12.07.2015 Views

EC/ECS

EC/ECS

EC/ECS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

26Analysentechnik mit System15 CHANGING THE COOLER AGGREGATENOTE!Before removing the cooler aggregate disconnect the cooler from all powersupplies;Before mounting the new aggregate check, if voltage corresponds with thespecification on the type plate;changing the cooler aggregate may only be carried out by qualified personnel!According to the cooler version, forced ventilated or not, cooler aggregates with differing quantity ofrefrigerant are available (spare parts list). As a spare part we deliver a complete replacement cooleraggregate (230V- or 115V), including the compressor, vaporizer, condenser, dryer and the capillarytube with the packaged refrigerant (230V R290, 115V R404A). You send us your defective, nondamaged, complete cooler aggregate in a corresponding safe packing carton taking over the costs ofshipping.Figure 11 shows the positioning of the cooler aggregate within the cooler casing.Front viewTop view1 fastening screw cooler aggregate2 fastening screw vaporizer3 terminal for earth cable4 vaporizer5 compressor6 valve for feeding with refrigerant7 condenser8 dryer9 capillary tubeFigure 11<strong>EC</strong> cooler aggregateOperating Instructions 3-4.1-ME 9501 - Electric Gas Cooler <strong>EC</strong>/<strong>EC</strong>SSubject to technical modifications.© M&C May 2002 Reproduction of this document or its content is not allowed without permission from M&C.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!