xhygw
xhygw
xhygw
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
-18-prepare an agency/first responder, should there be public enquiries or the needfor response;g) a comprehensive list of the number of Trans Mountain (KMC) employees withFirefighting training, Hazardous Materials/Dangerous Goods Responsetraining;h) a complete fire and spill equipment review and availability study for theconstruction phase;i) a comprehensive finalized Emergency Response Plan for the planned corridorinclusive of all HCA areas in Surrey;j) a comprehensive review ofTrans Mountain (KMC) equipment available forresponse along the proposed corridor in Surrey; andk) a comprehensive study of the advantages and disadvantages of In-Situ Burningas they would apply to all HCA areas of Surrey.1.5 Review of Noise Impacts to Surrey ResidentsReference:(i)Application Volume sA, ESA- Biophysical, Section 5.65 Acoustic Environment-Hope to Burnaby Segment• PDF page 308.Preamble:Reference (i) discusses the acoustic environment and potential impacts to areas in Surrey.Request:a) The proposed alignment through the City of Surrey will result in tree loss thatcurrently buffers residents from transportation corridors and industrial areas.Provide a detailed report on the noise and visual impacts to residents resultingfrom the planned alignment and measures planned to mitigate the impacts.