12.07.2015 Views

chainsaw milling and lumber trade in west africa project

chainsaw milling and lumber trade in west africa project

chainsaw milling and lumber trade in west africa project

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

METHODOLOGIES:Sampl<strong>in</strong>g Sites for field studiesFor possible variation <strong>in</strong> ecological impact due to <strong>cha<strong>in</strong>saw</strong> <strong>mill<strong>in</strong>g</strong> it was noted that samplesites should be based on the ma<strong>in</strong> forest types <strong>in</strong> each country. So field studies must beconducted <strong>in</strong> all the various ecological zonesNIGERIA: In the light of the variation <strong>in</strong> federal <strong>and</strong> state laws govern<strong>in</strong>g <strong>cha<strong>in</strong>saw</strong> <strong>lumber</strong><strong>and</strong> the variation <strong>in</strong> environmental impact due to vegetation type, the study will be carried out<strong>in</strong> the south/<strong>west</strong>, savannah <strong>and</strong> the Cross River State to give a fair representation of vegetationtypes <strong>and</strong> state laws some of which allow or disallow cha<strong>in</strong>-saw<strong>in</strong>gGHANA: The field studies will be carried out <strong>in</strong> Kade, Techiman, Goaso <strong>and</strong> Nkawie forestDistrict. These areas have vary<strong>in</strong>g records of illegal timber <strong>and</strong> <strong>cha<strong>in</strong>saw</strong> <strong>mill<strong>in</strong>g</strong> operations.For <strong>in</strong>stance Techiman serves as exist for movement of timber to the savannah zones <strong>and</strong> theSahelian countries of Bourk<strong>in</strong>a Faso, Mali <strong>and</strong> Niger. Kade district is notorious for illegallogg<strong>in</strong>g.CAMEROON: ABSENT. The <strong>project</strong> leader is to contact him as soon as possible.BUDJECT:It was presumed that s<strong>in</strong>ce FORIG is the ma<strong>in</strong> client to the contractual agreement with DFID, itis expected that a sub-contract will be signed between FORIG <strong>and</strong> the other collaborators.Clarification <strong>and</strong> further directives on this issue has to be sought from NRI. If this presumptionproves to be the case then we should expect delays <strong>in</strong> the transfer of funds to the othercollaborators. In event of this situation collaborators should work out local arrangements topre-f<strong>in</strong>ance the activities especially s<strong>in</strong>ce we are work<strong>in</strong>g aga<strong>in</strong>st time.CONCLUSION:Cha<strong>in</strong>saw operation needs to be regularized to ensure optimum benefit to all segments ofsociety. It is a requirement for all stakeholders to put fore their expertise to see this problemresolved.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!