29.11.2012 Views

• Renewable heating in Italy: state of art and targets ... - Biosolesco

• Renewable heating in Italy: state of art and targets ... - Biosolesco

• Renewable heating in Italy: state of art and targets ... - Biosolesco

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Thank you for the attention<br />

Antonio Marco Pantaleo<br />

Mediterranea Energia Srl<br />

Largo pisc<strong>in</strong>e 31, 70010 Capurso _bari, <strong>Italy</strong><br />

+393937980448<br />

pantaleo.antonio@gmail.com<br />

<strong>Renewable</strong> thermal energy – Subsidy<br />

measures for small scale plants (<strong>art</strong> 28)<br />

<strong>•</strong> Application: small scale renewable thermal energy plants <strong>and</strong> energy<br />

efficiency measures built s<strong>in</strong>ce 2012<br />

<strong>•</strong> Feed <strong>in</strong> tariff charged on natural gas bill <strong>and</strong> def<strong>in</strong>ed by specific<br />

contracts between GSE (gestore sistema elettrico) <strong>and</strong> plant owner,<br />

based on renewable heat or saved energy<br />

<strong>•</strong> Further decree <strong>of</strong> M<strong>in</strong>istry <strong>of</strong> Economic Development with<strong>in</strong> 6 months<br />

to put <strong>in</strong>to practice the subsidy measure:<br />

- m<strong>in</strong>imum technical performances required (annex 2 <strong>of</strong> Dlg 28)<br />

- Guarantee a fair remuneration <strong>of</strong> <strong>in</strong>vestment <strong>and</strong> operational costs <strong>of</strong> the<br />

renewable projects<br />

- Incentive duration <strong>of</strong> 10 years, constant amount over the timel<strong>in</strong>e<br />

- Specific subsidy amounts dedicated to each technology should be<br />

<strong>in</strong>troduced

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!