12.07.2015 Views

BSNL EW Providing neutral Earthing and extending cable for 15 ...

BSNL EW Providing neutral Earthing and extending cable for 15 ...

BSNL EW Providing neutral Earthing and extending cable for 15 ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>BSNL</strong> <strong>EW</strong> <strong>Providing</strong> <strong>neutral</strong> <strong>Earthing</strong> <strong>and</strong> <strong>extending</strong> <strong>cable</strong>Vengaivasal GSM BTS site,chennai.<strong>for</strong> <strong>15</strong> KVA EA Set atSPECIFICATION FOR THE WORK OF PROVIDING EI & FANS AND CABLE LAYING1. The works shall be done as per current CPWD Specifications <strong>for</strong> electrical works asamended from time to time <strong>and</strong> Indian Electricity rules as amended time to time.The specification <strong>for</strong> any of the items which are not covered under CPWD currentSpecifications /IE rules/IE Act, then relevant IS shall apply.2. Unless otherwise specified in particular, the entire equipment /system shall besuitable <strong>for</strong> operation on 4<strong>15</strong> volts / 240 volts with earthed <strong>neutral</strong>, three / singlephase alternating current system.3. The work shall be supervised by qualified Electrical staff.4. The layout of the work will be given by Engineer-in-charge or his duly authorizedrepresentative at site of work.5. The following wiring shall be done on separate conduits.a. Power plug wiringb. Light <strong>and</strong> fan wiring.c. Emergency Light wiring(DC supply)d. Telephone Wiringe. AC units wiringThe no. of power points <strong>and</strong> emergency light points shall not exceed two perCircuit in any of the cases.6. The <strong>Earthing</strong> <strong>and</strong> <strong>cable</strong> laying work shall be done in the presence of Engineer-inchargeor his authorized representative.7. Sample of all the materials, fittings, IC switch gears etc., shall be got approvedfrom the Engineer-in-charge be<strong>for</strong>e using the same on the work. The rejectedmaterials shall be removed immediately from the site of work.8. The completion plan in triplicate in respect of the connection diagram <strong>and</strong> <strong>cable</strong>route should be submitted by the contractor as per the relevant clause of<strong>BSNL</strong>/PWD 8.9. The contractor shall conduct the following tests at his own costs <strong>and</strong> submit thetest results as per the pro<strong>for</strong>ma enclosed be<strong>for</strong>e the final bill is paid. Nothing extrawill be paid on this account.a. Earth testb. Polarity testc. Insulation testd. Earth continuity test of the surface/recess conduit pipes.10. Any damage done to the building by the contractor during in connection of workshall have to be made good at his own cost <strong>and</strong> risk. If he does not do it himselfContractor Page - 41 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!