12.07.2015 Views

xhygw

xhygw

xhygw

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

h) for those segments ofthe proposed pipeline in the City of Surrey, what is the lifeexpectancy in years of said pipeline segments after the expiry of which thosepipeline segments would have to be replaced? In other words, how many years arethe said pipeline segments expected to last before they must be replaced?;i) what is the industry standard life expectancy in years of the type of pipelineproposed to be installed in the City of Surrey?;j) in assessing or quantifying the anticipated future costs of operating the proposedpipeline, what is the replacement schedule that has been used for those segmentsofthe pipeline to be installed in the City of Surrey?;k) for financial statement purposes and for tax return purposes what is anticipated tobe the rate(s) of depreciation on a percentage basis that will be applied to calculatedepreciation of the pipeline on an annual basis? What is the rate(s) ofdepreciation applied to calculate annual depreciation of the existing pipeline forfinancial statement purposes and for tax return purposes;Fixed timing of pipeline work to be performed by Trans Mountain toaccommodate highway construction. widenin& and improvement projects so asnot to delay municipal projects1) please confirm whether or not Trans Mountain is prepared to agree to perform allnecessary pipeline related work within a fixed period of time so as not to delay anyfuture highway construction, widening or improvement project that occurs acrossor in vicinity of the pipeline which might disturb the pipeline or whichnecessitates realigning, raising or lowering the pipeline or excavating materialfrom, over or around it, or adding casings or other appurtenances deemednecessary by Trans Mountain for the protection of the pipeline;m) if Trans Mountain is not prepared to provide the agreement described inparagraph (1) above, please provide a detailed explanation as to why not and pleasedescribe in detail under what circumstances Trans Mountain would be prepared todo so. Please also explain how the City of Surrey and other municipalities and theProvince can obtain assurances that all necessary pipeline work to accommodatethe projects described in paragraph (1) above will be performed by Trans Mountainwithout delay to the highway construction, widening or improvement projects;n) having regard to section 108 of the National Energy Board Act and the jurisdictionof the NEB, please confirm whether or not Trans Mountain is prepared to consentto including as a condition or term of any certificate or CPCN issued approvingTrans Mountain's Application that Trans Mountain shall perform all pipeline work

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!