Download PDF - Kinross Gold
Download PDF - Kinross Gold
Download PDF - Kinross Gold
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
FOCUS ON OPERATIONAL FUNDAMENTALSWEST AFRICA• Region on track to meet both production and production cost of salesguidance for 2013Tasiast• Tasiast achieved highest quarterly production level since acquisition forthe 2 nd consecutive quarter• Higher grades feeding the mill• Improved performance at the dump leach and ADR plantWEST AFRICA2013E (1) : 415-480koz.at $890-950/oz.• Slight decrease in production at Chirano as a result of expected lower grades• Acting on an opportunity identified as part of the <strong>Kinross</strong> Way Forward, Chiranosuccessfully completed transition to self-perform mining in the open pitsChiranoOPERATIONGOLD EQUIVALENTPRODUCTION (2) PRODUCTION COST OF SALES (3)($/oz.)Q2 2013 H1 2013 Q2 2013 H1 2013Tasiast 71,047 133,804 $1,066 $969Chirano (90%) 56,290 116,707 $830 $776WEST AFRICA TOTAL 127,337 250,511 $956 $878www.kinross.com(1) Refer to endnote #1.(2) Refer to endnote #2.(3) Refer to endnote #3.19 19