12.07.2015 Views

01.10.2010 Corporate presentation - TAURON Polska Energia

01.10.2010 Corporate presentation - TAURON Polska Energia

01.10.2010 Corporate presentation - TAURON Polska Energia

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Generation—asset portfolioLocationSelected technical characteristics 1<strong>TAURON</strong> is Poland’s 2nd largest electricity generator with its generation assets located in the south of PolandPower Plant Blocks CODModernisation/ generaloverhaul datePlannedDecomm.DateAvailable Capacity(electr., heat)MWe / MWtNet Production(electr., heat)TWh / PJEfficiency%AvailabilityFactor%CO2 EmissionsMg CO2 / MWhComments on environmentalinstallationsPower Plants12345Block 2 & 3Jaworzno IICollector1999 - / 06-07 203940%1954 - / 2000 20131,535 372 6.32 1.3133%Jaworzno III Blocks 1-6 1977-78 97-01 / 98-09 2029-31Blocks 1-2ŁaziskaBlocks 9-12Blocks 1-2Łagisza Blocks 5-7Block 10Blocks 1-2SierszaBlocks 3-619671970-7294-95 / 05-0696-99 / 04-091963-64 91-94 / 01-021969-70 92-93 / 06-082009- / -2001-02 - / 20091969-70 91-94 / 00-0580% 0.805100% 0.85937-38% 87% 0.910201836% 89%1,145 196 4.64 0.332027-2838% 86%201335% 77%2016-18 1,060 335 2.34 1.34 34-36%after 204344%2042-4339%677 37 1.70 0.08201634%83%48%70-76%93%Halemba Collector 1963 - 2012 100 58 0.22 0.20 33% 83% 1.1520.9210.8630.9390.9660.7790.8390.9632731095 142118Notes:1 Definitions: decommissioning date: date on which<strong>TAURON</strong> plans to decommission the asset based on theenvironmental regulations currently in force; availabilityfactor: working hours / available hours (average for theblocks shown); last modernization / general overhaul date:the year in which such activity was conducted with the aim tomaintain the availability of the plant2 Refers to block 5 only3 Refers to boilers 8 and 9 only4 Refers to water boilers only667891011Stalowa WolaBlocks 1-2Collector19651956- / 05-08- / 20082016-222045341 366 0.97 1.68Blachownia Collector 1957-58 - / 2008 2016 158 174 0.44 0.96 43% 87% 0.596Combined Heat and Power Plants(CHPs)Bielsko BiałaEC-1EC-219701997- / 2008- / 200420132041132 447 0.41 2.29Katowice 2000 - 2041 135 459 0.71 2.46 68% 88% 0.723EC Nowa 1976-87 2006 / 2009 2027-2037 125 466 0.31 2.24 46% 85% 1.693EC Tychy 2000 - / 2009 2035 40 290 0.14 1.83 54% 73% 0.899Total5,448 3,199 18.2 14.7434-38%• Upon EU accession Poland was granted transition periods to adopt to LCP Directiveenvironmental standards• Several <strong>TAURON</strong> plants installations were exempt from emission requirements for– SO 2 (until 31 Dec 2015): 3 Łagisza boilers, 6 Stalowa Wola boilers– NO x (until 31 Dec 2017): 6 Jaworzno boilers, 6 Łaziska boilers, 2 Łagiszaboilers and 6 EC Nowa boilers57%65%57%96%99%96%88%0.9010.4670.8430.747Units in transition period to achievecompliance with emission standards for:SO 2 NO xNo installations - units undernatural derogationsContains centrally dispatched units3431

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!