12.07.2015 Views

SA 3 134a - Sea Frost Refrigeration

SA 3 134a - Sea Frost Refrigeration

SA 3 134a - Sea Frost Refrigeration

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

VALVE UNITFor appearance and convenience of installation, the valve control unit (V/U) may mountoutside the icebox. The valve will attract moisture and drip if it is not well insulated withthe valve blanket and additional insulation. Insulate the valve after installation and leakchecking. In certain applications it may be necessary and easier to mount the valveinside the cabinet. Refer to schematic drawings when connecting more than one plate.Before cutting the tubing:1. Leave a minimum of one inch of tube beyond a bulkhead.2. Allow room for wrench access.- 90-degree elbows can be installed on the valve unit to reduce space requirements ifnecessary.- The tubing will support the valve unit.- The tubing must bottom in the fitting. Refer to the Swagelok assembly instructions.Working with one line at a time, remove the Swagelok caps from compressor andcondenser. Attach union fitting bodies. Make up 1/4 turn from wrench snug. (This is apre-Swaged connection.RECEIVER FILTER DRIER (RFD)LOCATION: The RFD is fitted with a sight glass in the top portion. Be sure that it canbe viewed when mounted in an upright position (the sight glass is on the top). The RFDmay be supported by the tubing or secured with a large tie wrap.Because the RFD contains desiccant to absorb moisture and the absorption islimited, it is important to unpack and install it after all other connections aremade. Leaving the RFD installed on a partially open system may reduce itscapacity by allowing it to absorb moisture in free air before the system is sealed.13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!