12.07.2015 Views

Current Catalog - John S. Hyatt & Associates, Inc.

Current Catalog - John S. Hyatt & Associates, Inc.

Current Catalog - John S. Hyatt & Associates, Inc.

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1. Place the bases on the stage with the screw jacks completely off the floor. Connect 954mmhinge section to the top of each of the base. Take care to align the hinge so that it openstoward the truss.2. Lift a sleeve block and slide it down over each hinge section so that the wheels are on thestage around the base. In the case of Super-truss please refer to the "Super-truss userinstructions".Figure showing the tower truss assembledand lying on the Lighting truss ready to befitted with the Tower erecting arm andrigging rope.3. Lay out and connect the entire lighting truss to the desired shape incorporating the sleeveblocks with bases as previously assembled.4. Position the rig on the stage and place 3/4" (19mm) plywood under each base.5. Assemble remaining tower sections and the roller beams to desired height. Be sure thediagonals are on the same side and form a continuous pattern.FigureShowingtowerliftingsystem6.Lay the assembled tower on top of the lighting truss, resting the head block ona plywood pad (across the top of the lighting truss). Connect upper portion ofthe tower to the hingeusergst2-4 of 8-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!