Curriculum Vitae - National Metallurgical Laboratory
Curriculum Vitae - National Metallurgical Laboratory
Curriculum Vitae - National Metallurgical Laboratory
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
2003 to 30-04-20066. Assessment of surface and substructural damages of engineering componentsby non-destructive techniques: CSIR’s Task force project (Technology forEngineering Critical Assessment, TECA), Duration: 01.04.04 to 31.03.077. NDT Centre for infrastructure asset management: sponsored by DST. Duration:1.04.2003 to 31-07-20078. Development of silt erosion resistant materials for turbines of hydro generator(GAP-154) (CV: 299.79 lakhs), Duration: 2006 -20099. Technology for assessment and refurbishment of engineering materialsand components (TAREMAC)– CSIR NETWORK Project No.: NWP-0027,Duration: 2007 – 2012(CV: 30 crores)10. Development of advanced light weight metallic materials for engineeringapplications CSIR NETWORK Project No.: NWP-0028, Duration: 2007 –201211. Development of high strength and high formable steel for Automotive applications– Supra Institutional Project (SIP 0025)12. Development of Rapidly Solidified Brazing foils- Sponsored by VSSC,Thiruvananthapuram (SSP-0372) (CV: 22.06 lakhs), Duration: 1.11. 2007 –20.10.200913. Evaluation of microstructural changes in steel used in petrochemicalindustry by NDE technique (GAP-0198) (CV: 4.76 lakhs), Duration: 17-7-2008 to 16-7- 201114. Development of Nanostructured Advanced Materials (NAM): CSIR NETWORKProject No.: NWP-0051, Duration: 2009 – 201215. Study on Giant Magneto-Impedance behaviour in Co and Fe based nano-structuredmaterials, (GAP-0230) (CV: 18.87 lakhs), Duration: 1-3-2010 to 28-2-201316. Biosynthesis of iron oxide based magnetic nanoparticles from industrial wastes,(GAP-0236) (CV: 24.91 lakhs), Duration: 1-9-2010 to 31-8-201317. Development of Nanoquasicrystalline Al-Fe-Ti-Cr/V alloys for airframe andautomotive application, (GAP-0200) (CV: 11.42 lakhs), Duration: 1-4-2009 to 31-3-20126