30.11.2012 Views

1 CITY OF TRAVELERS REST COMPREHENSIVE PLAN ...

1 CITY OF TRAVELERS REST COMPREHENSIVE PLAN ...

1 CITY OF TRAVELERS REST COMPREHENSIVE PLAN ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Goal 4: Ensure the reliable provision of public utilities to the citizens of Travelers Rest<br />

Strategies Time Frame Participants<br />

1. Begin discussions with Piedmont 2006 TRCC, Piedmont Natural<br />

Natural Gas. Get public gas piped<br />

throughout the city<br />

Gas<br />

2. Review the recommendations of<br />

the sewer rehabilitation report for<br />

Travelers Rest conducted by Camp<br />

Dresser & McKee and implement<br />

those deemed the most necessary and<br />

feasible.<br />

Ongoing TRCC, WCSA<br />

3. Increase the number of water<br />

pumping stations within the city<br />

limits<br />

Long-term Greenville Water<br />

Goal 5: Increase recreational opportunities in the city<br />

Strategies Time Frame Participants<br />

1. Construct more parks and ball<br />

fields, and indoor sporting facilities<br />

2008 TRCC<br />

2. Construct more bicycle and<br />

walking trails<br />

2008 TRCC<br />

Goal 6: Replace or improve deficient or inadequate lighting<br />

Strategies Time Frame Participants<br />

1. Set up a lighting program to<br />

address deficient lighting in areas<br />

where public safety is an issue<br />

2006 TRCC<br />

2. Replace above ground power lines<br />

with underground lines<br />

Ongoing TRCC<br />

3. Place period lighting along State<br />

Park Road, Poinsett Highway, and the<br />

CBD along Main Street<br />

2006-2008 TRCC<br />

6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!