12.07.2015 Views

Elephant and Castle - Provision of a New Leisure Facility

Elephant and Castle - Provision of a New Leisure Facility

Elephant and Castle - Provision of a New Leisure Facility

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

• The layout <strong>of</strong> the building will be designed to ensure the main entrance isorientated towards the <strong>Elephant</strong> & <strong>Castle</strong>.• The new leisure facility will be car free except for disabled parking provisionrequired to meet Southwark Plan requirements. The facility will also be requiredto be fully DDA compliant.• The massing <strong>of</strong> the proposed building will be guided by its relationship to theexisting residential properties in particular on Brook Drive <strong>and</strong> sunlight / daylightimpacts will be tested through the next stage <strong>of</strong> the design process prior to thesubmission <strong>of</strong> a planning application.• The external appearance <strong>of</strong> the building will be required to be compatible to itssurroundings whilst remaining functional <strong>and</strong> sustainable.• The new facility will be required to comply with London <strong>and</strong> Southwark Plansustainability requirements <strong>and</strong> relevant building control st<strong>and</strong>ards. This might beachieved via the MUSCo if those proposals are agreed by the council or if not analternative plan will be developed as part <strong>of</strong> the planning submission.2. <strong>Leisure</strong> facility budget <strong>and</strong> cash flowA Capital bid <strong>of</strong> £20m has been made <strong>and</strong> the provision <strong>of</strong> this facility will bemanaged within that total. This comprises <strong>of</strong> £19m construction costs <strong>and</strong> £1mproject contingency. Based on the draft programme current estimated cash flow is asfollows:• 2010/11 £0.2m• 2011/12 £1m• 2012/13 £11.8m• 2013/14 £6.5m• 2014/15 £0.5mA pre-planning budget will be required to progress design work <strong>and</strong> survey work upto the point <strong>of</strong> submission <strong>of</strong> a planning application <strong>and</strong> this will be reported as part <strong>of</strong>the capital programme bid. At this stage a report will be provided to the ProjectExecutive, Cabinet Member for Culture <strong>Leisure</strong> Sport <strong>and</strong> the Olympics <strong>and</strong> the

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!