strong>in</strong>d</strong> power, Doppler lidar, pulsed lidar, cont<strong>in</strong>uous-wave lidar, power controlsystem, w<strong>in</strong>d turb<strong>in</strong>e-mounted lidar