12.07.2015 Views

Quotation for undertaking the repairing & widening of roads at ...

Quotation for undertaking the repairing & widening of roads at ...

Quotation for undertaking the repairing & widening of roads at ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

jk"Vªh; eRL; vkuqoaf'kd lalk/ku C;wjksdSuky fjax jksM] rsyhckx] iks-vk- fnydq'kk] y[kuÅ & 226 002] m0iz0NATIONAL BUREAU OF FISH GENETIC RESOURCESCanal Ring Road, P.O. Dilkusha, Lucknow-226 002, U.P., IndiaF.No.: 6-36/2013-14/Repairing Road/ D<strong>at</strong>ed: 07.08.2013M/s………………..…………………….…………………….Subject: <strong>Quot<strong>at</strong>ion</strong> <strong>for</strong> <strong>undertaking</strong> <strong>the</strong> <strong>repairing</strong> & <strong>widening</strong> <strong>of</strong> <strong>roads</strong>regarding .Sir,<strong>at</strong> NBFGR campus-Please quote your lowest r<strong>at</strong>es <strong>for</strong> <strong>undertaking</strong> <strong>the</strong> <strong>repairing</strong> & <strong>widening</strong> <strong>of</strong> <strong>roads</strong> <strong>at</strong>NBFGR campus- regarding .The quot<strong>at</strong>ion should be submitted in sealed cover super scribed with <strong>the</strong> name <strong>of</strong> <strong>the</strong>work and closing d<strong>at</strong>e written on <strong>the</strong> envelope. The quot<strong>at</strong>ions should be dropped in <strong>the</strong>Tender/<strong>Quot<strong>at</strong>ion</strong> box kept in <strong>the</strong> Room No. A-210 <strong>of</strong> <strong>the</strong> Administr<strong>at</strong>ive Block on orbe<strong>for</strong>e <strong>the</strong> closing d<strong>at</strong>e – (29.08.2013 till 3.00 p.m.). In case <strong>the</strong>se are sent by post<strong>the</strong>se should be sent by Regd. Post/ Speed Post addressed to Administr<strong>at</strong>ive Officer,N<strong>at</strong>ional Bureau <strong>of</strong> Fish Genetic Resources, Lucknow- 226 002. You are to ensure th<strong>at</strong><strong>the</strong> quot<strong>at</strong>ion is posted well in advance so as to reach be<strong>for</strong>e <strong>the</strong> closing d<strong>at</strong>e indic<strong>at</strong>edabove.O<strong>the</strong>r Provisions-1. Dur<strong>at</strong>ion <strong>of</strong> rendering <strong>the</strong> work will be within 50 days from d<strong>at</strong>e <strong>of</strong> issue <strong>of</strong> awardletter/ acceptance <strong>of</strong> contract.2. All r<strong>at</strong>es quoted should be net in inclusive all taxes/duties/m<strong>at</strong>erial testing chargeetc. and written both in figures and words.3. No trade tax/ sales tax or any o<strong>the</strong>r <strong>for</strong>m will be issued by <strong>the</strong> department. Thecontractors quoted r<strong>at</strong>es shall include all taxes, Octroi, excise duty etc. as applicable andissued by St<strong>at</strong>e Govt./ Central Govt.4. You shall also work out <strong>the</strong> amount <strong>for</strong> each item <strong>of</strong> work and write in both figures andwords.5. Be<strong>for</strong>e quoting you are requested to inspect <strong>the</strong> site to fully acquaint yourself about <strong>the</strong>conditions with regard to accessibility <strong>of</strong> site, n<strong>at</strong>ure and extent <strong>of</strong> ground, workingcondition <strong>of</strong> site and locality including stocking <strong>of</strong> m<strong>at</strong>erials, install<strong>at</strong>ions <strong>of</strong> tools andplants (T&P) etc, conditions affecting accommod<strong>at</strong>ions and movement <strong>of</strong> labourer etc.required <strong>for</strong> <strong>the</strong> s<strong>at</strong>isfactory execution <strong>of</strong> <strong>the</strong> work contracted. No claim wh<strong>at</strong>soever onsuch account shall be entertained by <strong>the</strong> Director NBFGR in any circumstances.[1/8]


6. <strong>Quot<strong>at</strong>ion</strong> submitted should strictly comply with <strong>the</strong> following requirement:-(a) <strong>Quot<strong>at</strong>ion</strong> should be signed in ink and duly stamped.(b) Correction if any, in <strong>the</strong> entire documents should not be done by applying whitener(white correcting fluid) but by clear cutting and which must bear <strong>the</strong> initial <strong>of</strong> <strong>the</strong>sign<strong>at</strong>ory to <strong>the</strong> quot<strong>at</strong>ion.(c) If <strong>the</strong> quot<strong>at</strong>ion is submitted on behalf <strong>of</strong> <strong>the</strong> firm <strong>of</strong> partners <strong>of</strong> a limited concern itmust be signed ei<strong>the</strong>r by all partners or some person holding a valid power <strong>of</strong> <strong>at</strong>torneyfrom <strong>the</strong> partners constituting <strong>the</strong> firm. The person signing <strong>the</strong> quot<strong>at</strong>ion on behalf <strong>of</strong>partner or on behalf <strong>of</strong> firm, shall <strong>at</strong>tach with <strong>the</strong> quot<strong>at</strong>ion power <strong>of</strong> <strong>at</strong>torney orpartnership deed or memorandum <strong>of</strong> article as <strong>the</strong> case may be and bound such o<strong>the</strong>rperson or <strong>the</strong> firm as <strong>the</strong> case may be in all m<strong>at</strong>ters pertaining to <strong>the</strong> contract including<strong>the</strong> arbitr<strong>at</strong>ion clause. Even in case <strong>of</strong> firm which have already granted power <strong>of</strong> <strong>at</strong>torneyto an individual authorizing him to sign Tender/<strong>Quot<strong>at</strong>ion</strong> and contract documents onbehalf <strong>of</strong> <strong>the</strong> firm and in pursuance which Tender/<strong>Quot<strong>at</strong>ion</strong>s are being signed by suchpower as a routine a fresh power <strong>of</strong> <strong>at</strong>torney duly executed in his favour by all <strong>the</strong>partners <strong>of</strong> <strong>the</strong> firm st<strong>at</strong>ing specifically th<strong>at</strong> person have authority <strong>of</strong> binding suchpartners as <strong>the</strong> case may be, including condition rel<strong>at</strong>ing to arbitr<strong>at</strong>ion clause should besubmitted with <strong>the</strong> Tender/<strong>Quot<strong>at</strong>ion</strong>, unless such authority already been given to <strong>the</strong>person(s) concerned by <strong>the</strong> firm.© The registr<strong>at</strong>ion details <strong>of</strong> <strong>the</strong> firm as under may also be furnished failing <strong>the</strong> quot<strong>at</strong>ionis liable to be cancelled:-PAN No.TIN No.7. Attention is also invited th<strong>at</strong> conditional Tender/<strong>Quot<strong>at</strong>ion</strong>s are liable to be rejected. Assuch <strong>at</strong>tachment <strong>of</strong> own conditions is not congenial in case <strong>of</strong> competitiveTender/<strong>Quot<strong>at</strong>ion</strong>s. It is <strong>the</strong>re<strong>for</strong>e in<strong>for</strong>med th<strong>at</strong> your quote/Tender/<strong>Quot<strong>at</strong>ion</strong> should bebased solely on <strong>the</strong> conditions <strong>of</strong> <strong>the</strong> contract and o<strong>the</strong>r parts <strong>of</strong> <strong>the</strong> documents issued byDirector, NBFGR. Any quot<strong>at</strong>ion/Tender/<strong>Quot<strong>at</strong>ion</strong> which does not fulfill <strong>the</strong>se essentialrequirements shall be considered "NON BONAFIDE" and will not be considered <strong>for</strong>acceptance.8. An Earnest Money amounting to 12000- (Rs. Twelve thousand only) <strong>for</strong> o<strong>the</strong>rs &exemption <strong>for</strong> empanelled firm by NBFGR, in <strong>for</strong>m <strong>of</strong> demand draft in favor <strong>of</strong> ICARUnit, N<strong>at</strong>ional Bureau <strong>of</strong> Fish Genetic Resources, Lucknow is to be enclosed with <strong>the</strong>Tender/<strong>Quot<strong>at</strong>ion</strong>. If <strong>the</strong> quot<strong>at</strong>ion/Tender/<strong>Quot<strong>at</strong>ion</strong> is not accompanied by valid EarnestMoney (where required) in <strong>the</strong> prescribed <strong>for</strong>m, <strong>the</strong> Tender/<strong>Quot<strong>at</strong>ion</strong> shall be tre<strong>at</strong>ed asNON BONAFIDE and shall not be considered.9. The security deposit <strong>of</strong> 5% <strong>of</strong> estim<strong>at</strong>ed value by means <strong>of</strong> a demand draft in favor <strong>of</strong>ICAR Unit, N<strong>at</strong>ional Bureau <strong>of</strong> Fish Genetic Resources, Lucknow will have to bedeposited by <strong>the</strong> selected contractor be<strong>for</strong>e commencement <strong>of</strong> work. The security moneywill be <strong>for</strong>feited in case <strong>of</strong> default in fulfilling any <strong>of</strong> <strong>the</strong> conditions <strong>at</strong> <strong>the</strong> discretion <strong>of</strong><strong>the</strong> Director, N<strong>at</strong>ional Bureau <strong>of</strong> Fish Genetic Resources, Lucknow.10. The security money will be refunded after three (6) months <strong>of</strong> completion <strong>of</strong> <strong>the</strong> contractwithout any interest.11. Tender/<strong>Quot<strong>at</strong>ion</strong> submitted shall remain valid <strong>for</strong> 30 days from <strong>the</strong> d<strong>at</strong>e <strong>of</strong> opening <strong>for</strong>purpose <strong>of</strong> acceptance and award <strong>of</strong> work, validity beyond 30 days from <strong>the</strong> d<strong>at</strong>e <strong>of</strong>opening shall be by mutual consent.[2/8]


12. Payments: One payment according to <strong>the</strong> measurement & s<strong>at</strong>isfactory completion <strong>of</strong> <strong>the</strong>work. By e-payment.Minimum value <strong>of</strong> work <strong>for</strong> <strong>the</strong> intermedi<strong>at</strong>e certific<strong>at</strong>e:Compens<strong>at</strong>ion: In case <strong>of</strong> failure to provide services efficiently as percontract, <strong>the</strong> contractor shall pay/ authorize <strong>the</strong> Director NBFGR todeduct <strong>the</strong> sum equivalent to <strong>the</strong> actual expenditure incurred/ shouldhave incurred on job not done or not properly done, plus 10% asliquid<strong>at</strong>ed damages, from any payment due to <strong>the</strong> contract.13. TDS and st<strong>at</strong>utory taxes will be deducted as applicable.14. In addition to <strong>the</strong> above you are requested to return <strong>the</strong> Annexure A containing <strong>the</strong>General Conditions and Special Conditions duly accepted along with <strong>the</strong> AnnexureB-I & B-II Financial Quote.15. Director, NBFGR reserves <strong>the</strong> right to relax any conditions <strong>of</strong> <strong>the</strong> Tender/ <strong>Quot<strong>at</strong>ion</strong> ORaccepts OR reject any OR all <strong>the</strong> Tender/<strong>Quot<strong>at</strong>ion</strong>s without assigning any reason.16. As also Director NBFGR reserves <strong>the</strong> right <strong>of</strong> accepting <strong>the</strong> whole or any part <strong>of</strong> <strong>the</strong>Tender/<strong>Quot<strong>at</strong>ion</strong> and you shall be bound <strong>of</strong> per<strong>for</strong>m <strong>the</strong> same <strong>at</strong> <strong>the</strong> r<strong>at</strong>es quoted.Note: Without empanelled contractors cam be apply. If who have experience threesimilar type works (Pro<strong>of</strong> will be provided with quot<strong>at</strong>ion).Yours faithfully,(Abhishek Rana)Administr<strong>at</strong>ive Officer[3/8]


GENERAL CONDITIONSN<strong>at</strong>ional Bureau <strong>of</strong> Fish Genetic ResourcesCanal Ring Road, Telibagh, P.O.DilkushaLucknow 226002Annexure- A(To be returned duly accepted and signed)1. The services envisaged under <strong>the</strong> present contract shall be rendered by <strong>the</strong> contractor under<strong>the</strong> continuous monitoring and supervision <strong>of</strong> one or more specifically design<strong>at</strong>ed <strong>of</strong>ficials <strong>of</strong>N<strong>at</strong>ional Bureau <strong>of</strong> Fish Genetic Resources, Lucknow.2. The decision <strong>of</strong> <strong>the</strong> Director, N<strong>at</strong>ional Bureau <strong>of</strong> Fish Genetic Resources, Lucknow on <strong>the</strong>workmanship shall be final and binding in <strong>the</strong> contractor.3. The Director, N<strong>at</strong>ional Bureau <strong>of</strong> Fish Genetic Resources, Lucknow reserves to himself <strong>the</strong>right <strong>of</strong> altering <strong>the</strong> schedule <strong>of</strong> work and <strong>of</strong> adding to or omitting any items <strong>of</strong> work or havingportions <strong>of</strong> <strong>the</strong> same carried out departmentally <strong>of</strong> o<strong>the</strong>rwise and such alter<strong>at</strong>ions <strong>of</strong> vari<strong>at</strong>ionsshall not viti<strong>at</strong>e this contract.4. Efficiency is <strong>the</strong> essence <strong>of</strong> this contract. The contractor undertakes to provide <strong>the</strong> servicesset out above efficiently and maintain <strong>the</strong> standard <strong>of</strong> workmanship required from him under <strong>the</strong>contract. In case <strong>of</strong> failure to provide such services <strong>the</strong> contractor shall pay/ authorizes <strong>the</strong>Director NBFGR to deduct <strong>the</strong> sum equivalent to <strong>the</strong> actual expenditure which should haveuncured on job not-done or not properly done plus 10% as liquid<strong>at</strong>ed damages, from anypayment due to <strong>the</strong> contractor.5. The contractor shall be wholly responsible <strong>for</strong> any loss damages to <strong>the</strong> properties belongingto N<strong>at</strong>ional Bureau <strong>of</strong> Fish Genetic Resources, Lucknow caused by <strong>the</strong> contractor or by hisemployees and will pay to <strong>the</strong> Director, NBFGR or allow <strong>the</strong> amount <strong>of</strong> loss sustained by <strong>the</strong>Director, NBFGR to be deducted from any sum found due to <strong>the</strong> contractor.6. No o<strong>the</strong>r costs, charges, wages dues and compens<strong>at</strong>ion wh<strong>at</strong>soever to staff, employees oro<strong>the</strong>r persons engaged by <strong>the</strong> contractor shall be payable by N<strong>at</strong>ional Bureau <strong>of</strong> Fish GeneticResources, Lucknow or shall be claimed by <strong>the</strong> contractor from N<strong>at</strong>ional Bureau <strong>of</strong> Fish GeneticResources Lucknow <strong>for</strong> <strong>the</strong> services required to be rendered by <strong>the</strong> contractor over and above <strong>the</strong>said contractual payment.7. The contractor will present <strong>the</strong> bill which will be verified and certified <strong>for</strong> <strong>the</strong> payment by<strong>the</strong> <strong>of</strong>ficer(s) nomin<strong>at</strong>ed by Director as in clause no. 1 <strong>of</strong> general condition and payment <strong>of</strong> <strong>the</strong>bill shall be made within 15 days <strong>of</strong> <strong>the</strong> receipt <strong>of</strong> completed bills.8. In case <strong>of</strong> delay in <strong>at</strong>tributable to <strong>the</strong> contracting firm/contractor a penalty <strong>of</strong> 0.25% perweek or part <strong>the</strong>re<strong>of</strong> shall be leviable.Sign<strong>at</strong>ure <strong>of</strong> contractor with Seal & D<strong>at</strong>e[4/8]


SPECIAL CONDITION1. All <strong>the</strong> m<strong>at</strong>erials used <strong>for</strong> <strong>the</strong> work shall be <strong>of</strong> approved quality and as per CPWDspecific<strong>at</strong>ions and N<strong>at</strong>ional Bureau <strong>of</strong> Fish Genetic Resources. Lucknow reserves <strong>the</strong> right tocheck <strong>the</strong> m<strong>at</strong>erials brought <strong>for</strong> <strong>the</strong> work <strong>at</strong> any time and reject <strong>the</strong>m if not found suitable.2. The staff employed by <strong>the</strong> contractor <strong>for</strong> rendering <strong>the</strong> services as contracted will be <strong>the</strong>employees <strong>of</strong> <strong>the</strong> contractor and will be <strong>of</strong> his pay rolls and <strong>the</strong>y shall receive instructions from<strong>the</strong> contractor <strong>for</strong> <strong>the</strong>ir duties to be carried out by <strong>the</strong>m and <strong>for</strong> effective discharge <strong>of</strong> <strong>the</strong>a<strong>for</strong>esaid duties N<strong>at</strong>ional Bureau <strong>of</strong> Fish Genetic Resources. Lucknow will in no way beresponsible <strong>for</strong> <strong>the</strong>se labourers deployed by <strong>the</strong> contractor.3. The contractor shall comply with <strong>the</strong> provisions <strong>of</strong> all labour laws including employeesSt<strong>at</strong>e Insurance Act, Workmen's Compens<strong>at</strong>ion Act, payment <strong>of</strong> Minimum Wages Act, 1948.Employees P.F. Act, and timely payment <strong>of</strong> all <strong>the</strong>ir dues in respect <strong>of</strong> <strong>the</strong> employees engaged byhim <strong>for</strong> rendering <strong>the</strong> a<strong>for</strong>esaid services and shall keep N<strong>at</strong>ional Bureau <strong>of</strong> Fish GeneticResources. Lucknow absolved from all acts and omissions, faults breaches and/ or claims,demands, loss, injury and expenses, to which N<strong>at</strong>ional Bureau <strong>of</strong> Fish Genetic Resources.Lucknow may be put <strong>of</strong> or involved as a result <strong>of</strong> contractor’s failure to fulfill any <strong>of</strong> <strong>the</strong> aboveoblig<strong>at</strong>ions and N<strong>at</strong>ional Bureau <strong>of</strong> Fish Genetic Resources. Lucknow shall be entitled to recoverany such losses or expenses which it may have to suffer on account <strong>of</strong> such claims, demands,loss or injury, from <strong>the</strong> contractor's monthly bill or from security deposit or from any money dueto contractor without prejudice to its any o<strong>the</strong>r rights under <strong>the</strong> law.4. The Security Money deposited by <strong>the</strong> contractor may be <strong>for</strong>feited in <strong>the</strong> event <strong>of</strong>contractor's failure to fulfill any <strong>of</strong> <strong>the</strong> oblig<strong>at</strong>ions under <strong>the</strong> agreement and unless so <strong>for</strong>feited itshall be refunded to contractor on <strong>the</strong> expir<strong>at</strong>ion <strong>of</strong> 3 months <strong>of</strong> completion <strong>of</strong> <strong>the</strong> work or earlierdetermin<strong>at</strong>ion <strong>of</strong> agreement. The Security Money shall not carry any interest wh<strong>at</strong>soever. AllSt<strong>at</strong>uary deductions as applicable shall be deducted <strong>at</strong> source from <strong>the</strong> contractor's bill.5. Th<strong>at</strong> except as provided above, all disputes and questions arising out <strong>of</strong> this agreementwhe<strong>the</strong>r during <strong>the</strong> currency <strong>of</strong> contract <strong>of</strong> <strong>the</strong>reafter shall be referred to <strong>the</strong> Sole Arbitr<strong>at</strong>ion <strong>of</strong>Secretary ICAR or any o<strong>the</strong>r person appointed by him and <strong>the</strong> decision <strong>of</strong> <strong>the</strong> Arbitr<strong>at</strong>or shall befinal, conclusive and binding <strong>of</strong> <strong>the</strong> parties to this contract.6. WORK CAN BE INCREASED OR DECREASED TO ANY EXTENTGeneral conditions and special conditions accepted- Sign<strong>at</strong>ure- Name <strong>of</strong> <strong>the</strong> firm- D<strong>at</strong>e- Seal[5/8]


O<strong>the</strong>r conditions1. The work required to be completed under said Tender/<strong>Quot<strong>at</strong>ion</strong> is all as described aboveand all as specified in particular specific<strong>at</strong>ion.2. The quantities as shown in column No 5 are approxim<strong>at</strong>e and are inserted <strong>for</strong> guidanceonly.3. The Tenderers are required to fill <strong>the</strong>ir r<strong>at</strong>es in column No. 6 in words and figures andextend <strong>the</strong> amount in column No. 7.4. Total in Column no 7 is not firm but will be tre<strong>at</strong>ed as contract sum.5. Measurements <strong>of</strong> work done shall be as per items and units as in <strong>the</strong> <strong>for</strong>m B.6. Unless o<strong>the</strong>rwise specified r<strong>at</strong>es quoted by <strong>the</strong> contractor shall include <strong>for</strong> all incidentaland additional labour and m<strong>at</strong>erials to cover all <strong>the</strong> works enumer<strong>at</strong>ed and describedunder <strong>the</strong> heading ‘Item <strong>of</strong> work.’ It is an express condition <strong>of</strong> this Tender/<strong>Quot<strong>at</strong>ion</strong> th<strong>at</strong><strong>the</strong> r<strong>at</strong>es quoted by <strong>the</strong> contractor in <strong>the</strong> Tender/<strong>Quot<strong>at</strong>ion</strong> <strong>for</strong> various items <strong>of</strong> work shallbe deemed to include <strong>for</strong> full, entire and final completion <strong>of</strong> items <strong>of</strong> work in accordancewith <strong>the</strong> provisions <strong>of</strong> <strong>the</strong> Tender/<strong>Quot<strong>at</strong>ion</strong>. The NBFGR will not entertain any claimwh<strong>at</strong>soever on account <strong>of</strong> inaccuracy, misunderstanding if any in <strong>the</strong> a<strong>for</strong>esaid r<strong>at</strong>es.7. Unit r<strong>at</strong>es quoted by <strong>the</strong> contractor will be deemed to include <strong>for</strong> minor accessories,which are not specially, mentioned in <strong>the</strong> document or given in particular specific<strong>at</strong>ion <strong>of</strong><strong>the</strong> execution <strong>of</strong> work/services in <strong>the</strong> workman like manner and sound engineeringpractice. In case <strong>of</strong> difference <strong>of</strong> opinion <strong>the</strong> decision <strong>of</strong> Director NBFGR shall be finaland binding.8. The entire work under this contract shall be completed within a period <strong>of</strong> 50 days from<strong>the</strong> d<strong>at</strong>e <strong>of</strong> handing over <strong>the</strong> site.9. Unless o<strong>the</strong>rwise specified r<strong>at</strong>es per unit <strong>for</strong> items in this schedule include <strong>for</strong> m<strong>at</strong>erialand labour and/or supplying and fixing/laying complete.10. The r<strong>at</strong>es quoted by <strong>the</strong> Tenderers shall not be corrected by fluid/whitener; it shall be cutand initialed wherever required.11. No trade tax/ sales tax or any o<strong>the</strong>r <strong>for</strong>m will be issued by <strong>the</strong> department. Thecontractors quoted r<strong>at</strong>es shall include all taxes, Octroi, excise duty etc. as applicable andissued by St<strong>at</strong>e Govt./ Central Govt.Sign<strong>at</strong>ure <strong>of</strong> contractor with Seal & D<strong>at</strong>e[6/8]


Sl No. DSR(2012)No.1. 5.9Annexure BRepairing and Widening Campus Road <strong>for</strong>m guest house to septic tank and mazar to lab block5.9.1Particulars Unit Qtty. R<strong>at</strong>ePerunitCentering and shuttering including strutting, propping etc. and removal<strong>of</strong> <strong>for</strong>m <strong>for</strong>:Found<strong>at</strong>ions, footings, bases <strong>of</strong> columns etc <strong>for</strong> mass concrete. sqm 1062. 4.1 Providing and laying in position cement concrete <strong>of</strong> specified gradeexcluding <strong>the</strong> cost <strong>of</strong> centering and shuttering –all work up to plinthlevel.4.1.10 1:5:10 (1 cement : 5coarse sand : 10graded stone aggreg<strong>at</strong>e 40 mm cum 65nominal size shankargarh)3. 15.24 Demolishing dry brick pitching in floors, drains etc. including stackingserviceable m<strong>at</strong>erial and disposal <strong>of</strong> unserviceable m<strong>at</strong>erial within 50metres lead: cum 344. 16.1 Prepar<strong>at</strong>ion and consolid<strong>at</strong>ion <strong>of</strong> sub grade with power road roller <strong>of</strong> 8 to12 tonne capacity after excav<strong>at</strong>ing earth to an average <strong>of</strong> 22.5 cm. depth,dressing to camber and consolid<strong>at</strong>ing with road roller including makinggood <strong>the</strong> undul<strong>at</strong>ions etc. and re-rolling <strong>the</strong> sub grade and disposal <strong>of</strong>surplus earth lead upto 50 metres. sqm 4305. 16.42 Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stoneaggreg<strong>at</strong>e 20 mm nominal size) Ready mix concrete inpavements, laid to required slope and camber in panels asrequired including consolid<strong>at</strong>ion finishing and tamping complete.Finally finished by flo<strong>at</strong>ing, straight line brooming.6. Providing and fixing in position cement base particle board (bisionboard) including cutting in expansion joints as per engineering incharge1. 15.43 Dismantling manually/by mechanical means including stacking <strong>of</strong>serviceable m<strong>at</strong>erial and disposal <strong>of</strong> unserviceable m<strong>at</strong>erial within 50meters lead as per direction <strong>of</strong> Engineer-in-charge:15.43.1 W<strong>at</strong>er bound macadam road15.43.2 bituminous roadTotalcum 43145Per10 cmdepth per1cm widthper 1 mlengthSqmSqm1.51.0AmountSign<strong>at</strong>ure <strong>of</strong> contractor with Seal & D<strong>at</strong>e[7/8]

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!