12.07.2015 Views

Development Framework For Pinewood Studios Introduction to the ...

Development Framework For Pinewood Studios Introduction to the ...

Development Framework For Pinewood Studios Introduction to the ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Development</strong> <strong>Framework</strong><strong>For</strong> <strong>Pinewood</strong> <strong>Studios</strong>The future of <strong>Pinewood</strong>Possible future development<strong>Development</strong> <strong>Framework</strong> and potential phasingThe <strong>Pinewood</strong> team, advised by Amion Consultingand CBRE, are assessing market drivers, a businessplan and property requirement issues over <strong>the</strong>next 15 – 20 years in connection with <strong>Pinewood</strong>’sneeds for strategic growth. A ‘do nothing’ scenariois also being thoroughly tested, and initial resultssuggest that this would lead <strong>to</strong> decline, which,when contrasted with <strong>the</strong> growth of overseascompetition, could result in <strong>the</strong> loss of <strong>the</strong> UK’spre-eminence in this field. Currently <strong>the</strong> studiesare at a preliminary stage. It is intended <strong>to</strong> sharea synopsis of <strong>the</strong> findings of <strong>the</strong> full tests in duecourse.The diagrammatic plan <strong>to</strong> <strong>the</strong> right shows <strong>the</strong>existing <strong>Pinewood</strong> site and <strong>the</strong> adjacent site,shown <strong>to</strong>ge<strong>the</strong>r with <strong>the</strong> preliminary thoughtson <strong>the</strong> broad scale of floor plate need for stages,workshops and offices (<strong>the</strong> latter of which willalso need <strong>to</strong> include allowances for ancillaryaccommodation such as dressing rooms andwardrobe areas) arranged in three broad phases asshown. It should be borne in mind that <strong>the</strong>se maychange in response <strong>to</strong> <strong>the</strong> findings of <strong>the</strong> studiesand consultation with business, <strong>the</strong> communityand public authorities.Three phases of developmentdelivered over a 20 year period.(Floor areas belowshown <strong>to</strong>same scale as <strong>the</strong> site )Phase 1Phase 2Phase 1- 3 new stages on <strong>the</strong> existing site- Car park on existing site- On and off-site works for <strong>the</strong> new site- 4 new stages on new site- Ancillary production accommodation for stages ona 1:1 ratio[NB: assumes existing consents are developed aspart of <strong>the</strong> phase 1 period –stage on South Dock andancillary space along with Media Park on <strong>the</strong> frontagesite]Phase 3Phase 2Key- 3 new stages on new site- Ancillary production accommodation for stages ona 1:1 ratio- Media Park office and ancillary accommodationNew stagesNew workshopsPhase 3- 3 new stages on new site- Media Park office and ancillary accommodationNew office /ancillary space

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!