Oil Spill Recovery and Cleanup Knowhow Peter Rigby, Director ...
Oil Spill Recovery and Cleanup Knowhow Peter Rigby, Director ...
Oil Spill Recovery and Cleanup Knowhow Peter Rigby, Director ...
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Oil</strong> <strong>Spill</strong> <strong>Recovery</strong> <strong>and</strong> <strong>Cleanup</strong> <strong>Knowhow</strong><strong>Peter</strong> <strong>Rigby</strong>,<strong>Director</strong> China, Lamor Corporation Ab.
• Lamor Corporation founded in 1982• Lamor Slickbar founded in 1960 (100% ownership)• Based in Finl<strong>and</strong>, strategic offices in UK, USA <strong>and</strong> China• Joint ventures: Colombia, Georgia, Kazakhstan, Oman, Russia, UAE• Agent <strong>and</strong> distributor network in approx. 90 countries
• Contingency planning, Accreditedtraining <strong>and</strong> Preparedness• Lamor Response Team (LRT) deployedto support <strong>and</strong> provide expertise• Offshore oil recovery• Nearshore, harbor, river, beach <strong>and</strong> shorelineoil recovery <strong>and</strong> clean-up• L<strong>and</strong> remediation• Industrial response <strong>and</strong> recovery• Subsea recovery• Arctic oil recovery equipment <strong>and</strong> expertise
• Skimmers in various sizes• <strong>Oil</strong> containment booms• Power packs <strong>and</strong> pumps• Absorbents <strong>and</strong> dispersants• L<strong>and</strong>ing crafts <strong>and</strong> work boats• <strong>Oil</strong> spill vessel design, conversion, <strong>and</strong>equipment
• Skimmers in various sizes
• <strong>Oil</strong> containment booms
• Power packs <strong>and</strong> pumps
• L<strong>and</strong>ing crafts <strong>and</strong> work boats
• <strong>Oil</strong> spill vessel design, conversion, <strong>and</strong> equipment
Bureau Veritas, Lloyd’s Register of Shipping, Nordic Workboat St<strong>and</strong>ard,Russian Maritime Register, Russian River Register <strong>and</strong> the Nautical Instituteof United Kingdom <strong>and</strong> soon to be accredited by China Classification Society forMarine Products
• Northern European Coastguard (several)• Northern American authorities <strong>and</strong>representative agencies• Russian authorities <strong>and</strong> ministries• European Union environmentaladministrations• European Maritime Safety Agency(EMSA)• Chinese governmental <strong>and</strong> maritimedepartments (MSA)• Middle Eastern environmental <strong>and</strong>representative agencies
In the last two years we have been involved in spills in the Gulf of Mexico, China, Australia <strong>and</strong>Estonia
Lamor Involvement in an <strong>Oil</strong> <strong>Spill</strong> – DWH Case Study
The Basic Principal:• Identify the Need• Design the Solution• Engineer the Product• Deliver to Customer on TurnKey Basis including Start up<strong>and</strong> Training for Duration of <strong>Oil</strong><strong>Spill</strong>
Max2.0Knot
Max0.75Knots
Gonzales2 personsLamor comm<strong>and</strong>Kenner3 personsHopedale2 personsTheodore,Mobile4 personsDulac /Morgan city,Almeria2 persHouma1 persFourchon2 personsVenice6 persons
Lamor involvement in summary:• Air Cargo – 112 shipments from Finl<strong>and</strong>, totaling 313 tons cargo, 1750. A further 150 tons cargo from China.• Skimming Systems – over 460 which represents 60% of the total(other suppliers) equipment delivered• Pumping Systems – over 100• <strong>Oil</strong> containment booms – over 200,000 meters (approx. 600,000 ft)• LRT on site – over 130/days• LRT members – between 10-20 on average• LRT staging areas – 6 strategically located in Louisiana <strong>and</strong> Alabama• Tasks – logistics, training, installation, maintenance <strong>and</strong>decommissioning
Case DWH: Lamor global involvementSeymour, USA 24.4.2010• 26 April Ramp up production• 30 April Incharge of international Lamor logistic• 1 May Setup of Financial administration• 15 June Startup factory #2• 24/7 operations, 2 shifts, 2 production locations• Lamor Slickbar Staff , average 45 personsLamor HQ Porvoo, FINLAND 24.4. – 23.10.2010• 24 April Lamor Comm<strong>and</strong> team established• 25 April Global Alert Lamor network• 26 April First equipment delivery• Production ramp-up, 200 subcontractors• Over 475 skimmers, 600 pumps, 900 powerpacks produced• 112 Air cargo shipment, totaling 313 tons cargo, 1750 mLamor, UK 24.4. - 23.10.2010• 27 April Resources to•US, Team leader•Finl<strong>and</strong>, Logistic•China, Project managementNew Orleans, USA 24.4. - 23.10.2010• 24 April Houma BP Comman Post• 25 April Vessel Of Opportunity (VOO) program• 1 May, Lamor Comm<strong>and</strong> Post established in Kenner, New OrleansTeam 1 KennerTeam 2 VeniceTeam 3 HopedaleTeam 4 GonzalesTeam 5 DulacTeam 6 Mobile• Lamor staff on location for >130 days, on average 12-20 persons• Personnel rotation 3-4 weekLamor, Dubai 24.4. - 23.10.2010• Equipment delivery•Skimmers•Pumps•Powerpacks• Air-freighted to USLamor, Oman 24.4. - 23.10.2010• Equipment delivery• Resources to US, Team leader• Involment 6 monthsLamor, China 24.4. - 23.10.2010• 25 April Management Team China setup• Boom production ramp-up• 7 factories•24/7 operation• 300 000 meters of SFB 18” boom delivered• Air cargo <strong>and</strong> sea freighted
Brief history of Lamor in China:• Lamor has had a Sales Rep Officein China since 2006.• Lamor started using Chinese subsuppliersfor certain components ofLamor Equipment in 2008.• Significant sales of Equipment toMSA, CNPC, CNOOC <strong>and</strong> ChinaSalvage
Lamor’s involvement in <strong>Oil</strong> Spils in ChinaDALIANDalian <strong>Oil</strong> <strong>Spill</strong>Accident: Pipeline <strong>and</strong> tank explosion resulting in 1500 t crude oil being leakedLamor had 3 persons from Beijing rep office on site <strong>and</strong> assisted with the clean up usingLamor equipment
Lamor’s involvement in <strong>Oil</strong> Spils in China
Lamor’s current activity:• Recently incorporated a WOFE (April2012). Transition period from Rep Officeto WOFE to be complete September2012.• Currently setting up a DistributionWarehouse on outskirts of Beijing (to beoperational by July 2012).• Current Employees 13 (12 based inBeijing 12 <strong>and</strong> based in LongKou)• Main Office in Central Beijing
Issues which we have come across in China:• Who to trust? Developing contacts takes time <strong>and</strong>you must ensure you develop the right ones.• Intellectual Property Rights <strong>and</strong> enforcementthereof.• Lack of local knowledge can be costly <strong>and</strong> timeconsuming.• Dealing with Agents <strong>and</strong> when commissions are tobe paid <strong>and</strong> how much <strong>and</strong> in what form?• As a small company be aware of joint ventureswith local Companies (especially minorityshareholdings).
Issues we have faced withProduction in China:• Cost increases, including labour,materials, <strong>and</strong> inflation.• Euro / RMB fluctuation.• Quality Control.• Finding the right Sub-suppliers forour business.
General Advice:• Form your own underst<strong>and</strong>ing of the Market<strong>and</strong> Customers.• Develop a clear China Strategy.• Select the Right Partners• Underst<strong>and</strong> the Role of Contracts• Have a good local team who can advise you<strong>and</strong> provide the background information for youto base your decisions on.• No longer see the benefit of a Rep Office.