Sindh Board of Investment<strong>Pre</strong>-<strong>Feasibility</strong> <strong>Study</strong> - <strong>Guava</strong>ANNEX B<strong>Guava</strong> Utility Equipment ListDescriptionBoiler (4 tons/hr, 150 psi)Air CompressorWater ChillerGenerator (250 KVA)Cooling TowerC.I.P SystemWater TreatmentFork Lifter (2.5 tons)Deep well (0.5 cusec)Weigh Bridge (60 ton)Electric connectionElectrical wiringTransformerEffluent treatmentWaste hopperCentrifugal pumps and pipes for waterFuel gas connection13