12.07.2015 Views

xhygw

xhygw

xhygw

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

-18-prepare an agency/first responder, should there be public enquiries or the needfor response;g) a comprehensive list of the number of Trans Mountain (KMC) employees withFirefighting training, Hazardous Materials/Dangerous Goods Responsetraining;h) a complete fire and spill equipment review and availability study for theconstruction phase;i) a comprehensive finalized Emergency Response Plan for the planned corridorinclusive of all HCA areas in Surrey;j) a comprehensive review ofTrans Mountain (KMC) equipment available forresponse along the proposed corridor in Surrey; andk) a comprehensive study of the advantages and disadvantages of In-Situ Burningas they would apply to all HCA areas of Surrey.1.5 Review of Noise Impacts to Surrey ResidentsReference:(i)Application Volume sA, ESA- Biophysical, Section 5.65 Acoustic Environment­-Hope to Burnaby Segment• PDF page 308.Preamble:Reference (i) discusses the acoustic environment and potential impacts to areas in Surrey.Request:a) The proposed alignment through the City of Surrey will result in tree loss thatcurrently buffers residents from transportation corridors and industrial areas.Provide a detailed report on the noise and visual impacts to residents resultingfrom the planned alignment and measures planned to mitigate the impacts.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!