<strong>CSP</strong> Build Costs= 2.4B ZAR/64 MW= 3.75B ZAR/100 MW= 3.9B ZAR/50 MW= 7.8B ZAR/100 MW= 0.6B ZAR/11 MW= 5.1B ZAR/100 MWSource: renac 20097 ERC