12.07.2015 Views

Oil Spill Recovery and Cleanup Knowhow Peter Rigby, Director ...

Oil Spill Recovery and Cleanup Knowhow Peter Rigby, Director ...

Oil Spill Recovery and Cleanup Knowhow Peter Rigby, Director ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Oil</strong> <strong>Spill</strong> <strong>Recovery</strong> <strong>and</strong> <strong>Cleanup</strong> <strong>Knowhow</strong><strong>Peter</strong> <strong>Rigby</strong>,<strong>Director</strong> China, Lamor Corporation Ab.


• Lamor Corporation founded in 1982• Lamor Slickbar founded in 1960 (100% ownership)• Based in Finl<strong>and</strong>, strategic offices in UK, USA <strong>and</strong> China• Joint ventures: Colombia, Georgia, Kazakhstan, Oman, Russia, UAE• Agent <strong>and</strong> distributor network in approx. 90 countries


• Contingency planning, Accreditedtraining <strong>and</strong> Preparedness• Lamor Response Team (LRT) deployedto support <strong>and</strong> provide expertise• Offshore oil recovery• Nearshore, harbor, river, beach <strong>and</strong> shorelineoil recovery <strong>and</strong> clean-up• L<strong>and</strong> remediation• Industrial response <strong>and</strong> recovery• Subsea recovery• Arctic oil recovery equipment <strong>and</strong> expertise


• Skimmers in various sizes• <strong>Oil</strong> containment booms• Power packs <strong>and</strong> pumps• Absorbents <strong>and</strong> dispersants• L<strong>and</strong>ing crafts <strong>and</strong> work boats• <strong>Oil</strong> spill vessel design, conversion, <strong>and</strong>equipment


• Skimmers in various sizes


• <strong>Oil</strong> containment booms


• Power packs <strong>and</strong> pumps


• L<strong>and</strong>ing crafts <strong>and</strong> work boats


• <strong>Oil</strong> spill vessel design, conversion, <strong>and</strong> equipment


Bureau Veritas, Lloyd’s Register of Shipping, Nordic Workboat St<strong>and</strong>ard,Russian Maritime Register, Russian River Register <strong>and</strong> the Nautical Instituteof United Kingdom <strong>and</strong> soon to be accredited by China Classification Society forMarine Products


• Northern European Coastguard (several)• Northern American authorities <strong>and</strong>representative agencies• Russian authorities <strong>and</strong> ministries• European Union environmentaladministrations• European Maritime Safety Agency(EMSA)• Chinese governmental <strong>and</strong> maritimedepartments (MSA)• Middle Eastern environmental <strong>and</strong>representative agencies


In the last two years we have been involved in spills in the Gulf of Mexico, China, Australia <strong>and</strong>Estonia


Lamor Involvement in an <strong>Oil</strong> <strong>Spill</strong> – DWH Case Study


The Basic Principal:• Identify the Need• Design the Solution• Engineer the Product• Deliver to Customer on TurnKey Basis including Start up<strong>and</strong> Training for Duration of <strong>Oil</strong><strong>Spill</strong>


Max2.0Knot


Max0.75Knots


Gonzales2 personsLamor comm<strong>and</strong>Kenner3 personsHopedale2 personsTheodore,Mobile4 personsDulac /Morgan city,Almeria2 persHouma1 persFourchon2 personsVenice6 persons


Lamor involvement in summary:• Air Cargo – 112 shipments from Finl<strong>and</strong>, totaling 313 tons cargo, 1750. A further 150 tons cargo from China.• Skimming Systems – over 460 which represents 60% of the total(other suppliers) equipment delivered• Pumping Systems – over 100• <strong>Oil</strong> containment booms – over 200,000 meters (approx. 600,000 ft)• LRT on site – over 130/days• LRT members – between 10-20 on average• LRT staging areas – 6 strategically located in Louisiana <strong>and</strong> Alabama• Tasks – logistics, training, installation, maintenance <strong>and</strong>decommissioning


Case DWH: Lamor global involvementSeymour, USA 24.4.2010• 26 April Ramp up production• 30 April Incharge of international Lamor logistic• 1 May Setup of Financial administration• 15 June Startup factory #2• 24/7 operations, 2 shifts, 2 production locations• Lamor Slickbar Staff , average 45 personsLamor HQ Porvoo, FINLAND 24.4. – 23.10.2010• 24 April Lamor Comm<strong>and</strong> team established• 25 April Global Alert Lamor network• 26 April First equipment delivery• Production ramp-up, 200 subcontractors• Over 475 skimmers, 600 pumps, 900 powerpacks produced• 112 Air cargo shipment, totaling 313 tons cargo, 1750 mLamor, UK 24.4. - 23.10.2010• 27 April Resources to•US, Team leader•Finl<strong>and</strong>, Logistic•China, Project managementNew Orleans, USA 24.4. - 23.10.2010• 24 April Houma BP Comman Post• 25 April Vessel Of Opportunity (VOO) program• 1 May, Lamor Comm<strong>and</strong> Post established in Kenner, New OrleansTeam 1 KennerTeam 2 VeniceTeam 3 HopedaleTeam 4 GonzalesTeam 5 DulacTeam 6 Mobile• Lamor staff on location for >130 days, on average 12-20 persons• Personnel rotation 3-4 weekLamor, Dubai 24.4. - 23.10.2010• Equipment delivery•Skimmers•Pumps•Powerpacks• Air-freighted to USLamor, Oman 24.4. - 23.10.2010• Equipment delivery• Resources to US, Team leader• Involment 6 monthsLamor, China 24.4. - 23.10.2010• 25 April Management Team China setup• Boom production ramp-up• 7 factories•24/7 operation• 300 000 meters of SFB 18” boom delivered• Air cargo <strong>and</strong> sea freighted


Brief history of Lamor in China:• Lamor has had a Sales Rep Officein China since 2006.• Lamor started using Chinese subsuppliersfor certain components ofLamor Equipment in 2008.• Significant sales of Equipment toMSA, CNPC, CNOOC <strong>and</strong> ChinaSalvage


Lamor’s involvement in <strong>Oil</strong> Spils in ChinaDALIANDalian <strong>Oil</strong> <strong>Spill</strong>Accident: Pipeline <strong>and</strong> tank explosion resulting in 1500 t crude oil being leakedLamor had 3 persons from Beijing rep office on site <strong>and</strong> assisted with the clean up usingLamor equipment


Lamor’s involvement in <strong>Oil</strong> Spils in China


Lamor’s current activity:• Recently incorporated a WOFE (April2012). Transition period from Rep Officeto WOFE to be complete September2012.• Currently setting up a DistributionWarehouse on outskirts of Beijing (to beoperational by July 2012).• Current Employees 13 (12 based inBeijing 12 <strong>and</strong> based in LongKou)• Main Office in Central Beijing


Issues which we have come across in China:• Who to trust? Developing contacts takes time <strong>and</strong>you must ensure you develop the right ones.• Intellectual Property Rights <strong>and</strong> enforcementthereof.• Lack of local knowledge can be costly <strong>and</strong> timeconsuming.• Dealing with Agents <strong>and</strong> when commissions are tobe paid <strong>and</strong> how much <strong>and</strong> in what form?• As a small company be aware of joint ventureswith local Companies (especially minorityshareholdings).


Issues we have faced withProduction in China:• Cost increases, including labour,materials, <strong>and</strong> inflation.• Euro / RMB fluctuation.• Quality Control.• Finding the right Sub-suppliers forour business.


General Advice:• Form your own underst<strong>and</strong>ing of the Market<strong>and</strong> Customers.• Develop a clear China Strategy.• Select the Right Partners• Underst<strong>and</strong> the Role of Contracts• Have a good local team who can advise you<strong>and</strong> provide the background information for youto base your decisions on.• No longer see the benefit of a Rep Office.


IActivate us!

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!