12.07.2015 Views

xhygw

xhygw

xhygw

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

d) a detailed explanation as to why the proposed Line 2 corridor between RK usB andRK 1159 (resulting in a proposed Line 2 corridor through City of Surrey parkland)was selected instead of continuing the corridor through the existing Golden EarsConnector corridor and the CN right of way between RK ns8 and RK nsg;e) please confirm whether or not Trans Mountain has conducted or obtained anyfeasibility studies, assessments, investigations or reports considering an alternativealignment of the proposed Line 2 corridor between RK usS and us9 through theexisting Golden Ears Connector corridor and/or the CN right of way:(i)(ii)(iii)(iv)if any feasibility studies, assessments, investigations or reports have beenconducted or obtained, please provide the City of Surrey with copies of allsuch studies, assessments, investigations and reports and please identify thedate and author(s) of each;if Trans Mountain does not intend to conduct or obtain any such feasibilitystudies, assessments, investigations or reports, please provide anexplanation as to why not;if there are any known or perceived impediments/obstacles to locating analignment of the proposed Line 2 corridor between RK 1158 and 1159through the existing Golden Ears Connector corridor and/or the CN right ofway, please identify and describe what those impediments/obstacles are,who identified them and what evidence was relied upon in determiningthat such impediments/obstacles exist. Please also indicate whether anyassessment, review or investigation of these impediments/obstacles hasbeen conducted or commissioned by Trans Mountain to ascertain whetherthese impediments/obstacles can be overcome or minimized; andif any such assessments, reviews or investigations described in paragraph(e)(iii) above have been undertaken, please provide the City with copies ofthem and please identify the date and author(s) of each. If suchassessments, reviews or investigations have not been undertaken, pleaseprovide an explanation as to why not;(0 please confrrm whether or not Trans Mountain has had discussions orcommunications with the Province and/or CN in relation to utilizing the existingGolden Ears Connector corridor and/or the CN right of way between RK ns8 andRK1159 as the proposed Line 2 corridor:(i)if so, please provide details of such discussions and communications, asummary of the positions taken by each of Province and CN, the basis andrationale provided by the Province and by CN for the position each has

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!