12.07.2015 Views

Lake Altoona (PA) Dam Improvements - Gwin, Dobson & Foreman, Inc.

Lake Altoona (PA) Dam Improvements - Gwin, Dobson & Foreman, Inc.

Lake Altoona (PA) Dam Improvements - Gwin, Dobson & Foreman, Inc.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Altoona</strong> Water Authority<strong>Lake</strong> <strong>Altoona</strong> <strong>Dam</strong> <strong>Improvements</strong>Prepared by:Mark Glenn, P.E., President<strong>Gwin</strong>, <strong>Dobson</strong> & <strong>Foreman</strong>, <strong>Inc</strong>.June 7, 2001


Basic Information Owner - <strong>Altoona</strong> (<strong>PA</strong>) City Authority Type - Earth <strong>Dam</strong> & Concrete Core Wall Location -Central <strong>PA</strong> (Horseshoe Curve) Purpose - Potable Water Supply Capacity - 836 Million Gallons Height - 75 feet, Crest - 1,800 feet


History Designed by C.W. Knight, Rome, NY Constructed in 1913 1978 COE Phase I Inspection Seriously Inadequate Spillway (28%PMF)


Old Intake Tower


Existing Broad Crested Weir Spillway


Existing Bypass Channel


Existing Spillway Discharge


Design Criteria PMF - 30,700 CFS (12.4 Sq. Mi.) Maintain Existing Reservoir Storage Spillway Discharge to Curvilinear BypassChannel Mitigate Effects of Supercritical Flowand Cross Wave Formation Failure of Two Upstream <strong>Dam</strong>s CannotBreach <strong>Lake</strong> <strong>Altoona</strong>


<strong>Lake</strong> <strong>Altoona</strong> <strong>Dam</strong> & Reservoir


Design Solution Floodwall (7) Used to <strong>Inc</strong>reaseSpillway Head & Reduce Spillway Widthto 132 Inflatable <strong>Dam</strong> Deflates During PMF &<strong>Inc</strong>reases Spillway Head (4) Computer Modeling Showed a SideChannel Spillway Would Avoid RapidlyVaried Flow & Cross Wave Formation Stability Analysis Favorable withModifications (Rapid Drawdown Factor


Spillway, Floodwall & Intake Tower


Ogee Weir Overflow


Side Channel Spillway and Bypass Channel


Other Features Intake Tower Surface Rehabilitation Intake Tower Addition and Building 36 Intake/60 Blowoff Relocations Bypass Channel Pressure MortarSurfacing Access Roads & Bridges Inflatable <strong>Dam</strong> and Control Building Embankment Erosion Protection andToe Drain


Intake Tower and Flood Wall


<strong>Dam</strong> Embankment Access Road


Construction Project Cost - $8,000,000 Construction Started - April, 1998 Construction Completed - August, 2000 Project Financed Through WaterRevenue Bonds and State PennvestProgram


Floodwall Construction


Overflow Ogee Section Construction


Spillway Ogee Weir Construction


Side Channel Spillway Walls & Counterforts


Approach Channel Work


Approach Channel and Left Abutment Area


Side Channel Spillway Construction


Spillway Construction


Bypass Channel Construction


Spillway Channel Construction


Bypass Channel - Pressure Mortar Surfacing


Intake Tower Pressure Mortar Surfacing


Intake Tower & Bridge


Embankment


Spillway Channel & Access Bridge


Overflow - Inflatable Rubber <strong>Dam</strong>


<strong>Lake</strong> <strong>Altoona</strong> <strong>Dam</strong> & Reservoir

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!