12.07.2015 Views

Jim Kellett Takes the Lead at ECAO 2011 ECAO Industry Conference

Jim Kellett Takes the Lead at ECAO 2011 ECAO Industry Conference

Jim Kellett Takes the Lead at ECAO 2011 ECAO Industry Conference

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

F. Supp. 17(W.D. Mo. 1972)) case: <strong>the</strong> courtfound th<strong>at</strong> comparing <strong>the</strong> unit costs during<strong>the</strong> impacted and unimpacted periods was areasonable manner in which to compute <strong>the</strong>damages, and N<strong>at</strong>kin was awarded its lostproductivity damages. Moreover, in ClarkConcrete Contractors, Inc v. General ServicesAdministr<strong>at</strong>ion (GSBA No. 14,340, 99-1BCA (CCH) (1999)), <strong>the</strong> Board permittedOmni (<strong>the</strong> contractor) to recover damagesof more than $1 million for lost productivitybased on <strong>the</strong> measured mile analysis.3. There is a direct correl<strong>at</strong>ion betweenlabour inefficiency and <strong>the</strong> dur<strong>at</strong>ion ofovertime use.4. Despite productivity losses rel<strong>at</strong>ed toovertime, placing an electrical crewon overtime schedule is more efficientthan overmanning.5. The d<strong>at</strong>a collected for this study waslimited to electrical workers for projectsexecuted between 2004 and 2008.6. The measured mile method was used inthis study, which compares periods of timewhen <strong>the</strong> regular 40-hour work week wasutilized to overtime schedules of 50 hoursor more. The measured mile technique isa widely accepted and accur<strong>at</strong>e method ofcapturing labour inefficiency.Use of The New StudyIt is widely and legally recognized th<strong>at</strong> inefficiencyfactors cited in <strong>the</strong> N<strong>at</strong>ional ElectricalContractors Associ<strong>at</strong>ion (NECA) study andThere were two components of this newstudy: qualit<strong>at</strong>ive and quantit<strong>at</strong>ive. Thequalit<strong>at</strong>ive aspect aims to document <strong>the</strong>views of electrical contractors regarding <strong>the</strong>use of overtime and o<strong>the</strong>r schedule compressiontechniques such as overmanning andshiftwork. The quantit<strong>at</strong>ive component dealswith macro and micro analysis of overtime.The macro and micro approaches are usedfor analyzing <strong>the</strong> impact of both sporadic andscheduled overtime. The macro approachis used to analyze projects where no fixedovertime schedule is utilized or mixed workschedules are used throughout a week. Themicro approach is used to analyze projectsth<strong>at</strong> utilize a fixed overtime schedule, such as5x10 or 6x10 throughout a certain numberof weeks. This new study presents <strong>the</strong> resultsof a st<strong>at</strong>istical analysis of productivity d<strong>at</strong>acollected from several projects th<strong>at</strong> used avariety of overtime scheduling techniques.The st<strong>at</strong>istical analysis includes severalproductivity models th<strong>at</strong> can be used toestim<strong>at</strong>e electrical labour inefficiency withina project, given both its scheduled overtimeper week and <strong>the</strong> total successive number ofweeks of overtime. Figure 1 compares <strong>the</strong>results of <strong>the</strong> new and old NECA study on<strong>the</strong> impact of 5x10 overtime schedule onlabour productivity.Additional conclusions and scope highlight<strong>the</strong> findings of this study:1. Placing an electrical crew on scheduledor unscheduled overtime reduces labourproductivity and increases labour costs.Bucket Trucks, Digger Derricks,Stringing Gear, and more...EVERYTHING YOU NEEDTO GET THE JOB DONE• Equipment Loc<strong>at</strong>ions Throughout Canada• N<strong>at</strong>ionwide Service and Repair Network• High Selection of L<strong>at</strong>e Model Units• Immedi<strong>at</strong>e Equipment Availability• Flexible Rent or Rent to Purchase OptionsView Our Full Inventory Onlinewww.nescosales.com2. A gre<strong>at</strong>er number of hours workedbeyond <strong>the</strong> regular 40 hours per week isrel<strong>at</strong>ed to higher productivity losses.Eastern Canada1-866-816-8941Western Canada1-877-513-6848SDP 4100Commercial Equipment Corp. is an authorized distributor for Nesco, LLC.Ontario Electrical Contractor39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!