- Page 1 and 2: Arahan Teknik (Jalan) 16/03; (Pinda
- Page 3 and 4: PREFACEIn line with the MS: ISO 140
- Page 5 and 6: (30) En. Mohd. Fauzie b. Ismail PP,
- Page 7: CHAPTER 1INTRODUCTION1
- Page 12 and 13: CHAPTER 2:ENVIRONMENTAL REQUIREMENT
- Page 14 and 15: Figure 1: Flowchart for Preliminary
- Page 16 and 17: Figure 3: Flowchart for EIA Process
- Page 18 and 19: 2.2 Implementation/ Construction St
- Page 20 and 21: CHAPTER 3CONTRACTUAL REQUIREMENTS14
- Page 22 and 23: CHAPTER 4SPECIFICATIONS16
- Page 24 and 25: 4.3 Environmental Management Plan (
- Page 26 and 27: 4.4 Site Office and Facilities4.4.1
- Page 28 and 29: (iv) The Contractor should adopt wa
- Page 30 and 31: sufficiently graded, leveled, compa
- Page 32 and 33: 4.7.3 Air Quality(a)(b)(c)(d)(e)(f)
- Page 34 and 35: AspectsSoilTable 2: Environmental Q
- Page 36 and 37: 4.8 Preservation of Flora and Fauna
- Page 38 and 39: (II)MulchingMulch is a protective c
- Page 40 and 41: and need to be replaced immediately
- Page 42 and 43: CHAPTER 5:METHOD OF MEASUREMENTNon-
- Page 44 and 45: 5.3 Environmental Officer (E.O.)5.3
- Page 46 and 47: MeasurementThe measurement for paym
- Page 48 and 49: Pricing FactorThe item for provisio
- Page 50 and 51: (b)(c)(d)(e)Construction of wash tr
- Page 52 and 53: 5.6.2 Artificial Erosion Control It
- Page 54 and 55: 5.7.2 Sand bag barrier5.7.2 (i) Ins
- Page 56 and 57: 5.7.3 (ii) Sand BeddingUnitThe unit
- Page 58 and 59: MeasurementThe measurement for paym
- Page 60 and 61:
(a)(b)80% on complete construction
- Page 62 and 63:
Pricing FactorThe item for maintena
- Page 64 and 65:
MeasurementThe measurement for paym
- Page 66 and 67:
MeasurementThe measurement for paym
- Page 68 and 69:
(d)(e)(f)(g)(h)(i)(j)The types of g
- Page 70 and 71:
(d)(e)The position of terminations
- Page 72 and 73:
MeasurementThe measurement shall be
- Page 74 and 75:
5.12 Flora Management5.12.1 Flora S
- Page 76 and 77:
Pricing FactorThe item for construc
- Page 78 and 79:
PROJECT:ITEMNOBILL NO 10: ENVIRONME
- Page 80 and 81:
ITEMNODESCRIPTION OF WORKS UNIT QTY
- Page 82 and 83:
ITEMNODESCRIPTION OF WORKS UNIT QTY
- Page 84 and 85:
ITEMNODESCRIPTION OF WORKS UNIT QTY
- Page 86 and 87:
ITEMNODESCRIPTION OF WORKS UNIT QTY
- Page 88 and 89:
CHAPTER 7BEST MANAGEMENT PRACTICES8
- Page 90 and 91:
Sediment Basins OutletsSilt Marker
- Page 92 and 93:
TurfingZHydroseedingSources: Projek
- Page 94 and 95:
FLORA AND FAUNA MANAGEMENTEXAMPLES
- Page 96 and 97:
2. Examples of Air Quality Monitori
- Page 100 and 101:
Drawing 1: Containment Bund For Ski
- Page 102 and 103:
Drawing 3: Wash Trough For Construc
- Page 104 and 105:
Drawing 5: Silt Fence98
- Page 106 and 107:
Drawing 7: Scheduled Waste Storage
- Page 108 and 109:
JOINT TO SUITSITE CONDITIONWATER LE
- Page 110 and 111:
REFERENCES(1) Environmental Quality
- Page 112 and 113:
Hydroseeding/TurfingTaken from From
- Page 114 and 115:
(xi)(xii)The equipment and methods
- Page 116 and 117:
e made good by the Contractor at hi
- Page 118 and 119:
(Please insert this document into t
- Page 120 and 121:
GENERAL1.0 Scope of Works1.1 The wo
- Page 122 and 123:
(v)(vi)(vii)(viii)(x)(xi)(xii)Const
- Page 124 and 125:
7.1 Erosion and Sediment Control Pl
- Page 126 and 127:
APPENDIX 3STANDARD REPORT FORMAT FO
- Page 128 and 129:
4.0 Information on EMPThe type of E
- Page 130 and 131:
(ii)Proposed monitoring programmeMo
- Page 132 and 133:
18.0 FiguresThe following figures a
- Page 134 and 135:
REPORT: ENVIRONMENTAL MONITORING AN
- Page 136:
REPORT:CLOSURE AUDIT REPORT (CAR)TA