2006 Edition (23 rd April 2007) - R
- Page 3 and 4:
Code of Practice for Traffic Contro
- Page 5:
Chapter 1Introduction1-1 Scope 21-2
- Page 8 and 9:
- 4 -devices placed temporarily on
- Page 11 and 12:
- 7 -2-10 Vehicles and Equipment Sa
- Page 13 and 14:
- 9 -Planning FlowchartSTEP 1Assemb
- Page 15 and 16:
- 11 -3-4.2 Work duration refers to
- Page 17 and 18:
Design Parameter- 13 -Geometric Des
- Page 19 and 20:
- 15 -Table 3.6: Typical Lane Closu
- Page 21 and 22:
- 17 -Figure 3.2 Components of an A
- Page 23 and 24:
- 19 -Fig. 3.4 : Typical cross-sect
- Page 25 and 26:
- 21 -Examples of the taper length
- Page 27 and 28:
- 23 -Fig. 3. 9b : Taper curve for
- Page 29:
- 25 -Fig. 3.10a Taper for extended
- Page 34 and 35:
- 30 -Termination ZoneActivity Zone
- Page 37 and 38:
- 33 -Summary of Design Considerati
- Page 39 and 40:
- 35 -Summary of Design ProcedureDe
- Page 41 and 42:
- 37 -Examples of Mandatory Signs20
- Page 43:
- 39 -4-4 Temporary Warning Signs4-
- Page 47 and 48:
- 43 -4.8 Sign Mounting & Covering4
- Page 49 and 50:
- 45 -4-9 Delineation and Channelli
- Page 51 and 52:
- 47 -4-12.3 Water-filled barricade
- Page 53 and 54:
- 49 -4-14 Barricades4-14.1 Barrica
- Page 55 and 56:
- 51 -SummaryBarricadesTypePlastic
- Page 57 and 58:
Non-proprietary barriers are safety
- Page 59 and 60:
(5) The device used on roads withsp
- Page 61 and 62:
- 57 -4-22.3 Flashing beacons shall
- Page 63 and 64:
- 59 -4-27 Manual Operated Stop/Go
- Page 65 and 66:
- 61 -Chapter 5Implementation,Opera
- Page 67 and 68:
- 63 -5-3 Operation Procedure5-3.1
- Page 69 and 70:
- 65 -(4) Demerit Point SystemThe p
- Page 71 and 72:
- 67 -(2) Remove the devices accord
- Page 73 and 74:
- 69 -APPENDIX I - Acts & Regulatio
- Page 75 and 76:
- 71 -iii)iv)No traffic signs shall
- Page 77 and 78:
- 73 -iii)iv)The Authority may give
- Page 79 and 80:
- 75 -APPENDIX II - SpecificationsP
- Page 81 and 82:
- 77 -The background colours of the
- Page 83 and 84:
- 79 -Table 5 : Climate Types for u
- Page 85 and 86:
- 81 -5.3.3 For rotationally non-un
- Page 87 and 88:
- 83 -Nighttime Color of Fluorescen
- Page 89 and 90:
- 85 -7.1 Field performance require
- Page 91 and 92:
- 87 -Table 13 : Lists of Tests Rep
- Page 93 and 94:
- 89 -4.2 Thinner specially designe
- Page 95 and 96:
- 91 -Specification for Aluminium S
- Page 97 and 98:
- 93 -Specification for Traffic Con
- Page 99 and 100:
- 95 -Drawing showing Dimensions an
- Page 101 and 102:
- 97 -Recommended Support for Sign
- Page 103 and 104:
- 99 -Recommended Support for Later
- Page 105 and 106:
- 101 -3. Assembly.The collision at
- Page 107 and 108:
- 103 -(d)Placing the devicesWhen t
- Page 109 and 110:
- 105 -Specification for High Visib
- Page 111 and 112:
- 107 -Table 17 : Photometric and P
- Page 113 and 114:
- 109 -35) Sign I 7 (No Lane Markin
- Page 115 and 116:
- 111 -Sign W 1: CautionbarSign W1C
- Page 117 and 118:
- 113 -Sign W 3 to 13: Works Ahead
- Page 119 and 120: Sign W 15: Man-at-Work- 115 -cbarSi
- Page 121 and 122: - 117 -Sign W 17: Road Narrow on Bo
- Page 123 and 124: - 119 -Sign W 19: Left Lane Closed
- Page 125 and 126: - 121 -Sign W 21: Right Lane Closed
- Page 127 and 128: - 123 -Sign W 23: Right Bend Aheadr
- Page 129 and 130: - 125 -Sign W 25: Series of Bend Ah
- Page 131 and 132: - 127 -Sign W 27: Traffic Lights Ah
- Page 133 and 134: - 129 -Sign W 29: Work Access Ahead
- Page 135 and 136: Sign W 31: Merge Ahead- 131 -c60°d
- Page 137 and 138: - 133 -Sign W 33: Centre Lane Merge
- Page 139 and 140: - 135 -Sign W 35: Distance Suppleme
- Page 141 and 142: - 137 -Sign W 37: SlowbarSign W37Sl
- Page 143 and 144: - 139 -Sign I 2: Project Informatio
- Page 145 and 146: - 141 -Sign I 4: Coming Your Wayb(O
- Page 147 and 148: - 143 -Sign I 6: Count Down on Impl
- Page 149 and 150: - 145 -Sign I 8: Temporary Traffic
- Page 151 and 152: - 147 -Sign I 10: Start of Work Zon
- Page 153 and 154: - 149 -Sign I 12: Start of Work Zon
- Page 155 and 156: - 151 -Sign I 14: Start of Work Zon
- Page 157 and 158: - 153 -Sign I 16: Start of Work Zon
- Page 159 and 160: - 155 -Sign I 18: Road Closedea(Org
- Page 161 and 162: - 157 -Sign I 20: Beam Launchinga(O
- Page 163 and 164: - 159 -Traffic arrangement for sing
- Page 165 and 166: - 161 -Traffic arrangement for work
- Page 167 and 168: - 163 -Traffic arrangement for work
- Page 172 and 173: - 168 -Traffic arrangement for road
- Page 174 and 175: - 170 -Traffic arrangement for work
- Page 176 and 177: - 172 -Traffic arrangement for sing