12.07.2015 Views

Tonic CS 1 - Stannah

Tonic CS 1 - Stannah

Tonic CS 1 - Stannah

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Hall Green Secondary School<strong>Stannah</strong> Lifts has carried out a major turnkey liftrefurbishment on behalf of Hall Green SecondarySchool, a co-educational Academy in Birminghamwith a reputation for inclusion.Located in Southam Road in south Birmingham, Hall Green Secondary Schoolhas 900 pupils, some of whom use wheelchairs. To keep everyone mobile andwith access to all the facilities ranged over two storeys, it was imperative toreplace and extend the existing lift systems which were out of date and unableto meet the needs of this vibrant, growing school.Scope of workThe <strong>Stannah</strong> Lifts team was responsible for removing and replacing theexisting four lifts with a Maxilift MRC passenger lift and three Midlift verticalplatform lifts. <strong>Stannah</strong> liaised with Hall Green Secondary School directly in thisturnkey project, managing the removal of existing lifts and builders work toenable the installation of new <strong>Stannah</strong> lifts, whilst working as the principalcontractor in compliance with CDM 2007. <strong>Stannah</strong> was responsible for all thebuilding work and, to minimise disruption to the school routine, all the liftswere installed during term breaks.£100,000turnkey lift refurbishment900pupils – plus staff and visitors3Midilift platform lifts1Maxilift passenger lift

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!