12.07.2015 Views

Report on Cold Chain Assessment of Jharkhand - 2005 - Nccvmtc.org

Report on Cold Chain Assessment of Jharkhand - 2005 - Nccvmtc.org

Report on Cold Chain Assessment of Jharkhand - 2005 - Nccvmtc.org

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Cold</strong> <strong>Chain</strong> <strong>Assessment</strong> in <strong>Jharkhand</strong>NumberN<strong>on</strong> functi<strong>on</strong>alFuncti<strong>on</strong>alDistrict<strong>of</strong> sitesDhanbad 9 13290 810Dumka 11 5134 130East Singhbhum 10 9000 3020Garhwa 9 7175 400Giridih 13 10020 1875Godda 8 5420 355Gumla 11 9928 210Hazaribagh 15 13050 2275Jamtara 5 5810 110Koderma 4 2425 1075Latehar 7 3078 111Lohardaga 6 3560 400Pakur 6 7735 800Palamu 11 7000 650Ranchi 24 13647 610Sahebganj 8 6150 50Saraikela Kharsawan 9 10120 30Simdega 9 2525 205West Singhbhum 13 18120 305Grand Total 213 176916 160896.3. Power supplyCrucial to the efficiency <strong>of</strong> the cold chain equipment is the availability <strong>of</strong> regular, c<strong>on</strong>tinuousand reliable power supply with adequate voltage, and, in the case <strong>of</strong> power failure, the availability<strong>of</strong> operati<strong>on</strong>al and regularly serviced back-up facilities.Insufficient voltage cannot run an ILR, which requires eight hours <strong>of</strong> good quality powersupply in order to hold over for 16 hours without power 9 . 32 PHCs in the state have have nopower supply at all. At some sites, the DFs were being used as ILRs due to insufficient voltage,with the DFs being unable to maintain freezing c<strong>on</strong>diti<strong>on</strong>s. The reas<strong>on</strong>s for irregular orno power supply ranged from transformer breakdowns to disc<strong>on</strong>necti<strong>on</strong> due to n<strong>on</strong>-payment<strong>of</strong> dues." <strong>Cold</strong> roomsAt the central store, the power supply is dependable with no voltage fluctuati<strong>on</strong>. The site isequipped with 3 WICs and 1 WIF. But the auto-start generators have broken down.However, at the Giridih district store, which has a WIC, the power supply is unreliable withfrequent voltage fluctuati<strong>on</strong>s. The WIC was installed here in order to facilitate vaccine distributi<strong>on</strong>.As so<strong>on</strong> as the WIC is repaired, it is imperative that the automatic power back-up systemsbe repaired as the 4 generators are manually operated at present." District stores and PHCsOnly 80 <strong>of</strong> the 213 sites assessed have reliable power supply. At 71 PHCs, there is less than 8hours <strong>of</strong> regular power; 29 sites suffer from low voltage c<strong>on</strong>tinuously, although the power9 Immunizati<strong>on</strong> in practice: Module 3: The <strong>Cold</strong> <strong>Chain</strong>: WHO30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!